《毕业论文外文翻译-变电站的综合概述.doc》由会员分享,可在线阅读,更多相关《毕业论文外文翻译-变电站的综合概述.doc(10页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、附录英文翻译A comprehensive overview of substationsAlong with the economic development and the modern industry developments of quick rising, the design of the power supply system become more and more completely and system. Because the quickly increase electricity of factories, it also increases seriously
2、to the dependable index of the economic condition, power supply in quantity. Therefore they need the higher and more perfect request to the power supply. Whether Design reasonable, not only affect directly the base investment and circulate the expenses with have the metal depletion in colour metal,
3、but also will reflect the dependable in power supply and the safe in many facts. In a word, it is close with the economic performance and the safety of the people. The substation is an importance part of the electric power system, it is consisted of the electric appliances equipments and the Transmi
4、ssion and the Distribution. It obtains the electric power from the electric power system, through its function of transformation and assign, transport and safety. Then transport the power to every place with safe, dependable, and economical. As an important part of powers transport and control, the
5、transformer substation must change the mode of the traditional design and control, then can adapt to the modern electric power system, the development of modern industry and the of trend of the society life.Electric power industry is one of the foundations of national industry and national economic
6、development to industry, it is a coal, oil, natural gas, hydropower, nuclear power, wind power and other energy conversion into electrical energy of the secondary energy industry, it for the other departments of the national economy fast and stable development of the provision of adequate power, and
7、 its level of development is a reflection of the countrys economic development an important indicator of the level. As the power in the industry and the importance of the national economy, electricity transmission and distribution of electric energy used in these areas is an indispensable component.
8、。Therefore, power transmission and distribution is critical. Substation is to enable superior power plant power plants or power after adjustments to the lower load of books is an important part of power transmission. Operation of its functions, the capacity of a direct impact on the size of the lowe
9、r load power, thereby affecting the industrial production and power consumption.Substation system if a link failure, the system will protect the part of action. May result in power outages and so on, to the production and living a great disadvantage. Therefore, the substation in the electric power s
10、ystem for the protection of electricity reliability, sensitivity and other indicators.Power plants and substations are connected user link in the middle, transformation and distribution of electric energy to play the role. According to the different tasks substation can be divided into step-up trans
11、former step-down transformer substation and two broad categories. Step-up substation built on the general power plant, the general step-down transformer near the load center built on the low.Voltage can also be divided according to medium voltage substation (60 kV and below), high-voltage substation
12、s (110 220 kV), EHV Substation (330 765 kV) and Ultra High Voltage Substation (1000 kV and above). In electric power system according to their status as a hub substation can be divided into the middle substation substations and terminals. This requires a substation part of economic rationality, the
