1、-一、选择填空 20%1.Between the buildings B a secondary school.A.standB.standsC.to standD.standing2.Neither I nor he B fond of music.A.amB.isC.areD.were3.The laws that A how the buildings maybe made are building codes.A.tellB.ellsC.toldD.telling4.It is expensive C future cities on the sea.A buildB.builtC.t

2、o buildD.builds5.The A cements are widely used on the construction site.A.above-mentionedB.above-mentioningC.above-mentionD.above-mentions6.The production of steel has been increased B70%.A.inB.byC.atD.on7.Lets discuss only such questions C concern everyone of us.A.whichB.thatC.asD.those8.He has to

3、knowD strong the materials are.A.thatB.whatC.whichD.how9.The Great Wall of China is the biggest structure A man has ever built.A.thatB.whichC.whereD.when10.B you go,you can see many buildings.A.WhoeverB.WhereverC.WheneverD.Whatever.优选-11.We are looking forward to C from you soon.A.hearB.heardC.heari

4、ngD.hears12.Five yuan A too cheap for the dictionary.A.isB.areC.wereD.has been13.We should aim at bining beauty and fort C a weling friendliness.A.toB.inC.withD.for14.We can see an engineer A a device in the picture.A.adjustingB.adjustsC.adjustedD.adjust15.You are studying at college,B.A.so do weB.s

5、o are weC.we are soD.we do so16.C of the English films are familiar to me.Ive never seen thembefore.A.BothB.NothingC.NoneD.Any17.If the garden is big,some floodlights can be A A.installedB.producedC.requiredD.fixture18.Dose your shop Brebar A.developB.supplyC.settleD.make19.Its our duty to A the spe

6、cification.A.ply withB.pleteC.knowD.make20.The bigger quantity you order,(A).A.the lower price you will be offeredB.the low price you will be offered.优选-C.you will be offered lower priceD.you will be offer low二、词组互译 20%1小区规(zoning codes)2.钢筋混凝土(reinforced concrete)3.供热设备(the heating system)4.人工费(lab

7、or cost)5.工艺(workmanship)6.铸铁管(cast iron pipe)7.承包商(contractor)8.土木工程(the civilengineering)9.工程量清单(the bill of quantities)10.建筑师(architect)11.tripod(三脚架)12.lighting system(照明系统)13.site safety program(工地平安方案)14.quality assurance(质量保证)15.bank guarantees(银行担保)16.material cost(材料费)17.technical staff(技术人

8、员)18.the layout of the rooms(房屋布局)19.town planning rules(城市规划)20.office automation system(办公自动系统)三、选词填空 10%(minimum insurance as well vary servesupport apply foundation spread protectfrom)1.Foreign language can(serveas)a tool.2.We have to(support)the roof with pillars.3.Roofs(vary)in shape from plac

9、e to place.优选-4.They are trying to achieve the maximum of efficiency with the(minimum)of labor.5.He has found a suitable piece of land and an experienced builder(aswell).6.As he bought the fire(insurance),he didnt suffer severely from the greatfire.7.As indicated the(foundation)are bases of the buil

10、ding,which play animportant part in construction.8.We should(apply)theory to practice.9.The disease(is spreadby)flies.We should(protect)our plants(from)the cold.四翻译句子301.Materials used for doors and window frames aretimber,iron and aluminum alloys.(用于门、窗框的材料可以是木材、铁、铝合金。)2.Steel and concrete are the

11、most widely used structural materials today.(钢和混凝土是当前广泛使用的构造材料。)3.The Letter of Agreement is a promise of the Contractor to theEmployer.(协议书是承包商对业主的承诺。)4.Each unit price should include material cost,labour cost and machinecost.(每个单价应包括材料费、人工费、机械费。).优选-5.Now the popular interest in investment is infr

12、astructure and housingdevelopment projects.(现在的投资热点是根底设施工程和住宅开发工程。)6.Style of lamps should match other decoration.(灯的样式应与其他装饰相一致。)7.The light fixtures should be functional as well as decorative.(灯具应既体观功能又具有装饰性。)8.We cannot expect a stable superstructure without a solid foundation.(没有结实的根底,难以想象会有稳定的上

