中国铁路中国铁路发现 (16).ppt

上传人:奉*** 文档编号:87432001 上传时间:2023-04-16 格式:PPT 页数:13 大小:5.63MB
返回 下载 相关 举报
中国铁路中国铁路发现 (16).ppt_第1页
第1页 / 共13页
中国铁路中国铁路发现 (16).ppt_第2页
第2页 / 共13页
点击查看更多>>
资源描述

《中国铁路中国铁路发现 (16).ppt》由会员分享,可在线阅读,更多相关《中国铁路中国铁路发现 (16).ppt(13页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、Operation Flow for District StationPassenger trainOperation Flow for District StationOperation Flow for District StationTransit freight train without resortingTransit freight train without resortingOperation Flow for District StationOperation Flow for District StationFreight train to be broken up at

2、 arrivalOperation Flow for District StationAuto-marshalled departure freight trainOperation Flow for District StationPlacing-in and taking-out of vehicles from the freight receiving yard or private sidingOperation Flow for District StationVehicles detained for repair at the freight car repair point

3、at station or depotOperation Flow for District StationLayout of Transverse Type District StationAdvantagesReasonable layoutEasy managementStrong adaptability to various terrainsVery compactHigh operational flexibilityShort station siteLess land occupationCentralized equipmentarrangementMore convenie

4、nt for coupling and uncoupling operation of some resorting and transit trainsFacilitating further development of the stationOperation Flow for District StationLayout of Transverse Type District StationDisadvantagesThe locomotive in one direction has a long running distanceThe placing-in and taking-o

5、ut of vehicles in the freight yard will intersect with the main trackIt will interfere with the placing-in and taking-out of vehicles on the same side of the station building and the main tracksOperation Flow for District StationLayout of Longitudinal Type District StationThe up/down receiving-depar

6、ture yards are respectively located on both sides of the main track and all staggered against the running directionOne side of one receiving-departure yard can be provided with a two-way shared shunting yardIf the two-way resorting volume is relatively large and the car flow is small,another shuntin

7、g yard may be built outside the receiving-departure yard 2Operation Flow for District StationThe intersection interference of operations is less than that in transverse type stationThe distance for locomotive running through the entrance and exit sections is shortWhen the locomotive loop routing sys

8、tem is used,the servicing equipment on the receiving-departure tracks is relatively concentrated It facilitates the intersection of the branch lines or private sidings on the same side of the platformAdvantagesLayout of Longitudinal Type District StationOperation Flow for District StationLayout of t

9、he Longitudinal District Station for Passenger and Freight ServiceMain characteristics:longitudinal layout of receiving-departure yards of passenger trains and freight trainsThis layout mode is used in the case that when a station is rebuilt,there is no sufficient space for its horizontal expansionso the existing station and yard is changed to a dedicated passenger transport yard,and another freight operation yard in tandem with the passenger transport yard is built

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 大学资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