(8)--8-Gas Buildup Test with Constant气藏工程气藏工程.ppt

上传人:奉*** 文档编号:96637566 上传时间:2024-02-01 格式:PPT 页数:14 大小:1.06MB
返回 下载 相关 举报
(8)--8-Gas Buildup Test with Constant气藏工程气藏工程.ppt_第1页
第1页 / 共14页
(8)--8-Gas Buildup Test with Constant气藏工程气藏工程.ppt_第2页
第2页 / 共14页
点击查看更多>>
资源描述

《(8)--8-Gas Buildup Test with Constant气藏工程气藏工程.ppt》由会员分享,可在线阅读,更多相关《(8)--8-Gas Buildup Test with Constant气藏工程气藏工程.ppt(14页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、5.8 Analysis of Gas Well Buildup Tests-15.8 Analysis of Gas Well Buildup Tests-1Constant-Rate Production Before Shut InConstant-Rate Production Before Shut InFor a slightly compressible liquidQ-QTTT+tT+tUsing Superposition methodfor a gas well,in terms of adjusted variablesQ-QTTT+tT+tUsing Superposi

2、tion methodFrom the semilog graphfor a gas well,in terms of adjusted variablesextrapolating the straight line to infinite shut-in timeis BHFP at the instant of shut in.Example 5.4-Analysis of a Gas-Well Pressure-Buildup Test With Constant-Rate Production Before Shut-InTABLE 5.9-GAS-WELL PRESSURE-BUI

3、LDUP TEST DATA,EXAMPLE 5.4SolutionAnalysis Using Pressure Variables(Fig.5.25).1.Calculate the slope of the line drawn through the semilog straight line.m=8,989.7-8,545.1=444.6 psi/cycle2.The permeability to gas isat=(2000+1)/1=2001 is 7,522 psia.3.Calculate the skin factor.The pressureUsing Pressure

4、-Squared Variables(Fig 5.26).1.Calculate the slope of the line drawn through the semilog straight line.m=80.67106-73.07106=7.60106psi2/cycle2.The permeability to gas is3.Calculate the skin factor.The term at at =2001 is Using Adjusted Pressure Variables(Fig.5.27)1.Calculate the slope of the line dra

5、wn through the semilog straight line.m=7,553.8-7,117.5=436.3 psi/cycle2.The permeability to gas is3.Calculate the skin factor.At an adjusted Horner time ratio of=(20001)/1=2001,=6114 psia.permeability skin factorPressure Variables 0.029-0.292Pressure-Squared Variables 0.031-1.08Adjusted Pressure Variables 0.03-0.04Compare three methods5.8 Constant-Rate Production Before Shut In(End)

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 大学资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