13、部构造。)9.Construction is the translation of a design to reality.(施工就是把设计变为现实。)10.We supply rebar with various diameters and strength.(我们销售不同的直径和强度的钢筋。)11.I saw some workers working in the site.(我看到工人们在工地干活。)12.To translate this idea into reality needs hard work.(把这一想法变为现实需要艰辛的劳动。)13.It is the individu

14、al touch that makes a house a home.(将房屋布置成个家,各人有各人的做法。)14.The manager found the project much behind the schedule.(经理发现工程进度落后于方案进度。)15.All kinds of electric equipment are installed in modern homes.(现代住宅中装有各种电器设备。)五阅读理解20一Shelter from the natural elements is a basic need.Early people met this need by.

15、优选-dwelling in caves and then their descendants began to construct buildings.Anancient building material,timber,is still being used in house building.Improved techniques now overe many of its weaknesses.The strength oftimber is different along and across the grain.Multiple layers are bonded byadhesi

16、ves to make the grain run in various directions.Durability is improved bybetter methods of preservation and improved timber does not burn easily.Devices for joining timber structures have also been improved and they spreadthe applied load over a wide area.More extensively it is used for joists,rafte

17、rs,window frames,doors and floors.Timber also has appeal for conservationistsbecause it is renewable.We can plant more trees and manufacture the timberinto a usable form.It involves no pollution of the environment.Clay is used in the form of bricks and tiles.The great advantage of brickconstruction

18、is its low cost.Clay is cheap and plentiful,and bricks are smallenough to be laid easily by hand.Stone is strong and durable.In many respects,it is an ideal building material.However,it is difficult to handle.Stones must becut from the solid rock in a quarry for use in a large building.All this labo

19、rmakes stone very expensive and difficult to work with.Stone is used todaymainly as a thin outside covering for large buildings and for the decorativewalls and floors of entrance lobbies.Many other kinds of materials besides thebasic structural materials are needed for a building.Concrete,steel,glas

20、s,alloys,plastics,adhesives and pitch are among them.判断对错.优选-1.There is little room for improvement in the building material.F2.Trees can not pollute the environment.T3.Bricks are made of clay.T4.Stone is as cheap as bricks.F5.There are many kinds of building materials.T二To cure concrete properly,th

21、e exposed surfaces must be kept continuallymoist form the moment the concrete first begins to set.The concrete mustthereafter be kept continually moist for a minimum of 14 days and longer if atall possible.The simplest method of keeping concrete moist is to spray the surface withwater at frequent in

22、tervals(频繁地).Sand or burlap麻袋片 can be spreadover the surface to help retain moisture.A covering is necessary,in any case,for the first 3 days after placing to protect the concrete from the direct rays 光线 of the sun.Special curing pounds 养护剂can also be sprayed on the concrete.Thespraying should take

23、place as soon as the surface of the concrete has lost itswatery appearance.Properly applied,a curing pound will allow the concrete tocontinue curing even after the concrete has been placed in service,as with aconcrete highway,for example.Spraying on a curing pound is often the onlypractical method o

24、f curing concrete that has been poured into an unusualshape.优选-A third method of curing concrete is to spread a sheet of polyethylene film orbuilding paper over the surface of the concrete.The polyethylene or buildingpaper should overlap the sides of the exposed concrete.This covering mustremain on

25、top of the concrete for the entire curing period.1.According to the passage,all the exposed surfaces of the concrete must bekept moist,(B).A.after the concrete has setB.as soon as the concrete begins to setC.whenever the concrete is placedD.before the concrete is placed2.The concrete must thereafter

26、 be kept continually moist for(A).A.at least 14 daysB.only 14 daysC.about 14 daysD.less than 14 days3.To keep concrete moist,(C).A.we can only spread some sand or burlap over the surface.B.we spray(喷)some water over the surface.C.we should spray water on the surface frequently.D.we should spray wate

27、r mixed with sand over the surface.4.After the concrete is placed,(B)A.it should be covered for a long time.优选-B.it must be covered to avoid the strong sun light.C.it should be covered for 3 days.D.it may be covered for the first 3 days if possible.5.Special curing pounds(B)A.can only be used from the moment to concrete first begins to set.B.can be used even after the concrete has been placed in service.C.can always be used on the concrete highway.D.can be sprayed on anything.优选