《5.电池、充电器和不间断供电系统.docx》由会员分享,可在线阅读,更多相关《5.电池、充电器和不间断供电系统.docx(2页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、Salco-NFC-Electrical-ITP-E-5-1namvaranEacinccn; Mm庐 nnamvaranEacinccn; Mm庐 nSouth Aluminium Co. ( SALCO电池、充电器和不间断供电系统安装检查记录Inspection Record of Battery, Charger and Uninterrupted Power System Installation工程名称Project Name施工单位Contractor检查部位Location设备位号Equipment No验收依据Acceptance Basis符合设计图纸要求Meet requi
2、rement of design drawing相关图号Refer Drawing No.序号No内容Content要求Requirement检查结果Check Result(Acc/Rej)1型号、规格、外观Type & Specification & Appearance符合设计、厂家文 件Meet the design/vendor document2UPS/EPS的开关、储能电池(整流、逆变、静态开关;内部接 线;紧固连接)UPS/EPS switch, energy storage battery (rectifier, inverter, static switch; intern
3、al connection; fastening connection)符合设计要求 Meet the design3UPS机架及金属底座(紧固、组装水平度垂直度W 1.5%。) UPS frame and metal base (fastening, assembly levleness & verticality 1.5 %o)符合设计要求Meet the design4UPS及EPS外漏可导电局部(与保护导体连接,连接标识)UPS and EPS leaky conductive parts (connection to protective conductor, connection
4、mark)符合设计要求 Meet the design5根据厂家要求检查安装连接Check of connection according vendor document符合厂家文件Meet the vendor document6电池充电(如果有)Filling of battery should be done (if any)YES/NO7尾项检查Punch listYES/NORemarks检查日期 Inspection date:Responsible person of construction contractorSignature:DateAccepted by QC of NFCSignature:Date