建设工程施工合同(GF-2013-0201)中英文翻译件范本(共24页).doc

上传人:飞****2 文档编号:14381350 上传时间:2022-05-04 格式:DOC 页数:24 大小:168KB
返回 下载 相关 举报
建设工程施工合同(GF-2013-0201)中英文翻译件范本(共24页).doc_第1页
第1页 / 共24页
建设工程施工合同(GF-2013-0201)中英文翻译件范本(共24页).doc_第2页
第2页 / 共24页
点击查看更多>>
资源描述

《建设工程施工合同(GF-2013-0201)中英文翻译件范本(共24页).doc》由会员分享,可在线阅读,更多相关《建设工程施工合同(GF-2013-0201)中英文翻译件范本(共24页).doc(24页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、精选优质文档-倾情为你奉上工程编号:_ Project No.: 合同编号:_Contract No.: 建 设 工 程 施 工 合 同Construction Contract for Construction Projects(GF-2013-0201)工程名称: Name of project: 工程地点: Location of project: 发 包 人: Client: 承 包 人: Contractor: 制定住房和城乡建设部国家工商行政管理总局Made byMinistry of Housing Urban-Rural DevelopmentState Administrat

2、ion for Industry & Commerce of the P. R.C目 录Table of ContentsPart I Contract Agreement .17 7 I. Project Overview . 17 II. Project Duration under Contract . 18 8 III. Quality Standard .18 IV. Contract Price and Form of Contract Price .18 V. Project Manager .19 VI. Composition of Contract Prices . 19

3、VII. Undertakings . 20 .20 VIII. Meanings of Terms . 20 IX. Time of Signing .21 1 X. Place of Signing .21 1 XI. Supplementary Agreement. 21 1 XII. Effectiveness of Contract .21 1 XIII. Counterparts of Agreement .2123Part Two General Conditions of Contract .2331. General Stipulations .2331.1 Definiti

4、ons and Interpretations . 2391.2 Language .2901.3 Applicable Laws . 3001.4 Standards and Specifications . 3011.5 Order of Priorities of Contract Documents .3121.6 Drawings and Contractors Documents . 32 31.7 Contacts .3341.8 Bribery Strictly Forbidden . 3441.9 Fossils, Cultural Relics . 3451.10 Traf

5、fic and Transportation .3571.11 Intellectual Property Rights .3781.12 Confidentiality .3891.13 Correction of the Errors in the Bill of Quantities .3992. The Client.3992.1 License or Approval .3902.2 Representative of the Client . 4002.3 Personnel of the Client . 4012.4 Supply of Construction site, C

6、onstruction Conditions and Basic Information.41 22.5 Certificate of Source of Funds and Payment Guarantee. 4222.6 Payment for Contract Price . 4232.7 Acceptance of the Project Completion . 4332.8 Overall Administration & Management Agreement of Worksite. 4333. The Contractor . 4333.1 General Obligat

7、ions of the Contractor .4353.2 Project Manager .4573.3 Personnel of the Contractor .4783.4 Field Survey by the Contractor .4893.5 Sub-contracting .493.6 Care of Project; Protection of Finished/Semi-finished Products. 5013.7 Performance Guarantee .5123.8 Integrated Complex .5224. The Supervisor .5224

8、.1 General Provisions on the Supervisor .5234.2 Supervisory Personnel .5334.3 Instructions from the Supervisor . 5344.4 Consensus or Decision. 5455. Quality of Project . 5555.1 Quality Requirement . 5555.2 Quality Assurance Measures .5575.3 Inspections of Concealed Works .5795.4 Handling of the Unqu

9、alified Works .595.5 Quality Disputes Detection .5906. Safe and Civilized Construction and Environmental Protection . 6006.1 Safe and Civilized Construction . 6056.2 Occupational Health. 6566.3 Environment Protection. 6677. Project Duration and Progress .6777.1 Construction Organization Design. 6787

10、.2 Construction Progress Schedule. 6897.3 Commencement of Construction. 6907.4 Measurement and Setting-Out .7017.5 Delay in Project Duration . 7127.6 Adverse Physical Conditions. 7237.7 Extraordinarily Vicious Weather Conditions. 7337.8 Suspension of Construction .7367.9 Earlier Completion .7678. Ma

11、terials and Equipment .7778.1 The Materials and Engineering Equipment Supplied by the Client .7778.2 The Materials and Engineering Equipment to be Purchased by the Contractor.77 88.3 Acceptance and Rejection of Materials and Engineering Equipment .7898.4 Custody and Use of Materials and Engineering

12、Equipmentnt .7908.5 Use of Unqualified Materials and Engineering Equipment Not Allowed .8018.6 Samples .8128.7 Substitution of the Materials and Engineering Equipment. 8238.8 Construction Equipment and Temporary Facilities. 8348.9 Exclusive Usages of the Materials and Equipment . 8459. Tests and Ins

13、pections .8559.1 Test Equipment and Personnel .8559.2 Sampling .859.3 Testing and Inspection of the Materials, Engineering Equipment and Project. 8679.4 Onsite Process Test. 87710. Change. 87710.1 Scope of Change .87810.2 Rights of Change. 88810.3 Procedures for Change. 88910.4 Change of Estimates P

14、rice .89010.5 Rationalization Proposals of the Contractor. 90110.6 Adjustments of Project Duration Caused by the Change . 91110.7 provisional Estimates Price .91410.8 Provisional Amount .94410.9 Daywork. 945511.1 Adjustment Caused by Fluctuation of Market Prices .9511.2 Adjustments Cause by Changes

15、in Laws .1000112. Contract Prices, Measurements and Payments . 1010112.1 Forms of Contract Prices . 1010212.2 Advance Payments .1020312.3 Measurements .1030512.4 Progress Payment of Project. 1051012.5 Accounts of Payments. 1101013. Acceptance and Trial run of Project. 11013.1 Acceptance of the Sub-p

16、roject. 1101113.2 Final Acceptance . 1111413.3 Trial Run of Project. 1141613.4 Acceptance of the Units of Project Handed over in Advance .1161713.5 Operational during the Constructional Period. 1171813.6 Withdrawal after Completion. 1181914. Final Account on Completion .1191914.1 Application for Fin

17、al Account on Completion. 1191914.2 Examination on Final Account on Completion .1192114.3 Agreement on Part of the Works to be Completed after the Completion Date .1212114.4 The Final Settlement .1212215. Defect Liabilities and Warranty .1222215.1 Guidelines for the Warranty of the Project. 1222315.

18、2 Defect Liability Period .1232415.3 Quality Bond .1242515.4 Warranty. 1252716. Breach of Contract. 1272716.1 Breach by the Client . 1273016.2 Breach by the Contractor .1303316.3 Breach Caused by the Third Party.1333417. Forces Majeure.1343417.1 Confirmation of Forces Majeure .1343417.2 Notification of Forces Majeure .1343517.3 Responsibilities for Consequences of Forces Majeure .1353617.4 Dissolution of the Contract due to Forces Majeure.1363718. Insurance .1373718.1 Insurance on Project .1373818.2 Employment Injury Insurance. 13838

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 教案示例

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