13、second part of safe and reliable, the only way to the normal operation of substation work services for the national economy. There are step-up transformer step-down transformer substation and two broad categories.Substations have been equipped with various protection devices, these devices are based
14、 on lower short-circuit load to a maximum load conditions, such as configuration settings and, therefore, in the event of the failure was similar to the specific circumstances under to judge by the system should automatically trip protection, and now the protection of the whole trip has been a very
15、short time, the lifting of the fault, the system will automatically reclosing devices and the gateway to restore power quickly. This is to protect the lower the load is very favorable. This will not only protect the safety of the load equipment is in favor of extending the service life and reduce eq
16、uipment investment, and improved reliability of electricity supply, which is to improve the efficiency of industrial and agricultural production is very effective.Substations have been equipped with various protection devices, these devices are based on lower short-circuit load to a maximum load con
17、ditions, such as configuration settings and, therefore, in the event of the failure was similar to the specific circumstances under to judge by the system should automatically trip protection, and now the protection of the whole trip has been a very short time, the lifting of the fault, the system w
18、ill automatically reclosing devices and the gateway to restore power quickly. This is to protect the lower the load is very favorable. This will not only protect the safety of the load equipment is in favor of extending the service life and reduce equipment investment, and improved reliability of el
19、ectricity supply, which is to improve the efficiency of industrial and agricultural production is very effective.Increase in the efficiency of industrial products means lower product costs, increase market competitiveness, which will enable enterprises to increase for the national economy and make a
20、 greater contribution to development. Electricity supply reliability and other fields, can improve peoples quality of life, improve their living conditions. Analyse change to give or get an electric shock a mission for carrying and customers carries etc. circumstance, choose the address, make good u
21、se of customer data proceed then carry calculation, ascertain the correct equipment of the customer. At the same time following the choice of every kind of transformer, then make sure the line method of the transformer substation, then calculate the short-circuit electric current, choosing to send t
22、ogether with the electric wire method and the style of the wire, then proceeding the calculation of short-circuit electric current. This first step of design included:(1) ascertain the total project (2) load analysis(3) the calculation of the short-circuit electric current (4) the design of an elect
23、ric shock the system design to connect with system and the choice of line project (5) the choice and the settle of the protective facility (6) the contents to defend the thunder and protection of connect the earth. Along with the high and quick development of electric power technique, electric power
24、 system then can change from the generate of the electricity to the supply the power. Design the task this time is aim at intensity of mastering of every subject knowledge of this speciality reflecting, and of test this specialitys study result. first, analyze the tend of load department according t
