2023年英文合同范文汇总六篇.docx

上传人:1319****208 文档编号:95308747 上传时间:2023-08-20 格式:DOCX 页数:98 大小:59.36KB
返回 下载 相关 举报
2023年英文合同范文汇总六篇.docx_第1页
第1页 / 共98页
2023年英文合同范文汇总六篇.docx_第2页
第2页 / 共98页
点击查看更多>>
资源描述

《2023年英文合同范文汇总六篇.docx》由会员分享,可在线阅读,更多相关《2023年英文合同范文汇总六篇.docx(98页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、2023年英文合同范文汇总六篇英文合同 篇1Commercial Contract商业合同No:合同号:Date:日 期:The Buyer: Zhonghua International Technology Corporation卖方:菲尔德埃米森公司The Seller: Field Emission Corp.买方:中华国际技术开发公司This contract is made by and between the Buyer and the Seller, whereby the Buyer agrees to buy and the Seller agrees to sell th

2、e under-mentioned commodity according to the terms and conditions stated below:依据本合同条款,买方同意购买,卖方同意出售下述货品,兹签订本合同。1. Commodity: camera-control equipment1、品名:摄像机限制设备Quantity: 60 (sets)数量:60(台)Unit price: USD4 800.00单价:4 800美元/台Total amount: USD288 000.00总额:288 000美元2. Country of origin and manufacturer

3、: Field Emission Corp. in US2、原产国别及生产商:美国菲尔德埃米森公司3. Packing3、包装To be packed in strong wooden cases or cartons, suitable for long distance ocean, parcel post or air freight transportation as well as changing climate and with good resistance to moisture and shocks.用坚实的木箱或纸箱包装,相宜长途海运、邮寄或空运及适应气候改变,并且具备良

4、好的防潮抗震实力。The Seller shall be liable for any damage of the commodity due to improper packing and for any rust attributable to inadequate protective measures in regard to the packing.由于包装不当而引起的货物损坏或由于防护措施不善而引起货物锈蚀,卖方应赔偿由此而造成的全部损失费用。One full set of service and operation manual shall be enclosed in each

5、 case.包装箱内应附有完整的修理保养、操作运用说明书。4. Shipping mark:4、运输标记The Seller shall mark on each package with fadeless paint the package number, gross weight, net weight, measurement and warnings such as “HANDLE WITH CARE”, “KEEP AWAY FROM HEAT”, “KEEP AWAY FROM MOISTURE” as well as shipping mark.卖方应在每个货箱上用不褪色油漆标明

6、箱号、毛重、净重、长、宽、高,并标有“当心轻放”,“防潮”及“防热”等字样和运输标记。5. Date of shipment: Aug. 8, 20xx5、装运日期:20xx年8月8日6. Port of shipment: Los Angeles6、装运港:洛杉矶7. Port of destination: Ningbo7、目的港:宁波8. Insurance:8、保险To be borne by the Buyer after shipment.装运后由买方投保。9. Payment, under conditions (1), (2) and (3) below:9、支付条件 分以下三

7、种条件支付:(1) Through the letter of credit:(1)信用证The Buyer, on receipt from the Seller of the delivery advice, shall open an irrevocable letter of credit with the Bank of China, in favor of the Seller for the total value of shipment 25 30 days prior to the date of delivery. The credit shall be available

8、 against Sellers draft drawn at sight on the opening bank for 100% invoice value accompanied by the shipping documents specified in Clause 10 hereof. Payment shall be effected by the opening bank by telegraphic transfer against presentation of the aforesaid draft and documents. The letter of credit

9、shall be valid until the 20th day after the shipment is effected.买方收到卖方交货通知,应在交货日期前25 30 天,由中国银行开出以卖方为受益人的与装运金额相同的不行撤销的信用证。卖方须向开证行出具100发票金额即期汇票并附本合同第10款所规定的装运单据。开证行收到上述汇票和装运单据即予以电汇支付。信用证于装运日期后20天内有效。(2) Collection:(2)托收The Seller may present the sight draft together with the shipping documents (spec

10、ified in Clause 10 hereof) through the Sellers bank and Buyers Bank to the Buyer for collection after shipment.货物装运后, 卖方出具即期汇票,连同本合同第10款规定的装运单据,通过卖方所在地银行和买方银行提交给买方托收。(3) By direct remittance:(3)干脆付款Payment shall be effected by the Buyer, by telegraphic transfer, within 7 (seven) days after receipt f

