1、电电气气仪仪表表工工程程安安装装调调试试记记录录 Hessen was revised in January 2021表 H-421项目:Project装置:Unit工号:Section母线安装记录母线安装记录Bus installation recordBus installation record名称Name电压等级Voltage母线型号、规格Bus model and spec.1、一般安装检查:General installation inspection序号No.1kV施工日期Date图号Drawing No.套管、绝缘子型号Bushing insulator model检查调整项目
2、Inspection and adjustment item安装检查结果Inspection result型号规格材质Model Specification Material型号规格油位、密封绝缘Model Oil level,seal Insulation规格安装尺寸防腐Spec.Dimension Anti-corrosion排列、相色弯曲倍率伸缩节Arrangement,color Curve radius Expansion joint规格热镀锌露出长度Spec.Galvanization Left length光洁平整搪锡电力复合脂Smooth.Enam.Polymer焊工合格证号W
3、eldor No.母线型号、规格、材质核对Bus model,spec,and mat.Inspection绝缘子、穿墙套管检查2Insulator and lead-in insulator母线支架制作安装3Bus support fabrication and installation母线安装检查4Bus installation连接螺栓、垫圈检查5Bolt and washer inspection母线接触面6Bus contact area inspection硬母线焊接检查7Rigid bus welding inspection软母线、组合母线安装8Flexible and com
4、bine bus installation2、母线接触面连接紧密检测:Bus contact.Tightness inspection实测力矩值()螺栓规格螺栓规格Actual torque(mm)(mm)最小值最大值Bolt spec.Bolt spec.Min.Max.实测力矩值()Actual torque最小值最大值Min.Max.螺栓规格(mm)Bolt spec.实测力矩值()Actual torque最小值最大值Min.Max.3、软母线弛度:Flexible bus sag inspection软母线名称Flexible bus name设计弛度(mm)Design sag实测
5、弛度(mm)Actual sag4、母线相同、对地最小距离检测:Bus phase and phase to earth min.Distance measure母线类别Bus type实测最小相间距离(mm)Min.Phase to phase distance实测最小对地距离Min.Phase to earth distance备注:Remarks结论:Conclusion主母线Main分支母线Branch技术负责人Check施工人Operator表 H-422蓄电池充(放)电记录蓄电池充(放)电记录Storage battery charging/DischargingStorage b
6、attery charging/Dischargingrecordrecord项目:Project装置:Unit工号:Section出厂日期Manuf.Date名称Name电压Voltage电解液Electrolyte电解液化验单或合格证号Electrolyte report orcertification No.注入时电解液温度Electrolyte temp.at filling开始注入时间Filling start time初充电First charging充电开始时间Charging starttimeV型号Model容量capacityAh电池总数Number of battery蒸
7、馏水化验单或合格证号Distilled water report or certification No.电解液比重Specific gravity of electrolyte结束时间End time结束时间End time单独补充充电的电池编号Separately charged cell No.放电Discharging放电开始时间Discharge starttime放电电流Discharge current结束时间End time放电容量Discharging capacity为额定容量的%(换算到 25时)%of rated capacity(at 25)充(放)电特性曲线图:(充
8、放电记录见附表)Charging/Discharging characteristic curve备注:Remarks结论:Conclusion技术负责人Check施工人Operator表 H-423蓄电池充(放)电蓄电池充(放)电记录附表记录附表Attached table for storageAttached table for storagebattery charging/Dischargingbattery charging/DischargingrecordrecordV充(放)电电流(A)Charge/Discharge current型号Model容量CapacityNoUD
