1、 Siemens AG 2012.All rights reserved.EPC Customer DaysGas Turbines for SCPP and CCPP business应用于简单循环和联合循环的燃气轮机 Siemens AG 2012E F PR MK P4FMarch 2012Page 2Michael MoellerThe H-class marks the latest step of a remarkable efficiency evolution in combined cycle technologyH 级燃气轮机在联合循环技术中代表了最先进的技术,引领效率变革
2、级燃气轮机在联合循环技术中代表了最先进的技术,引领效率变革1991199620012008/2011SGT5-2000ESGT5-4000FSGT5-4000FSGT5-8000H52%Efficiency*Killingholme2 x 470 MW,2x(2+1)56%Efficiency*Didcot B1&2 702+710 MW,2x(2+1)58%Efficiency*Mainz-Wiesbaden400 MW,(1+1)60%Efficiency*Irsching 4SCC5-8000H 1S 570 MWBasis-7.1%-10.3%-13.3%Reduction of CO
3、2emissions/减少CO2排放Advanced GT technology allows for significant improvement of competitiveness and serves as basis for CO2 reduction of gas fired generation在在CO2减排的大背景下,先进的燃气轮机技术显著的提高了天然气发电的竞争性减排的大背景下,先进的燃气轮机技术显著的提高了天然气发电的竞争性Net efficiency achievable with this technology/project specific efficiencie
4、s may vary可以达到的净效率/效率随项目条件变化而变化 Siemens AG 2012E F PR MK P4FMarch 2012Page 3Michael MoellerGas Turbines燃气轮机燃气轮机Steam Turbines蒸汽轮机蒸汽轮机Condensers凝汽器凝汽器Generators发电机发电机 Auxiliaries 辅助系统辅助系统 Electrical Systems*电气系统电气系统 Instrumentation&Control*仪控系统仪控系统 Air Intake 进气系统进气系统 Exhaust Diffuser 排气系统排气系统 Other
5、其他其他Technical Field Assistance(TFA)现场技术支持现场技术支持Transportation运输运输WEB access to design dataWeb可访问设计数据可访问设计数据Core components and system integration for package scope燃气轮机包和蒸汽轮机包范围中的核心部件以及系统整合燃气轮机包和蒸汽轮机包范围中的核心部件以及系统整合Steam Turbine PackageGas Turbine Package*for Package scope only,including Turboset I&C
6、Products for component business:对于仅产品供货的合作模式对于仅产品供货的合作模式Gas turbine packages and steam turbine packages 燃气轮机包和蒸汽轮机包燃气轮机包和蒸汽轮机包Extended Scope扩展范围扩展范围Full Erection&Commissioning整体建设和调试整体建设和调试Plant Control System(by IE)全厂控制系统全厂控制系统Bypass Stack旁路烟囱旁路烟囱 Siemens AG 2012E F PR MK P4FMarch 2012Page 4Michael
7、 MoellerBenefits 优点优点Features 特点特点Fast and reliable project implementation with high product quality过硬的产品质量保证了项目执行的快速和可靠过硬的产品质量保证了项目执行的快速和可靠Flexibility to match customer-and site-specific needs灵活性满足不同客户和不同现场条件的要求Accelerated commissioning and construction加快了调试和建设速度Optimized proposal efforts and risk
8、mitigation优化的投标书,减少了风险优化的投标书,减少了风险Standardization of design and assembly with pre-defined inter-faces within the overall power plant and use of proven components标准化的设计和组装,使用已经验证的技术Pre-defined options that can be added to the base scope已设计好的可选项可以加入到基本范围之中Pre-assembled systems delivered to site预组装的系统直
9、接交付现场Engineering support right from the start(even during proposal phase)从一开始就提供及时的工程支持(甚至在投标阶段就开始)Components business:产品供货模式产品供货模式Features and benefits 特点和优点特点和优点 Siemens AG 2012E F PR MK P4FMarch 2012Page 5Michael MoellerSiemens large scale Gas Turbines:The right engine for every applicationSiemen
10、s 大容量燃气轮机:各种应用的正确选择大容量燃气轮机:各种应用的正确选择50 Hz292(423)MW*168(250)MW*60 Hz274 (410)MW*227 MW113(171)MW*SGT5-8000HSGT5-4000FSGT5-2000ESGT6-2000ESGT6-5000FSGT6-8000H375(540)MW*GT value(in brackets:single shaft value-in case of SGT-2000E series:multi shaft 1x1)燃气轮机简单循环出力(括号中:单轴联合循环出力,燃气轮机简单循环出力(括号中:单轴联合循环出力,