11、rom the Seller of the shipping documents specified in the Clause 10 hereof.买方收到本合同第10款规定的装运单据后7天内, 以电汇向卖方支付货款。10. Documents:10、单据(1) In case of sea-freight:(1)海运Full set of clean bills of lading marked “Freight to Collect”, “Freight Prepaid” made out to bank endorsed notifying Zhonghua International

12、 Technology Development Corporation at the port of destination.全套清洁海运提单,标明“运费付讫”,“运费预付”,做成空白背书并注明通知目的港的中华国际技术开发公司。(2) In case of air-freight:(2) 空运One copy of airway bill marked “Freight to Collect”, Freight Prepaid“ and sent to the Buyer.空运提单副本一份,标明“运费付讫”,“运费预付”,寄交买方。(3) Invoice in 4 copies indicat

13、ing contract number and shipping mark, made out in details as per the contract concerned.(3)发票一式4份,标明合同号和装运标记,发票依据有关合同具体填写。(4) Packing list in 2 copies issued by the manufacturer.(4)由生产商出具的装箱单一式两份。(5) Certificate of quality and quantity issued by the manufacturer.(5)由生产商出具的质量和数量保证书。(6) The Buyer sha

14、ll be advised by mail/cable immediately after shipment.(6)货物装运后马上用电报或信件通知买方。In addition, the Seller shall, within 10 (ten) days after shipment, send by airmail two sets of aforesaid documents (except item 4) with one set directly to the Buyer and one set directly to Zhonghua International Technology

15、 Development Corporation at the port of destination.此外,发货10天内,卖方将上述单据(第5条除外)航寄两份,一份干脆给买方,一份干脆给目的港的中华国际开发公司。11. Shipment11、装运(1) In case of FOB terms(1) 离岸价格条款(FOB条款)a. The Seller shall, 30days before the contracted date of shipment, advise the Buyer by cable or letter of the contract number, name of

16、 commodity, quality, value, package number, gross weight, measurement and date of readiness at the port of shipment for the Buyer to book shipping space.1)卖方于合同规定的装运日期前30天,用电汇或信件将合同号、品名、数量、价值、箱号、毛重、装箱尺寸和货物抵装运港日期通知买方,以便买方租船订舱。b. Booking of shipping space shall be arranged by the Buyers shipping agent

17、, China Ocean Shipping Agency.2)买方船运代理中国外轮代理公司,负责办理租船订舱事宜。c. The Buyers shipping agent (China Ocean Shipping Agency) shall send to the Seller notice indicating the name of vessel, estimated date of loading and contract number for the Seller to arrange shipment 10 (ten) days before the estimated date

18、 of arrival of the vessel at the loading port. The Seller is requested to get in close contract with the shipping agent. When it becomes necessary to change the carrying vessel or to advance or delay the arrival date, the Buyer or the shipping agent shall advise the Seller in time. Should the vessel

19、 fail to arrive at the loading port within 30 (thirty) days after the arrival date advised by the Buyer, the Buyer shall bear the storage and insurance expenses incurred from the 30 day thereafter.3)买方船运代理(中国外轮代理公司)预料船抵达装运港10天之前,将船名、预料装货日期、合同号等通知卖方,以便卖方支配装运。要求卖方与船运代理保持亲密联系。当须要更换承运船只及船只提前、推迟抵达时,买方或其船

20、运代理应刚好通知卖方。如船在买方通知日后30天内未能到达,则第30天后仓储费和保险费用由买方担当。d. The Seller shall be liable for any dead freight or demurrage, should it happen that they have failed to have the commodity ready for loading after the carrying vessel has arrived at the port of shipment on time.4)如承运船如期抵达装运港,卖方因备货未妥而影响装船,则空舱费和滞期费均由

21、卖方担当。e. The Seller shall bear all expenses and risks before the commodity passes over the vessels rail and is released from the tackle. After it has passed over the vessels rail and is released from the tackle, all expenses and risks shall be in Buyers account. 5)货物超过船舷并从吊钩卸下前,一切费用和风险由卖方担当;货物超过船舷并从吊

22、钩卸下,一切费用和风险由买方担当。(2) In case of CFR terms(2)成本加运费价条款(CFR条款)a. The Seller shall ship the goods within the shipment time from the loading port to the port of destination. Transshipment is not allowed.1) 在装运期内,卖方负责将货物从装运港装运至目的港。不得转船。b. In case the goods are to be dispatched by air freight, the Seller s

