《[精选]i2生产计划与排程(1)lbi.pptx》由会员分享,可在线阅读,更多相关《[精选]i2生产计划与排程(1)lbi.pptx(45页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、Introduction to Rhythm Factory PlannerKwok PoonMay 17,2000Agenda What Is Rhythm Factory Planner(FP)Rhythm FP Architecture Rhythm Factory Planner(FP)Planning Concept Rhythm FP featuresWhat Is Rhythm Factory Planner(FP)?What Is Rhythm Factory Planner(FP)Factory Planner uses the information from the ex
2、isting transaction system(ERP)to provide intelligent decision support capability in Planning and Scheduling Factory Planner provides a global integrated view Purchasing Order Entry Shipping MRPFactory PlannerFloor ControlDataDecisions&DataWhat Can Rhythm FP Do?Factory Planner provides a systematic a
3、nd constraint-based planning concept Factory Planner can help to minimize the current ad-hoc planning process Factory Planner can quickly reveal the production constraint,which is almost impossible for traditional planning processRhythm FP ArchitectureRhythm FP Architecture Client-Server Architectur
4、e Both server and client processes can run on Windows NT machines May run server and client on separate machines Use existing data(from Triton and SFCS)Memory Resident Multi-User capabilityRhythm FP Architecture(cont.)Rhythm FP ClientRhythm FP ClientRhythmFP ClientData FilesRhythm FP ServerRhythmFP
5、ServerProduction PlannerMaterialPlannerReport ReaderProduction ServerWhat-ifServerRhythm FP Framework(Input&Output)DemandProduct Structure:Part numberBOMRoutingsFactory Model:ResourcesResource CalendarMaterial Availability:Unassigned InventoryP.O./Vendor Info.WIPOther Information:Tools.Production Pl
6、an:CapacityMaterialRhythm FP Framework(cont.)FP requires ACCURATE and SUFFICIENT data input(garbage in&garbage out)Open loop planning process in the first phase Planners execute the production plan based on FPs suggestionBasic FP Data Objects BOM data Demand order data Part number data Unassigned in
7、ventory data Supplier part data Resource data Routing dataMore FP Data Objects Wip data Operation resource data Resource calendar data Vendor calendar data Variable capacity bucket size dataFP Output Files Critical delivery data Purchase order EDC recommendations Manufacturing order data Planned sta
8、rt times Procurement data Procurement by part data etc.FP Data Objects RelationshipDemand Orders&Forecast OrdersBOMUnassignedinventoryRouting dataVendor Info Resource dataResource calendar dataWIP dataFinished GoodsPart NumbersMfg OrdersRhythm FP Planning ConceptFP Planning Concept BTO(Build-to-orde
9、r)engine:use Demands as the driver to create plan Consider both material and capacity constraints at the same time Consider both Sales Orders and Forecasts as the demand input with different priorities Start as an Infinite Capacity Plan and progress to a Finite Capacity PlanFP Planning Concept(cont.
10、)Materials are assigned according to the BOM explosion from the finish good level also consider Time factors Raw Materials(Procured Parts)are supplied by on-hand inventory or P.O.from vendors.Manufactured parts(finish goods and intermediate parts)are supplied by WIP or manufacturing orders(work orde
11、rs).Process Flow in FPInfinite Capacity PlanningFinite Capacity PlanningCAO(constraint anchor optimization)Detail Scheduling Identify Material and Capacity Problems Fix Material Problems Attempt to fix Capacity Problems Create detailed schedulesFP Infinite Capacity Planning(ICP)Build factory model p
12、hase Inventory Assignment phase Planned start time phase Capacity utilization phase Presents plan through user interface(client)ICP-Build Factory Model Read files into memory and create resident memory model File formats in Spec Files Do consistency checkingICP-Inventory Assignment Explore Bill of M
13、aterials Determines BOM configuration and routing assignments Creates manufacturing orders to satisfy demands Net requirements for raw materials and sub-assemblies against on-hand inventory and WIP(Work-In-Process)Creates material requirementsICP-Inventory Assignment(cont.)Backward Schedule Definiti
14、on:Latest Possible Start Time(LPST)-the latest date a manufacturing task can begin and still complete on time LPST=Task Due Date-Task Processing time Calculates the LPST for each manufacturing task Each manufacturing task will have a LPST Soft constraint:violate LPST constraint will deteriorate the
15、order-fulfillment performanceICP-Inventory Assignment(cont.)Backward ScheduleSubassembly 1R.W.#1R.W.#2Sub assembly 2Computer Order Due DateTask Due Date(LPST)LPST LPSTMfg order#1Mfg order#3Mfg order#2ICP-Inventory Assignment(cont.)Inventory Assignment Prioritize demand orders(due date,priority,quant
