《7.电力及控制电缆安装.docx》由会员分享,可在线阅读,更多相关《7.电力及控制电缆安装.docx(2页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、Salco-NFC-Electrical-ITP-E-7namvaranEacinccn; Mm庐 nnamvaranEacinccn; Mm庐 nSouth Aluminium Co. ( SALCO电力及控制电缆安装检查记录Inspection Record of Power and Control Cable Installation工程名称Project Name施工单位Contractor检查部位Location验收依据Acceptance Basis符合设计图纸要求Meet requirement of design drawing相关图号Refer Drawing No.序号No
2、内容Content要求Requirement检查结果Check Result(Acc/Rej)1型号、规格、外观Type & Specification & Appearance符合设计、厂家文 件Meet the design/vendor document2金属电缆支架接地Sheild /armor of cable is connected to earth system符合设计要求Meet the design3电缆敷设(电缆沟或管道组;布置无绞拧、无损伤;通断试验 和绝缘测试;直埋电缆位置、埋深、回填及标识;电缆布置整 齐有序;电缆标识牌正确齐全)Cable laying(Cable
3、 trench or duct bank; no damage; continuity check and Insulation resistance test; Directly -embedded cable location/ depth /back filling/marking/aligniTient/cable tag /arragement符合设计要求Meet the design4电力电缆耐压试验(包含中压电缆)Withstand Voltage test for Power cable (MV cable include)符合设计要求Meet the design5电缆头和设
4、备端子连接(可靠固定,无额外应力)Cable sealing/splicing and terminal connection (reliable fixation, no extra stress)符合设计要求 Meet the design6架空电缆安装(连接,下垂,附件)Over head wire installation(connection, sag, accessories)符合设计要求Meet the design7尾项清单Punch listYES/NORemarks检查日期 Inspection date:Responsible person of construction contractorSignature:DateAccepted by QC of NFCSignature:Date