9、TUNoDTUNoDTAh项目:Project装置:Unit工号:Section出厂日期Manufacture date电池总数Number of batteryNoUDTUNoDTUNoDT名称Name电压Voltage充(放)电时间电压(V)TimeCharge/Discharge voltage技术负责人Check施工人Operator日期Date表 H-424项目:Project装置:Unit工号:SectionkW检查日期Inspection Date额定电压Rated voltage绝缘等级Insulation class防爆等级Explosion proofclass防护等级Pr
10、evention class标记Mark备注RemarkkV电机抽芯检查记录电机抽芯检查记录Motor loose-core inspectionMotor loose-core inspectionrecordrecord名称Name型号Type额定电流Rated current转速Rotation speed出厂编号Manufacturer No.位号Tag.No.额定容量Rated capacity接法Connection转子结构Rotor structure制造厂ManufacturerAr/min检查内容Installation contents铁芯轴颈无伤痕锈蚀No Damage&
11、corrosion on surface of core shaft滑环和换向器无伤痕、锈蚀No Damage&corrosion on surface of commutator and slip-ring绕组绝缘层完好,绑线无松动Winding insulation coating and fixing inspection绕组连接正确,焊接良好Winding connection and welding inspection绕组电阻检测合格Winding resistance inspection定子槽楔无断裂凸出及松动,端部槽楔牢固Stator slot wedge inspectio
12、n转子平衡块紧固,平衡螺丝锁车Rotor balance block and bolt fixing inspection风扇完好,方向正确Fan inspection磁极及铁轭固定良好Magnetic pole and hub fixing inspection励磁绕组紧固Exciter winding fixing inspection鼠笼式电机转子导电条和端环焊接良好,浇铸无裂纹Rotor conductor and end link of squirrel-cage motor轴承滚动体与内、外圈转动灵活无松动、卡涩Bearing rotating flexibility inspec
13、tion加入轴承内的润滑脂已填满内部空间的三分之二Internal space of bearing is filled with lubrication grease电机机部清洁无杂物Motor internal cleanliness inspection结论:Conclusion技术负责人Check施工人Operator表 H-425项目:Project装置:Unit工号:SectionkWVAr/min干燥日期Drying Date绝缘等级Insulation class制造厂Manufacturer出厂日期Manuf.Date出厂编号Manufacturer No.电机干燥记录电机干
14、燥记录Motor drying recordMotor drying record名称Name型号Type定子电压Stator voltage定子电流Stator current接线ConnectionVA位号Tag.No.额定容量Rated capacity转子电压Rotor voltage转子电流Rotor current转速Rotation speed干燥方法简述Brief discription of drying method干燥开始时间Drying start time干燥结束时间Drying end time干燥过程最高温度Max.drying temp.干燥后绝缘电阻及吸收比I
15、nsulation resistance and absorptance after drying年月日时分Date年月日时分Date定子Stator转子Stator.测试部位Test position电机温度()MotortemperatureR15(M)定子对地Stator to earthR60(M)KR15(M)转子对地Rotor to earthR60(M)K备注:Remarks结论:Conclusion技术负责人Check施工人Operator表 H-426项目:Project电机干燥记录附表电机干燥记录附表装置:Attached table for motor dryingAtt
16、ached table for motor dryingUnitrecordrecord工号:Section时间Time温度()Temp.123456定子绝缘电阻(M)Stator ins.resistance转子绝缘电阻(M)Rotor ins.resistance干燥电流(A)Dryingcurrent备注Remark测温点位置:nTemp.measure position1.;2.;3.;4.;5.;6.;技术负责人Check施工人Operator日期Date表 H-427项目:Project装置:Unit工号:Section负载电流(A)No-Loadcurr.电机温度(A)Motor
17、temp.轴承温度()Bearing temp.前Front后Rear环境温度()Envi-ronmenttemp.试车日期Date电机试车记录电机试车记录Motor test run recordMotor test run record额定数据 Rated data序号No.电机名称或位号Motor nameor tag.No.容量(kW)Capa-city电压(V)Vol-tage绝缘等级Ins.class绝缘电阻(M)Ins.resis.试车记录数据 Test run record data电压(V)Vol-tage空载电流(V)Vol-tage电流(A)Curr.备注:Remarks