25、o all parameter of load about system and circuit on task book. It expounds the necessity to this situation from the rspect of increasing load. Then through to the generalization of planning to build the transformer substation and the analysis of the load materials, safe, economy and dependability ar
26、e considered, has confirmed the mainly wiring form of 10kV. Calculated and supplied power in the range and confirmed TV stations number of the main voltage transformer through load finally, capacity and type, capacity and type of using the voltage transformer stand surely at the same time, finally,
27、the result of calculation of calculating that and short out according to the electric current of largest lasting job, make the circuit to protect, the voltage transformer is protected, the bus bar is protected, prevent the thunder from protecting.This graduation project take the 10kV transformer sub
28、station as the main design object, this 10kV transformer substation is the local important transformer substation, is the electrical power system 10kV voltage rank important part. This transformer substation is equipped with 2 main transformers, in the station the host wiring divides into 10kV,and 0
29、.4 kV two voltages ranks.This design first chapter is an introduction, mainly elaborated the transformer substation in electrical power system status. Designs the transformer substation the principle and the goal as well as the transformer substation basic situation. Second chapter is shoulders the
30、computation and the transformer choice, carries on the load computation according to the known transformer substation load material to the transformer substation. Through the load which obtains had determined the host changes the capacity and a number, the host change the pattern, the winding wiring
31、 way, the accent press the way and the host changes the impedance. Third chapter is the transformer substation electricity host wiring design, separately through to 10kV side electricity host wiring drawing up, chooses the stablest reliable wiring way. Fourth chapter is the short class computation,
32、first determined short-circuits the spot, calculates various parts reactance, then to respectively short-circuits separately to carry on the computation, obtains respectively short-circuits the short-circuit current. Fifth chapter is the electrical equipment choice, the electrical equipment includin
33、g the generatrix, the circuit breaker, the isolator, the electric current and the voltage transformer, the fuse. Sixth chapter is the power distribution equipment, mainly carries on the design to the transformer substation power distribution equipment. Seventh chapter is anti-radar with the earth, t
34、his chapter has carried on the choice to the arrester, as well as has determined the earth way. Through to the 10kV transformer substation design, causes me has to the electrical engineering and its the automated specialized branch curriculum to be comprehensive, system grasping, strengthened apply
35、theory to reality the ability, raised the project consciousness, exercised me independently to analyze and the solution electric power project design question ability. key words substation ,load ,transmission system , distribution high voltage network ,correction equipment.变电站的综合概述随着经济的发展和现代工业建设的迅速崛
36、起,供电系统的设计越来越全面、系统,工厂用电量迅速增长,对电能质量、技术经济状况、供电的可靠性指标也日益提高,因此对供电设计也有了更高、更完善的要求。设计是否合理,不仅直接影响基建投资、运行费用和有色金属的消耗量,也会反映在供电的可靠性和安全生产方面,它和企业的经济效益、设备人身安全密切相关。电力工业是国民经济的一项基础工业和国民经济发展的先行工业,它是一种将煤、石油、天然气、水能、核能、风能等一次能源转换成电能这个二次能源的工业,它为国民经济的其他各部门快速、稳定发展提供足够的动力,其发展水平是反映国家经济发展水平的重要标志。由于电能在工业及国民经济的重要性,电能的输送和分配是电能应用于这些
37、领域不可缺少的组成部分。所以输送和分配电能是十分重要的一环。变电所是使电厂或上级电站经过调整后的电能书送给下级负荷,是电能输送的重要部分。其功能运行情况、容量大小直接影响下级负荷的供电,进而影响工业生产及生活用电。若变电所系统中某一环节发生故障,系统保护环节将动作。可能造成停电等事故,给生产生活带来很大不利。因此,变电所在整个电力系统中对于保护供电的可靠性、灵敏性等指标十分重要。变电所是联系发电厂和用户的中间环节,起着变换和分配电能的作用。根据变电所任务的不同,可将变电所分为升压变电所和降压变电所两大类。升压变电所一般建在发电厂,降压变电所一般建立在靠近负荷中心的低点。根据电压等级还可分为中压