16、ity)Sort prioritized demand orders Sort parts from end-item to raw materials Calculate demands Allocate supplies ICP-Inventory Assignment(cont.)Forward Schedule Definition:Earliest Possible Start Time(EPST)-the earliest date that a manufacturing task can begin(constrained by materials)EPST=max(Serve
17、r Start Time,Material Available Time)Calculates the EPST for each manufacturing task Each manufacturing task will have an EPST Hard constraint:production cannot be started without materials availableICP-Inventory Assignment(cont.)Sub assembly 1R.W.#1R.W.#2ComputerOrder CompletionTimeMaterial Availab
18、leTime(EPST)EPSTEPSTMfg order#1Mfg order#3Mfg order#2 Forward ScheduleSub assembly 2ICP-Planned Start Time Assign PST for each task Definition:Planned Start Time(PST)is the expected start date that a task will begin taking material availability into consideration Calculation:PST=max(EPST,LPST)Each m
19、anufacturing task will have a PST PST values may be overriden through the user interfaceICP-Capacity Utilization Determine bucket(operation time interval)configuration-from variable capacity bucket size data Calculate capacity for each bucket-from resource calendar data Calculate work load in each b
20、ucket based on PST and run time of each taskFP Finite Capacity Planning Identify the constrained resources Balance and offload loads for constrained resources in a GLOBAL view(Global optimization)Plan based on flexible strategy options(e.g.Minimize WIP)Respond quicklyFP Detail Scheduling Schedule ba
21、sed on flexible strategy options(e.g.FIFO)Able to specify the scheduling horizon Able to generate a global optimized production schedule Generate the dispatch list for execution Intelligent scheduling algorithm and resultsHow to make it successful User-own project Trust and Cooperation What are our
22、game rules?Forecast/Acceptance,S/O,P/O,etc.Thinking of future,reasonable procedures Data Clean-up Should be started from the very beginning Where,when,who,how,etc.etc.Rhythm FP FeaturesList of Some Features Transfer Batching Manufacturing Lot Sizing(CMO)Procurement Lot Sizing WIP Reporting Advanced
23、Scheduler(AS)Due Date Quoting Batch Client Alternates Alternate Parts Alternate Resources Alternate Routing ECN Effectivity Date effectivity Use-up effectivity Sequence-Dependent Setups Resource ModelingUsing Rhythm FPUsing FP-Basic UI entities Problem windows Reports Demand orders Demand order plan
24、 Mfg orders Mfg order plan Part bufferUsing FP-Problem Windows FP has the outstanding problem analytical capabilities Short order problem Late order problem Capacity shortage problem Material shortage problem Late manufacturing parts problemUsing FP-Problem Windows(cont.)Using FP-FP reports Critical
25、 delivery report Purchase order EDC report Procurement report Late material reservations Master schedule Resource loadUsing FP-Demand ordersUsing FP-Demand Order PlanUsing FP-Mfg OrdersUsing FP-Mfg Order PlanUsing FP-Part BufferQuestions&Answers9、静夜四无邻,荒居旧业贫。5月-235月-23Tuesday,May 16,202310、雨中黄叶树,灯下白
26、头人。14:57:4114:57:4114:575/16/2023 2:57:41 PM11、以我独沈久,愧君相见频。5月-2314:57:4114:57May-2316-May-2312、故人江海别,几度隔山川。14:57:4114:57:4114:57Tuesday,May 16,202313、乍见翻疑梦,相悲各问年。5月-235月-2314:57:4114:57:41May 16,202314、他乡生白发,旧国见青山。16 五月 20232:57:41 下午14:57:415月-2315、比不了得就不比,得不到的就不要。五月 232:57 下午5月-2314:57May 16,20231
27、6、行动出成果,工作出财富。2023/5/16 14:57:4114:57:4116 May 202317、做前,能够环视四周;做时,你只能或者最好沿着以脚为起点的射线向前。2:57:41 下午2:57 下午14:57:415月-239、没有失败,只有暂时停止成功!。5月-235月-23Tuesday,May 16,202310、很多事情努力了未必有结果,但是不努力却什么改变也没有。14:57:4114:57:4114:575/16/2023 2:57:41 PM11、成功就是日复一日那一点点小小努力的积累。5月-2314:57:4114:57May-2316-May-2312、世间成事,不求
28、其绝对圆满,留一份不足,可得无限完美。14:57:4114:57:4114:57Tuesday,May 16,202313、不知香积寺,数里入云峰。5月-235月-2314:57:4114:57:41May 16,202314、意志坚强的人能把世界放在手中像泥块一样任意揉捏。16 五月 20232:57:41 下午14:57:415月-2315、楚塞三湘接,荆门九派通。五月 232:57 下午5月-2314:57May 16,202316、少年十五二十时,步行夺得胡马骑。2023/5/16 14:57:4114:57:4116 May 202317、空山新雨后,天气晚来秋。2:57:41 下午
29、2:57 下午14:57:415月-239、杨柳散和风,青山澹吾虑。5月-235月-23Tuesday,May 16,202310、阅读一切好书如同和过去最杰出的人谈话。14:57:4114:57:4114:575/16/2023 2:57:41 PM11、越是没有本领的就越加自命不凡。5月-2314:57:4114:57May-2316-May-2312、越是无能的人,越喜欢挑剔别人的错儿。14:57:4114:57:4114:57Tuesday,May 16,202313、知人者智,自知者明。胜人者有力,自胜者强。5月-235月-2314:57:4114:57:41May 16,20231
30、4、意志坚强的人能把世界放在手中像泥块一样任意揉捏。16 五月 20232:57:41 下午14:57:415月-2315、最具挑战性的挑战莫过于提升自我。五月 232:57 下午5月-2314:57May 16,202316、业余生活要有意义,不要越轨。2023/5/16 14:57:4114:57:4116 May 202317、一个人即使已登上顶峰,也仍要自强不息。2:57:41 下午2:57 下午14:57:415月-23 MOMODA POWERPOINTLorem ipsum dolor sit amet,consectetur adipiscing elit.Fusce id urna blandit,eleifend nulla ac,fringilla purus.Nulla iaculis tempor felis ut cursus.感 谢 您 的 下 载 观 看专家告诉