18、结论:Conclusion技术负责人Check施工人Operator表 H-428项目:Project装置:Unit工号:Section施工日期Date线路长度Length架空线路施工记录架空线路施工记录Overhead line stringing recordOverhead line stringing record线路名称Line name线路电压Voltage线路起点Start place施工记录Stringing record电杆型号、规格及数量Pole model,spec.Quantity导线型号及规格Line model and spec.线数Line number线路终点E
19、nd place绝缘子型号及规格Insulator model and spec.弛度Sag耐张杆号(号一号)Anchor pole(No.No.)设计弛度(mm)Design sag实测驰度(mm)Real sag环境温度()Environment temp.对地、交叉跨越距离测量:Line to earth and to cross-over objects distance measurement拉线材料及组数Stay material andquantity路灯型号及数量Road lamp model andquantity路灯线型号及规格Toad line model and spe
20、c.跨越杆号号一号Cross-overpole.被跨越物名称Cross-overobject name被跨越物对最近杆、塔的水平距离(m)The nearest distance betweencrossover object and pole导线对被跨越物的最小垂直距离(m)Min.Vertical distance fromline to cross-over object温度()Temp.线中绝缘电阻(M)Line insulationresistance相位检查Phase sequence inspection备注:Remarks结论:Conclusion技术负责人CheckAB,C,
21、E,OBA,C,E,OCA,B,E,O施工人Operator表 H-429项目:Project装置:Unit工号:Section避雷、接地装置安装记录避雷、接地装置安装记录Lightning conductor and earthingLightning conductor and earthingdevice installation recorddevice installation record名称Name施工图号Drawing No.1.绘图或简述避雷及接地装置情况(种类、材质、规格、长度、埋入深度、数量、连接方法、尺寸及防腐等)Drawing or brief discription
22、 of the lightning conductor and earthing device(kind,material,specification,buried length,quantity,connection,dimension and anti-corrosion,etc.)2.接地电阻测量记录Grounding resistance measurement record当天及三天前天气情况序号测试位置接地电阻()试验日期Weather of the day and three daysNo.Measure positionGround.resistanceMeasure date
23、ago备注:Remarks结论:Conclusion技术负责人Check施工人Operator试验人Tester表 H-430项目:Project装置:Unit工号:Section电气安装记录电气安装记录Electrical installation recordElectrical installation record技术负责人Check施工人Operator表 H-431项目:Project装置:Unit交流电机试验报告交流电机试验报告AC Motor test reportAC Motor test report工号:Section名称Name额定容量Ratedcapacity定子电压
24、Statorvoltage转子电压Rotorvoltage(kW)型号Model定子电流Statorcurrent转子电流Rotorcurrent位号Tag.No.出厂编号Manuf.No.额定转速Rated rpm相数Phasenumber试验日期Test Date绝缘等级Insulationclassr/min接线方式Connect mode防爆等级E.P.classVAVA直流电阻测量 DC Resistance measure温度 Temp.定子绕组相别Stator phase直流电阻()DC Resistance转子绕组相别()Rotor phase直流电阻()DC Resistan
25、ce各相直流电阻差别DC Resistance deviation绝缘试验Insulation test绕组名称Wind name绝缘电阻(M)Ins.resis吸收比Absorp-tance定子 Stator%;转子 Rotor%;定子绕组极性Stator wind,polar.交流耐压电压(kV)AC Withstandingvoltage时间(mm)Time直流耐压电压(kV)DCWithstandingvoltage时间(mm)Time直流泄漏电流(A)DC Leakagecurrent定子绕组Statorwind转子绕组Rotorwind附属设备检查Auxiliary device