38、变电所(60千伏及以下)、高压变电所(110220千伏)、超高压变电所(330765千伏)和 特高压变电所(1000千伏及以上)。按其在电力系统中的地位可分为枢纽变电所、中间变电所和终端变电所。这就要求变电所的一次部分经济合理,二次部分安全可靠,只有这样变电所才能正常的运行工作,为国民经济服务。变电所有升压变电所和降压变电所两大类。升压变电所通常是发电厂升压站部分,紧靠发电厂。降压变电所通常远离发电厂而靠近负荷中心。下面的所设计得就是10KV降压变电所。变电所的主要设备有电力变压器,母线和开关设备等。变电所内都装设有各种保护装置,这些保护装置是根据下级负荷地短路、最大负荷等情况来整定配置的,因
39、此,在发生类似故障是可根据具体情况由系统自动做出判断应跳闸保护,并且,现在的跳闸保护整定时间已经很短,在故障解除后,系统内的自动重合闸装置会迅速和闸恢复供电。这对于保护下级各负荷是十分有利的。这样不仅保护了各负荷设备的安全利于延长是使用寿命,降低设备投资,而且提高了供电的可靠性,这对于提高工农业生产效率是十分有效的。工业产品的效率提高也就意味着产品成本的降低,市场竞争力增大,进而可以使企业效益提高,为国民经济的发展做出更大的贡献。生活用电等领域的供电可靠性,可以提高人民生活质量,改善生活条件等。变电所是电力系统的一个重要组成部分,由电器设备及配电网络按一定的接线方式所构成,他从电力系统取得电能
40、,通过其变换、分配、输送与保护等功能,然后将电能安全、可靠、经济的输送到每一个用电设备的转设场所。作为电能传输与控制的枢纽,变电站必须改变传统的设计和控制模式,才能适应现代电力系统、现代化工业生产和社会生活的发展趋势。随着计算机技术、现代通讯和网络技术的发展,为目前变电站的监视、控制、保护和计量装置及系统分隔的状态提供了优化组合和系统集成的技术基础。该地区变电所所涉及方面多,考虑问题多,分析变电所担负的任务及用户负荷等情况,选择所址,利用用户数据进行负荷计算,确定用户无功功率补偿装置。同时进行各种变压器的选择,从而确定变电站的接线方式,再进行短路电流计算,选择送配电网络及导线,进行短路电流计算
41、。选择变电站高低压电气设备,为变电站平面及剖面图提供依据。本变电所的初步设计包括了:(1)总体方案的确定(2)负荷分析(3)短路电流的计算(4)高低压配电系统设计与系统接线方案选择(5)继电保护的选择与整定(6)防雷与接地保护等内容。随着电力技术高新化、复杂化的迅速发展,电力系统在从发电到供电的所有领域中,通过新技术的使用,都在不断的发生变化。变电所作为电力系统中一个关键的环节也同样在新技术领域得到了充分的发展。本次设计任务旨在体现对本专业各科知识的掌握程度,同时检验本专业的学习结果。首先根据任务书上所给系统与线路及所有负荷的参数,分析负荷发展趋势。从负荷增长方面阐明了建站的必要性,然后通过对
42、拟建变电站的概括以及出线方向来考虑,并通过对负荷资料的分析,安全,经济及可靠性方面考虑,确定了10kV以及站用电的主接线,然后又通过负荷计算及供电范围确定了主变压器台数,容量及型号,同时也确定了站用变压器的容量及型号,最后,根据最大持续工作电流及短路计算的计算结果,做出线路保护,变压器保护,母线保护,防雷保护。本次毕业设计以10kV 变电站为主要设计对象,该10kV变电站是地区重要变电站,是电力系统10kV电压等级的重要部分。该变电站设有2 台主变压器,站内主接线分为10kV、0.4 kV 三个电压等级。本设计的第一章为绪论,主要阐述了变电站在电力系统中的地位。设计变电站的原则和目的以及变电站
43、的基本情况。第二章是负荷计算及变压器的选择,根据已知变电站的负荷资料对变电站进行负荷计算。通过得出的负荷确定了主变的容量和台数、主变的型式及主变阻抗。. 三章是变电站电气主接线的设计,分别通过对110kV、35kV、10kV侧电气主接线的拟定,选择出最稳定可靠的接线方式。第四章是短流计算,首先确定短路点, 计算各元件的电抗,然后对各短路点分别进行计算,得出各短路点的短路电流。第五章是电气设备的选择,电气设备包括母线、断路器、隔离开关、电流和电压互感器、熔断器。第六章是配电装置,主要对变电站的配电装置进行设计。通过对60kV变电站设计,使我对电气工程及其自动化专业的主干课程有一个较为全面,系统的
44、掌握,增强了理论联系实际的能力,提高了工程意识,锻炼了我独立分析和解决电力工程设计问题的能力。关键词 变电站、负荷、输电系统、配电系统、高压网络、补偿装置五分钟搞定5000字毕业论文外文翻译,你想要的工具都在这里!在科研过程中阅读翻译外文文献是一个非常重要的环节,许多领域高水平的文献都是外文文献,借鉴一些外文文献翻译的经验是非常必要的。由于特殊原因我翻译外文文献的机会比较多,慢慢地就发现了外文文献翻译过程中的三大利器:Google“翻译”频道、金山词霸(完整版本)和CNKI“翻译助手。具体操作过程如下: 1.先打开金山词霸自动取词功能,然后阅读文献; 2.遇到无法理解的长句时,可以交给Goog
45、le处理,处理后的结果猛一看,不堪入目,可是经过大脑的再处理后句子的意思基本就明了了; 3.如果通过Google仍然无法理解,感觉就是不同,那肯定是对其中某个“常用单词”理解有误,因为某些单词看似很简单,但是在文献中有特殊的意思,这时就可以通过CNKI的“翻译助手”来查询相关单词的意思,由于CNKI的单词意思都是来源与大量的文献,所以它的吻合率很高。 另外,在翻译过程中最好以“段落”或者“长句”作为翻译的基本单位,这样才不会造成“只见树木,不见森林”的误导。四大工具: 1、Google翻译: google,众所周知,谷歌里面的英文文献和资料还算是比较详实的。我利用它是这样的。一方面可以用它查询
46、英文论文,当然这方面的帖子很多,大家可以搜索,在此不赘述。回到我自己说的翻译上来。下面给大家举个例子来说明如何用吧比如说“电磁感应透明效应”这个词汇你不知道他怎么翻译,首先你可以在CNKI里查中文的,根据它们的关键词中英文对照来做,一般比较准确。 在此主要是说在google里怎么知道这个翻译意思。大家应该都有词典吧,按中国人的办法,把一个一个词分着查出来,敲到google里,你的这种翻译一般不太准,当然你需要验证是否准确了,这下看着吧,把你的那支离破碎的翻译在google里搜索,你能看到许多相关的文献或资料,大家都不是笨蛋,看看,也就能找到最精确的翻译了,纯西式的!我就是这么用的。 2、CNK
47、I翻译: CNKI翻译助手,这个网站不需要介绍太多,可能有些人也知道的。主要说说它的有点,你进去看看就能发现:搜索的肯定是专业词汇,而且它翻译结果下面有文章与之对应(因为它是CNKI检索提供的,它的翻译是从文献里抽出来的),很实用的一个网站。估计别的写文章的人不是傻子吧,它们的东西我们可以直接拿来用,当然省事了。网址告诉大家,有兴趣的进去看看,你们就会发现其乐无穷!还是很值得用的。 3、网路版金山词霸(不到1M): 4、有道在线翻译:翻译时的速度:这里我谈的是电子版和打印版的翻译速度,按个人翻译速度看,打印版的快些,因为看电子版本一是费眼睛,二是如果我们用电脑,可能还经常时不时玩点游戏,或者整
48、点别的,导致最终SPPEED变慢,再之电脑上一些词典(金山词霸等)在专业翻译方面也不是特别好,所以翻译效果不佳。在此本人建议大家购买清华大学编写的好像是国防工业出版社的那本英汉科学技术词典,基本上挺好用。再加上网站如:google CNKI翻译助手,这样我们的翻译速度会提高不少。具体翻译时的一些技巧(主要是写论文和看论文方面) 大家大概都应预先清楚明白自己专业方向的国内牛人,在这里我强烈建议大家仔细看完这些头上长角的人物的中英文文章,这对你在专业方向的英文和中文互译水平提高有很大帮助。 我们大家最蹩脚的实质上是写英文论文,而非看英文论文,但话说回来我们最终提高还是要从下大工夫看英文论文开始。提到会看,我想它是有窍门的,个人总结如下: 1、把不同方面的论文分夹存放,在看论文时,对论文必须做到看完后完全明白(你重视的论文);懂得其某部分讲了什么(你需要参考的部分论文),在看明白这些论文的情况下,我们大家还得紧接着做的工作就是把论文中你觉得非常巧妙的表达写下来,或者是你论文或许能用到的表达摘记成本。这个本将是你以后的财富。你写论文时再也不会为了一些表达不符合西方表达模式而烦恼。你的论文也降低了被SCI或大牛刊物退稿的几率。不信,你可以试一试 2、把摘记的内容自己编写成检索,这个过程是我们对文章再回顾,而且是对你摘抄的经典妙笔进行梳理的重要阶段。你有了这个过程。写