11、SGT-2000E系列为多轴系列为多轴1拖拖1联合循环出力)联合循环出力)Siemens AG 2012E F PR MK P4FMarch 2012Page 6Michael MoellerSGT-2000E seriesSGT-2000E系列系列Reliable,robust,flexible可靠,坚固,灵活可靠,坚固,灵活-Design maturity fleet experience-设计成熟性设计成熟性 机群经验机群经验-Operating on a wide range of fuels-可以使用多种燃料运行可以使用多种燃料运行-For SCPP,CCPP-应用于简单循环,联合循
12、环应用于简单循环,联合循环 Siemens AG 2012E F PR MK P4FMarch 2012Page 7Michael MoellerTwo large external silo-type combustors with 2x8(2x6 for 60Hz)hybrid burners两个大型外置筒型燃烧室,带有2x8(60Hz产品为2x6)个混合燃烧器Cold end drive冷端驱动冷端驱动SGT-2000E series SGT-2000E 系列系列Reliable,robust,flexible 可靠,坚固,灵活可靠,坚固,灵活One compressor row wit
13、h variable inlet guide vane,fast acting for grid frequency stabilization压气机带有1级导流静叶,可以快速反应,稳定电网频率Axial exhaust for ease of CC process轴向排气易于联合循环应用Built disc-type rotor with radial Hirth-serrations and one central tie rod.中心拉杆,带有Hirth齿的盘式转子 Siemens AG 2012E F PR MK P4FMarch 2012Page 8Michael MoellerBe
14、nefits 优点优点Features 特点特点Robust and Proven Design坚固和已经验证的技术Fuel Flexibility燃料灵活性World Class Reliability/Availability世界级的可靠性和可用率世界级的可靠性和可用率Operational Flexibility运行灵活性运行灵活性Low Specific Price 低造价低造价Operational Confidence 运行可靠运行可靠Wide range of gaseous and liquid fuels广泛的气体和液体燃料经验广泛的气体和液体燃料经验Special Fuel
15、 Support based on Standard Design在基本设计基础之上的特殊燃料支持在基本设计基础之上的特殊燃料支持Part Load Capability 部分负荷能力部分负荷能力Flexible Grid Support 灵活的电网支持灵活的电网支持Low Emissions 低排放低排放Excellent Start-Up Performance优异的启动性能优异的启动性能Low CAPEX初投资低初投资低SGT-2000E series SGT-2000E 系列系列Features and benefits 特点和优点特点和优点 Siemens AG 2012E F PR
16、 MK P4FMarch 2012Page 9Michael MoellerSGT6-PAC 2000E Crude Oil reference:原油运行经验原油运行经验Hail II(Saudi Arabia)Customer:Saudi El.Comp.End customer:Plant type:SCPPConfiguration:Com.operation:2011Features 特点特点 Short delivery time thanks to standardized systems 标准化的系统缩短了交货时间 Short erection and commissioning
17、 time enabled by TFA concept TFA的帮助缩短了建设和调试时间 High reliability and operational flexibility 高可靠性和运行灵活性Scope of supply 供货范围供货范围Two SGT6-PAC 2000E Crude Oil gas turbine packages each consisting of:SGT6-2000E CO gas turbine/SGT6-2000E 燃气轮机(以原油为燃料)SGen6-100A generator/SGen6-100A 发电机 Aux.,air intake,exhau
18、st,fuel skid(inhibitor-/turbine wash skid),others 辅助系统,进气系统,排气系统,燃料模块及其他Project and customer specifics 项目和客户简介项目和客户简介 First-time installation and commissioning of EPC EPC 第一次安装和调试 CAPEX-driven customer 对初投资敏感的客户Benefits 优点优点 Early plant operation 更早进入商业运行 Securing a reliable energy supply at increas
19、ed load demand during summer season in Kingdom of Saudi Arabia 在夏季用电负荷激增时,确保了沙特的能源的可靠供应 Siemens AG 2012E F PR MK P4FMarch 2012Page 10Michael Moeller1)12 month rolling average 2)Status 01/2012 SGT-2000E series fleet has accumulated 20 Mio EOHsGas Turbine SGT-2000E series:Fleet data Availability and R
20、eliability is on World Class Level The Reliability of SGT5-2000E is at a level of 99%1)The current Availability(depending on major outages)is 94%1)Operating experience50Hz:15.0 Mio EOH 285.000 EOH fleet leader60Hz:5.0 Mio EOH 146.000 EOH fleet leaderFleet Status(w/o licensees)*50Hz:204 units in oper