23、hall, 30 (thirty) days before the time of delivery as stipulated in Clause 5, inform the Buyer by cable or letter of the estimated date of delivery, contract number, name of commodity, and invoiced value. The Seller shall, immediately after dispatch of the goods, advise the Buyer by cable or letter

24、of the contract number, name of commodity, invoiced value and date of dispatch for the Buyer to arrange the insurance in time.2) 货物空运时,卖方于本合同第5条规定的交货日期前30天,以电报或信件把预料交货期合同号、品名、发票金额等通知买方。发货后,卖方马上以电报或信件将合同号、品名、发票金额、发货日期通知买方,以便买方刚好投保。12. Shipping advice12、装运通知The Seller shall, immediately on the complet

25、ion of the loading of the goods, advise the Buyer by cable or letter of the contract number, name of commodity, quantity, invoiced value, gross weight, name of vessel and date of sailing. In case the Buyer fails to arrange insurance in time due to the Sellers not having cabled in time, all losses sh

26、all be borne by the Seller.货物一俟全部装船,卖方应即将合同号、吕名、数量、发票金额、毛重、船名及启航日期用电报或信件通知买方。如因卖方未能刚好通知致使买方不能刚好投保,卖方则担当全部损失。13. Guarantee of quality13、质量保证The Seller guarantees that the commodity hereof is made of the best materials with first class workmanship, brand new, unused, and complies with the quality and

27、specifications stipulated in this contract. The guarantee period shall be 12 (twelve) months staring from the date on which the commodity arrives at the port of destination.卖方保证:所供货物由最好的材料及精湛工艺制成,商标为新的和未经运用的,其质量和规格符合本合同所做的说明。自货物到达目的港起12个月为质量保证期。14. Claims14、索赔Except those claims for which the insura

28、nce company or the owners of the vessel are liable, should the quality, specifications or quantity be found not in conformity with the stipulations of the contract, within 90 (ninety) days after the arrival of the goods at destination, the Buyer can use the Inspection Certificate issued by China Nat

29、ional Import and Export Commodities Inspection Corporation to claim for replacement as compensation. All the expenses incurred (such as inspection charges, freight charges for returning and sending of replacement, insurance premium, storage, loading and unloading charges) shall be borne by the Selle

30、r.自货物到达目的港起90天内,如发觉货物质量、规格、数量与合同规定不符,除那些应由保险公司或由船方担当的部格外,买方可凭中国进出口商品检验总公司出具的商检证书,有权要求更换或索赔。In regard to quality, the Seller shall guarantee that if, within 12 (twelve) from the date of arrival of the goods at destination, damages occur in the course of operation by reason of inferior quality of mate

31、rial or bad workmanship, the Buyer shall immediately notify the Seller in writing and put forward a certificate issued by the CCIC. The certificate so issued shall be accepted as the base of the claim. The Seller, in accordance with the Buyers claim, shall be responsible for the immediate eliminatio

32、n of the defects, complete or partial replacement of the commodity, or devaluate the commodity according to the state of defects. Where necessary, the Buyer may eliminate the defects themselves at the Sellers expenses. If the Seller fails to reply within on month after receipt of the aforesaid claim

33、, the claim shall be reckoned as having been accepted by the Seller.卖方保证,货物到达目的港12个 月内,假如运用过程中由于材料质量低劣和工艺不佳而出现的损坏,买方马上以书面形式通知卖方并出具中国进出口商品检验总公司开列的检验证书,提出索赔。商 检证书为索赔的依据。按买方索赔要求,卖方有责任马上解除货物的缺陷、全部或部分更换或依据缺陷状况将货物作降价处理。15. Force Majeure15、不行抗力The Seller shall not be held responsible for delay in shipment

34、or non-delivery of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading. The Seller shall advise the Buyer of the occurrence mentioned above within 15 (fifteen) days and send by airmail a certificate of the incident issued by the local gov

35、ernment to the Buyer. Even in such cases, the Seller is still liable to take all possible measures to expedite the delivery of goods.在货物制造和装运过程中,由于发生不行抗力事故致使延期交货或不能交货,卖方概不负责。卖方在不行抗力事务发生后,应马上通知买方并在事发14天内,将事故发生所在地当局签发的证书航空邮寄给买方以作证据。即使在此状况下,卖方仍有责任实行必要的措施,尽快交货。Should the Seller fails to perform the cont

36、racted obligations 10 (ten) weeks after the aforesaid incident, the Buyer shall have the right to treat the contract as null and void.不行抗力事故发生后超过10个星期而合同尚未履行完毕,买方有权撤销合同。16. Late delivery and penalty16、合同延期和罚款Should the Seller fail to make delivery within the contracted period for reasons other than