26、test设备名称Device name起动电阻器Start-up resistor可变电阻器Variable resistor灭磁电阻器Magnetic extinguisher备注:Remarks电机轴承绝缘电阻(M)Bearing ins.resistance绝缘电阻(M)Insulation resistance直流电阻()DC Resistance结论:Conclusion技术负责人Check试验人Operator表 H-432项目:Project装置:Unit工号:Section直流电机试验报告直流电机试验报告DC motor test reportDC motor test rep
27、ort名称位号试验日期NameTag.No.Test Date额定容量型号出厂编号励磁方式RatedkWModelManuf.No.Excite modecapacity额定电压额定电流额定转速工作率RatedVRatedAr/minRated rpmWork ratiovoltagecurrent励磁电压励磁电流ExciteVExciteAvoltagecurrent1.试验与检查 Test and inspection环境温度:Environmenttemp.励磁绕组的绝缘电阻及交流耐硬度试验 M kV minExcite wind.Ins.R&AC withstanding voltag
28、e test电枢的绝缘电阻及交流耐压试验M kV minArmtr.Ins.R&AC withstanding voltage test励磁绕组的直流电阻Excite wind DC resistance电枢整流片间的直流电阻Armtr.Back-to-back DC resistance励磁可变电阻器的直流电阻DC R of Excite variable resistor绕组极性及其接线检查Wind.Polar.&connection碳刷位置检查Bruch position inspection2.发电机的空载特性Generator no-Load characteristics励磁电流(
29、A)Excite current电压(V)Voltage备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H-433项目:Project装置:Unit工号:Section试验日期Test Date接线组别Connection%冷却方式Cool.mode变压器试验报告变压器试验报告Transformer test reportTransformer test report名称Name额定容量Ratedcapacity额定电压RatedvoltagekVA型号Model额定电流Ratedcurrent位号Tag.No.出厂编号Manuf.No.阻抗Resi
30、stancekVA直流电阻测量:AC Resistance measure温度:Temp.高压侧HV sideABC()()()()()低压侧LV sideabc电阻()Resistance误差%Error变压比检查:Transformer rate inspection分接开关位置Tap position绝缘试验:Insulation test标称变比Nominalrate高压侧电压/低压侧电压HV/LVUAB/UabUBC/UbcUCA/Uca(V)(V)(A)实测变压比Real rateABBCCA变压比误差(%)Rate errorABBCCA项目Item绝缘电阻及吸收比Ins.R a
31、nd AbsorbtR60/R15吸收比R60/Absorb-R15tance交流耐压试验AC withstandingvoltage test电压时间(kV)(min)VoltageTime直流泄漏试验DC leakage test电压(kV)Voltage电流(A)Current接地组别或极性检查Connectioninspection介质损失角正切值Loose tgtg(%)温度()Temp.高压低压及地HVLV/Earth低压高压及地LVHV/Earth绝缘油试验:油号#;五次击穿电压平均值:kVIns.Oil test:oil No.,average voltage for 5 br
32、eak down is备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H-434项目:Project装置:Unit工号:SectionA试验日期Test Date开断电流M.currentkA断路器试验报告断路器试验报告Circit breaker test reportCircit breaker test report名称Name型号Model操动机构型号Operationmechanism额定电压Ratedvoltage操作电压Oper.voltagekV位号Tag.No.额定电流Ratedcurrent出厂编号Manuf.No.导电回路直流电
33、阻测量DC Resistance of primary circuit相别PhaseABC主触头()Main contact灭弧触头()Arc-Extinguishingcontact真空断路灭弧室真空度检查Vacuum insp.for vacuumbreaker电压时间相别(kV)(min)PhaseVoltageTimeABC六氟化硫断路器气体压力Gas press.Insp.for SF6breaker相别PhaseABC压力(Mpa)Pressure机械特性:Mech.Characteristic最低合闸电压最低分闸电压Min.closeMin.opennvoltagevoltage