21、ation 36 before first fire60Hz:82 units in operation 5 before first fireAz Zour,Kuwait,SCPPKilling Home,UK,CCPP 2x1Muara Tawar,CCPP 2x1Paka,Malaysia,CCPP 2x1 Siemens AG 2012E F PR MK P4FMarch 2012Page 11Michael MoellerSGT-2000E series performance that speaks for itself50 Hz60 HzSiemens Gas Turbine*G
22、ross power output MWGross efficiency%Pressure ratio Exhaust temperature C/FExhaust mass flow kg/sExhaust mass flow lb/sGas Turbine EmissionsNOxppmCO ppmGas Turbine Physical DimensionsWeight tLength mHeight mWidth mSGT5-2000E168,93512541/1,0055251157,4SGT5-2000E2510SGT5-2000E234107.512SGT6-2000E11434
23、,712.1540/1,004365804,7SGT6-2000E25 9.7 Mio EOHsGas Turbine SGT-4000F series:Fleet data Availability and Reliability is on World Class Level The Reliability of SGT5-4000F is at a level of 98%1)The current Availability(depending on major outages)is 94%1)Operating experience50Hz:7.5 Mio EOH 118.000 EO
24、H fleet leader60Hz:2.2 Mio EOH 106.000 EOH fleet leaderFleet Status(w/o licensees)*50Hz:239 units in operation 64 before first fire60Hz:51 units in operation 8 before first fireBASF Antwerpen,Belg,CCPP 1SRas Laffan B,Qatar,CCPP 3x2Tahaddart,Morocco,CCPP 1SPhu My 3,Vietnam,CCPP 2x1 Siemens AG 2012E F
25、 PR MK P4FMarch 2012Page 20Michael MoellerContinuous product development ensuresthe competitiveness of our customersSGT5-4000F:Reliable working horse“with state-of-the-art technology1996240 MW/37.0%2000266 MW/38.6%2008292 MW/39.8%2nd compressor upgrade Combustor CoolingAir Saving Hydraulic Clearance
26、 Optimization Fuel Gas Preheating Cooling Air Reduction2004287 MW/39.5%MarketIntroduction1.Upgrade2.UpgradeLatest upgrade 1st compressor upgrade Siemens AG 2012E F PR MK P4FMarch 2012Page 21Michael MoellerSGT5-4000F performance that speaks for itself50 HzSiemens Gas Turbine*Gross power output MWGros
27、s efficiency%Pressure ratio Exhaust temperature C/FExhaust mass flow kg/sExhaust mass flow lb/sGas Turbine EmissionsNOxppmCO ppmGas Turbine Physical DimensionsWeight tLength mHeight mWidth mSGT5-4000F29239.818.2577/1,0716921,526SGT5-4000F2510SGT5-4000F3081386*ISO ambient conditions Siemens AG 2012E
28、F PR MK P4FMarch 2012Page 22Michael MoellerSCC5-4000F combined cycle performance that boosts your business50 HzSiemens Combined Cycle Power PlantSingle-shaftNet power output MWNet efficiency%Net heat rate kJ/kWhCombined Cycle Start-up time SCC5-4000F 1S42358.46,164 30 MinutesMulti-shaftNet power out
29、put MWNet efficiency%Net heat rate kJ/kWhCombined Cycle Start-up time SCC5-4000F 2x184858.5 7.5 Mio EOHsGas Turbine SGT6-5000F:Fleet data Availability and Reliability is on World Class Level The Reliability of SGT6-5000F is at a level of 99%1)The current Availability(depending on major outages)is 96
30、%1)Operating experience60Hz:7.5 Mio EOH 140K EOH fleet leaderFleet Status(w/o licensees)*60Hz:240 units in operation 65 before first fireBennet Mountain,USA,SCPPPayne Creek,USA,CCPPLakeside Power Plant,CCPP 2x1Merida Power Plant,CCPP2x1 Siemens AG 2012E F PR MK P4FMarch 2012Page 27Michael MoellerSGT