37、Force Majeure specified in Clause 15 hereof, the Buyer may accept the postponement on condition that the Seller agrees to pay a penalty which shall be deducted by the paying bank from the agreed amount of payment. The penalty, however, shall not exceed 5% (five percent) of the total value of the goo

38、ds involved in the late delivery. The rate of penalty is charged at 0.55(zero point five percent) for every seven days, odd days less than seven days should be counted as seven days. In case the Seller fails to make delivery ten weeks later than the shipment stipulated in the contract, the Buyer sha

39、ll have the right to cancel the contract. The Seller, in spite of the cancellation, shall still pay the aforesaid penalty to the Buyer without delay.除本合同第15条所述不行抗力缘由外,卖方如不能按合同规定如期交货,并同意支付罚金,买方可同意延期交货,付款银行相应削减议定的支付金额,但罚款不得超过迟交货物总额的5。卖方如逾期10个星期仍不能交货,买方有权撤销本合同。尽管合同已撤销,但卖方仍应如期支付上述罚金。17. Arbitration17、仲裁

40、All deputes in connection with this contract or the execution thereof shall be settled through friendly consultations. Should no settlement be reached, the case may then be submitted for arbitration to the Foreign Economic and Trade Arbitration Commission of the CCPIT in accordance with the rules an

41、d procedures of the said Arbitration Commission. The arbitration shall take place in 15 (fifteen) days. The decision of the Arbitration Commission shall be final and binding on both Parties. The arbitration fee shall be borne by the losing Party. The arbitration may also be settled in a third countr

42、y mutually agreed upon by both Parties.凡与本合同有关或因执行本合同而发生的一切纠纷,应通过友好协商解决,假如协商不能解决,则可提交中国国际贸易促进委员会对外经济贸易仲裁委员会并依据该会仲裁法则和程序进行仲裁。仲裁将在15天内进行,仲裁裁决为最终裁决,对双方都有约束力。仲裁费用由败诉方担当。仲裁也可在双方都能接受的第三国进行。18. Special provisions18、附加条款In witness thereof, this contract is signed by both Parties in two original copies; each

43、 Party shall keep one copy.本合同一式两份,双方签字划押,各执一份,特此证明。The Buyer: Zhonghua International Technology Corporation买方:中华国际技术开发公司The Seller: Field Emission Corp.卖方:菲尔德埃米森公司英文合同 篇2合同 CONTRACT日期: 合同号码:Date: Contract No.:买 方: (The Buyers) 卖方: (The Sellers)兹经买卖双方同意根据以下条款由买方购进,卖方售出以下商品:This contract is made by a

44、nd between the Buyers and the Sellers; whereby the Buyers agree to buy and the Sellers agree to sell the under-mentioned goods subject to the terms and conditions as stipulated hereinafter:(1) 商品名称:Name of Commodity:(2) 数 量:Quantity:(3) 单 价:Unit price:(4) 总 值:Total value:(5) 包 装:Packing:(6) 生产国别:Cou

45、ntry of Origin :(7) 支付条款:Terms of Payment:(8) 保 险:Insurance:(9) 装运期限:Time of Shipment:(10) 起 运 港:Port of Lading:(11) 目 的 港:Port of Destination:(12)索赔:在货到目的口岸45天内如发觉货物品质,规格和数量与合同不符,除属保险公司或船方责任外,买方有权凭中国商检出具的检验证书或有关文件向卖方索赔换货或赔款。Claims:Within 45 days after the arrival of the goods at the destination, sh

46、ould the quality, Specifications or quantity be found not in conformity with the stipulations of the contract except those claims for which the insurance company or the owners of the vessel are liable.The Buyers shall, have the right on the strength of the inspection certificate issued by the C.C.I.

47、C and the relative documents to claim for compensation to the Sellers.(13)不行抗力:由于人力不行抗力的原由,发生在制造、装载或运输的过程中导致卖方延期交货或不能交货者,卖方可免除责任。在不行抗力发生后,卖方须马上电告买方及在14天内以空邮方式向买方供应事故发生的证明文件,在上述状况下,卖方仍须负责实行措施尽快发货。Force Majeure:The sellers shall not be held responsible for the delay in shipment or non-deli-very of the goods due to Force Majeure, which might occur during the process of manufacturing or in the course of loading or transit. The sellers shall advise the Buyers immediately of the occurrence m

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 应用文书 > 工作报告

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