34、V线圈试验:Coil test项目Item直流电阻DC Resis.绝缘电阻Ins.resis.合闸接触器ClosecontactMV合闸时间Close times分闸时间Open times绝缘试验:Insulation.Test合闸时间Close timem/s分闸时间Open timem/s合闸线圈Close coil分闸线圈Open coil相别PhaseAB绝缘电阻(M)Ins.resis.交流试验电压(kV)AC testvoltage时间(min)TimeMMC断路器在额定操作电压下分合闸次,动作良好。Breaker open/close time with rated oper
35、,voltage and operate well绝缘油五次击穿电压的平均值:Average voltage for 5 breaking down is kV备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H-435项目:Project装置:Unit工号:Section试验日期Test DatekV长度Length电缆终点End pointm电力电缆试验报告电力电缆试验报告Power cable test reportPower cable test report名称Name规格型号Spec./Model中间头数Number ofconnectio
36、n绝缘电阻Insulation resistance相别Phase绝缘电阻(M)AB额定电压Rated voltage电缆起点Start pointBCCAAEBECE直流耐压及泄漏电流DC withstanding voltage and leakage current试验电压(kV)Test voltage时间(min)TimeAB,C,E泄漏电流Leak,curr.(A)BC,A,ECA,B,E相位检查Phase inspection备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H-436项目:Project装置:Unit工号:Section
37、额定电压Ratedvoltage准确等级Precision制造厂ManufacturerV/V;V试验日期Testdate电压互感器试验报告电压互感器试验报告P T test reportP T test report名称Name型号Model容量Capacity出厂编号Manuf.No.A 相 No.Phase AVA位号Tag.No.接线线别Connection最大容量Max.Cap.B 相 No.Phase BVAC 相 No.Phase C绝缘电阻 R60 R15Insulation resistance相别Phase一次对二次,辅助及地(M)Pri.To sec.,Aux.and E
38、.二次对一次,辅助及地(M)Sec.To pri.,aux.and E.辅助对一次,二次及地(M)Aux.To pri.,sec.and E.交流耐压AC withstanding.Voltage.电压(kV)Voltage时间(min)Time介质损耗Loose tgtg(%)温度()Temp.ABC绕组直流电阻温度Wind DC R Temp.相别一次线圈()PhasePrimary coilA相别Phase绝缘油击穿电压Oil break down voltage五次平均值(kV)Average for 5 times接线组别或极性检查Connection inspectionBC变压比
39、检查Transform rate inspection相别PhaseABC备注:Remarks标称变比Rated rate额定电压下的空载电流测量No-load curr.With rated voltage.一次电压(V)Pri.voltage二次电压(V)Sec.voltage实测变比Real rate变比误差(%)Rate error相别PhaseABC空载电流(mA)No-load curr.结论:Conclusion技术负责人Check试验人Operator表 H-437项目:Project装置:Unit工号:Section试验日期Test date电压等级Voltage制造厂Man
40、ufacturerC 相 No.Phase C电流互感器试验报告电流互感器试验报告C T test reportC T test report名称Name型号Model电流比Curr.rate出厂编号与相别Manuf.No.andphase绝缘试验:Ins.test位号Tag.No.准确等级Precision二次负荷Sec.loadB 相 No.Phase BA 相 No.Phase A相别Phase绝缘电阻 R60 R15Insulation resistance一次对二次及地Pri.To sec.二次()级对地Sec.coil to E.二次()级对地Sec.coil to E.交流耐压A
41、C withstanding.Voltage.电压时间(kV)(min)VoltageTime介质损耗Loose tgtg(%)温度()Temp.ABC变流比检查Curr.Rate inspection二次电流(A)Sec.curr.级class级class实测变比Real rate级class级class变比误差(%)Rate error级class级class相别Phase一次电流(A)Pri.curr.极性检查Polarinspection级class级classABC备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H-438项目:Projec
42、t装置:Unit工号:Section试验日期Test date制造厂Manufacturer/避雷器试验报告避雷器试验报告Lightning arrester test reportLightning arrester test report名称Name型号Model出厂编号/相别Manuf.No./phase位号Tag.No.额定电压Rated voltage/绝缘电阻及电导电流(M):Ins.resis.And conduct.Curr.温度:Temp.绝缘电阻(M)Insulation resistance直流电压(kV)DC Voltage电导电流(A)Conduct.curr.非线性