31、6-5000F performance that speaks for itself60 HzSiemens Gas Turbine*Gross power output MWGross efficiency%Pressure ratio Exhaust temperature CExhaust mass flow kg/sExhaust mass flow lb/sGas Turbine EmissionsNOxppmCO ppmGas Turbine Physical DimensionsWeight tLength mSGT6-5000F23038.117.26105081,118SGT
32、6-5000F94SGT6-5000F26310.13*ISO ambient conditions Siemens AG 2012E F PR MK P4FMarch 2012Page 28Michael MoellerSCC6-5000F combined cycle performance that boosts your business60 HzSiemens Combined Cycle Power PlantMulti-shaftNet power output MWNet efficiency%Net heat rate kJ/kWhSCC6-5000F 2x162057.26
33、,205 Siemens AG 2012E F PR MK P4FMarch 2012Page 29Michael MoellerSGT-8000H seriesSGT-8000H 系列系列The reference for reliable and flexible combined cycle efficiency可靠而灵活的联合循环典范可靠而灵活的联合循环典范 Siemens AG 2012E F PR MK P4FMarch 2012Page 30Michael Moeller 60%combined cycle efficiency联合循环效率效率大于60%SGT5-8000HEff
34、icient&FlexibleSGT5-8000H高效灵活高效灵活4 stages of fast acting variable-pitch guide vanes(VGV)allowing for improved part load efficiency and high load transients快速响应的4级可调静叶可增加部分负荷工况的效率,提高负荷加载率可增加部分负荷工况的效率,提高负荷加载率Proven rotor design(Hirth serration,central tie rod,internal cooling air passages)for world cl
35、ass fast(cold)start and hot restart capability可靠的转子设计(端面齿,中心拉杆,内部冷却空气通道使得燃机具有世界一流的快速(冷)启动和热态启动的能力)High cycling capability due to fully internally air cooled turbine section完全内部空气冷却使得透平有优越的交变负载性能交变负载性能Evolutionary 3D blading改进的三维叶片3D Four stage turbine with advanced materials and thermal barrier coat
36、ing采用先进材料和热障涂层的三维4级透平HCO for reduced clearance losses液压间隙优化系统(HCO)可降低间隙损失Transient protection of clearances for reduced degradation with hydraulic clearance optimization(HCO)active clearance controlHCO的主动间隙控制的主动间隙控制可提供瞬态间隙保护,并减少燃机老化影响Advanced Can Annular combustion system先进的环管燃烧系统Performance feature
37、s性能特点Flexibility features灵活性特点Designed for 60%efficiency in combined cycle and best in class operational flexibility为效率高于为效率高于60%,运行灵活性卓越的联合循环而设计,运行灵活性卓越的联合循环而设计 Siemens AG 2012E F PR MK P4FMarch 2012Page 31Michael MoellerBenefits客户收益客户收益Features特点特点Best available customer value:-economy of size-max
38、imum return of invest over lifetime客户可获得的最大价值:-规模效益-贯穿整个项目周期的投资收益率最大化Low downtimes to ensure increased revenues for customer减少停机时间,增加客户收益Secures customer value even if future operation regime is unclearSimple plant control;easy implementation into 3rd party plant solution即使在未来运行方式不确定的情况下也能保证客户的利益操作简
39、单的电厂控制;可轻松实现第三方电厂方案Maximum customer benefit due to lowest possible customer risk降低潜在的客户风险,将客户利益最大化Designed for superior power output and efficiency为大出力和高效率而设计Designed for reliability and maintainability为可靠性和可维护性设计Designed for Flexibility and Simplicity(e.g.fully air-cooled design;no interfaces to St
40、eam Cycle)为灵活和简易而设计(例如,完全内部空气冷却设计;无蒸汽系统接口)Underwent the most stringent validation program ever conducted in the industry经过了业内最为严苛的验证试验SGT-8000H seriesFeatures and benefitsSGT-8000H系列特点与客户收益系列特点与客户收益 Siemens AG 2012E F PR MK P4FMarch 2012Page 32Michael MoellerSCC5-PAC 8000H 1S reference:Plant“Ulrich