43、系数No-Linear factor工频放电Powear frequency discharge试验次数Test times放电电压(kV)Discharge voltage平均值(kV)Average其它检查Other inspection基座绝缘(M)Base insulation放电记录器动作情况Discharge recorder备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H-439项目:Project装置:Unit工号:Section试验日期Test date接法ConnectionkVAR频率Frequency制造厂Manufactu
44、rer电容器试验报告电容器试验报告Capacitor test reportCapacitor test report名称Name电容器数量Cap.quantity型号Model额定电压Ratedvoltage位号Tag.No.每相数量One phase number容量Capacity电容量CapacitanceF绝缘试验:温度:Insulation test Temp.接线位置Connection position两极对外壳Poles to shell冲击合闸试验:Impulse test绝缘电阻(M)Ins.resistance交流耐压(kV)A C withstanding volta
45、ge时间(min)Time次数Times第一次1st第二次2rd第三次3rdA 相Phase A电流(A)CurrentB 相Phase BC 相Phase C各相电流差值(%)Curr.Deviationfor phases熔断器情况Fuse断路器电容器、耦合电容器测量:Breaker capacitor and coupled-capacitor measurement极间绝缘电阻(M)Ins.resis.Betweenpoles备注:Remarks电容量(F)Capacitance介质损耗角正切值(%)tg温度:Temp.局部放电量(pC)Partitial discharge结论:Co
46、nclusion技术负责人Check试验人Operator表 H-440项目:Project装置:Unit工号:Section绝缘油试验报告绝缘油试验报告Insulation oil test reportInsulation oil test report充油设备名称Fill.EquipmentName环境温度Temp.电气强度试验:Electr.Strength test油号OilNo.充油设备电压Fill.Equipmentvoltage试验日期Test datekV油别Oil Spec.本体油Originaloil油击穿电压(kV)Break down voltage第一次1st ti
47、me第二次2nd time第三次3rd time第四次4th time第五次5th time平均值Average结论Conclusion补充油Fill.oil技术负责人Check试验人Operator仅作电气强度试验时以下空白The following part is only used when ins.strength test is performen.可贴分析试验报告或摘录有关分析试验结论及报告编号Analysis and test report or abstract of pertinent analysis and test conclusion and report No.sh
48、all beprovided here.表 H-441项目:Project装置:Unit工号:Section时间(min)Duration备注Remark交流耐压试验报告交流耐压试验报告A C Withstand voltage testA C Withstand voltage testreportreport位号Tag.No.名称Name额定电压(kV)Rated voltage绝缘电阻(M)Ins.resistance试验电压(kV)Test voltage结论:Conclusion技术负责人Check试验人Operator表 H-442项目:Project装置:Unit工号:Secti
49、on试验日期Test date电流(压)继电器电流(压)继电器试验报告试验报告Current(voltage)relay testCurrent(voltage)relay testreportreport保护装置名称Protect device name原理图上符号Symbol on drawing型号Model出厂编号Manuf.No.额定值Rated调整范围Adjustable range接法Connection mode线圈对地Coil to E绝缘电阻Ins.R(M)接点对地Contact to E线圈对接点Coil tocontact动作值返回值整定点检验StartReturnSe
50、tting()()valueverification冲击试验Impulsetest返回系数ReturnFactor动作值Start()返回值Return()返回系数ReturnFactor动作值Start()返回值Return()返回系数ReturnFactor以 A(V)冲击后结果正常Withstandable impulse A(V)以 A(V)冲击后结果正常Withstandable impulse A(A)以 A(V)冲击后结果正常Withstandable impulse A(V)备注:Remarks结论:Conclusion技术负责人Check试验人Operator表 H443项目