41、Hartmann”(Irsching 4),GermanySCC5-8000H单轴联合循环业绩德国单轴联合循环业绩德国Ulrich Hartmann(Irsching 4)电厂)电厂Customer:EON Generation客户:客户:E ON 电力电力Plant type:CCPP电厂类型:联合循环电厂类型:联合循环Configuration:single shaft配置:单轴配置:单轴Com.operation:2011商业运行:商业运行:2011年年Features特点特点 state of the art combined cycle plant with world record
42、 net efficiency拥有净效率世界记录的一流联合循环电厂 plant designed for maximum flexibility为最大的灵活性而设计Scope of supply 供货范围供货范围SCC5-PAC 8000H 1S package consisting of:SCC5-PAC 8000H单轴设备包的组成:SGT5-8000H gas turbineSGT5-8000H燃机SGen5-3000W generator/SST5-5000 steam turbineSGen5-3000W发电机/SST5-5000汽轮机Auxiliaries,air intake,ex
43、haust and other systems辅助设备,进气系统,排气系统及其他Project and customer specifics项目和客户信息Simple Cycle Test plant for extensive GT testing,later extended to turnkey 1S plant为进行全面的燃机测试而建造的单循环试验电厂,后扩建成交钥匙单轴联合循环电厂Efficiency driven customer;Plant operating per grid dispatch in highly fluctuating grid in Germany(from
44、 daily start-stop to continuous base load)注重效率的客户;根据德国的电网调度,电厂运行于负荷波动很大的电网环境下(从日常的启停到连续的基本负荷)Benefits 客户收益客户收益 The Plant is the main pillar for stable power generation in E.ONs plant portfoilo in southern Germany该电厂成为E ON电力在德国南部电厂中的稳定电力供应的支柱 Customer can serve any dispatch need with the plant客户可以通过电
45、厂来满足任意的电网调度要求 Siemens AG 2012E F PR MK P4FMarch 2012Page 33Michael MoellerAnswers to customer requirements客户需求的解决方案客户需求的解决方案-Fast and reliable project implementation快速可靠的项目实施快速可靠的项目实施-Flexibility to match customer and site specific needs极高的灵活性以满足客户和现场的具体要求极高的灵活性以满足客户和现场的具体要求 Siemens AG 2012E F PR MK
46、 P4FMarch 2012Page 34Michael MoellerBenefits客户收益客户收益Features特点特点Fast and reliable project implementation with high product quality卓越的产品质量卓越的产品质量,快速可靠快速可靠的项目实施Flexibility to match customer-and site-specific needs极高的灵活性极高的灵活性以满足客户和现场的具体要求Accelerated commissioning and construction加快加快调试和建造的进度Compact pl
47、ant size布置紧凑紧凑Standardization of design and assembly with pre-defined inter-faces within the overall power plant and use of proven components设计和装配的标准化标准化(预先定义全厂接口),使用经验证技术成熟的设备Pre-defined options that can be added to the base scope预先定义的选项设备预先定义的选项设备可增加到基本供货范围内Pre-assembled systems delivered to site系
48、统经预装配后预装配后发运至现场Small footprint arrangement占地面积小Components business:Features and benefits设备业务模式:特点和客户收益设备业务模式:特点和客户收益 Siemens AG 2012E F PR MK P4FMarch 2012Page 35Michael MoellerAccelerated commissioning and construction due topre-assembled systems delivered to site经预装配发运至现场的系统可加快调试和建造进度经预装配发运至现场的系统可
49、加快调试和建造进度Auxiliary systems frame mounted as built in power plant辅助系统辅助系统撬装式撬装式与实际安装在电厂中一致与实际安装在电厂中一致Enclosure for explosion protection防爆罩壳Hydraulic power unit液压模块Instrument air package仪用压缩空气模块Lube oil package for gas turbine and electrical generator燃机和发电机共用的润滑油模块oil mist eliminator排油雾机Lifting oil pu
50、mp顶轴油泵Emergency(lube)oil pump紧急(润滑)油泵Fuel gas packageIgnition gas package燃气模块点火燃气模块Lube oil cooling system润滑油冷却系统 Siemens AG 2012E F PR MK P4FMarch 2012Page 36Michael Moellerincreased performance and power output提高性能,增加出力Support during construction and commissioning在安装调试阶段提供支持Proven product quality经