安全员考试模拟试题(Securityofficerexammocktest).docx

上传人:无*** 文档编号:87076508 上传时间:2023-04-16 格式:DOCX 页数:18 大小:15.53KB
返回 下载 相关 举报
安全员考试模拟试题(Securityofficerexammocktest).docx_第1页
第1页 / 共18页
安全员考试模拟试题(Securityofficerexammocktest).docx_第2页
第2页 / 共18页
点击查看更多>>
资源描述

《安全员考试模拟试题(Securityofficerexammocktest).docx》由会员分享,可在线阅读,更多相关《安全员考试模拟试题(Securityofficerexammocktest).docx(18页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、安全员考试模拟试题(Security officer exam mock test)2011 security officer exam mock test questionsI. radio questions.1, the People s Republic of China criminal law provisions of article 134th, in violation of the provisions of the relevant safety management in production and operation, thus causing heavy casu

2、alties or other accident consequences, at (B) imprisonment or criminal detention, the circumstances are especially bad, in more than 3 years of fixed-term imprisonment of 7 years.A 2 years, B 3 years, C 5 years2, in accordance with the People, s Republic of China production law provisions of article

3、 eighty-first of the main person in charge of production and business units subject to criminal punishment or dismissal, since the completion of the penalty or punishment from the date (C) should be the main person in charge of any production and business units.A 2 years, B 3 years, C 5 years3, the

4、use of cranes, lifting templates, plates and other materials, the hanging templates, components and materials should be tied up, landing, obey the command, under the weight of suspended objects (C), no personnel stay.A, IM, B, 2m, C, gyration radius D, 5 m4, the legal responsibilities stipulated in

5、the Peoples Republic of China law on safety in production include criminal responsibility, administrative responsibility and (A) three kinds.A civil liability, B property liability, C other legal liabilities5, the eightieth provisions of the Peoples Republic of China safety production law, individua

6、l investors failed to protect the necessary funds for production safety, resulting in production safety accidents. If a crime is constituted, the criminal liability shall be investigated in accordance with the criminal law of the Peoples Republic of China. If the criminal punishment is not enough, t

7、he person who operates the individual shall be fined not less than 20 thousand yuan (B) or less than 10000 yuanA 10, B 20, C 306, set model storage area must be set (B) meters high block.A 1, B 1.2, C 1.5, D 27, explosions and hoistings, failing to arrange for specialized management personnel on-sit

8、e safety management, according to the “Peoples Republic of China production safety law provisions of article eighty-fifth, shall be ordered to make corrections, overdue correction, ordered to suspend business for rectification, and may be fined (B).A 10 thousand yuan of above, 50 thousand yuan of th

9、e following, B 20 thousand yuan of above, 100 thousand yuan of the following, C 20 thousand yuan of more than 200 thousand yuan of the following8, production and business units responsible for the occurrence of major accidents, not immediately organized rescue or escape during the accident in AWOL o

10、r treatment, giving demotion dismissal sanction, to escape the prescription (C) on the following detention, constitute a crime in accordance with the relevant provisions of the criminal law shall be prosecuted for criminal responsibility.A7 B 10 C 159, in a high risk of falling work, should be faste

11、ned with seat belts, safety belts should be (C) hanging in a secure place.A hang low, use B, hang high, use C, hang high, use low10, managers of construction enterprises compel other people to take risks in violation of regulations, thus causing serious casualties or other serious consequences, and

12、shall be investigated (C) according to lawA civil B administrative C criminal11, for the general contracting construction project, the sub contractor shall not be subject to the production safety accidents, and the units (A) shall bear the primary responsibility.A subcontract, B, general contractor,

13、 C supervision, D, PartyA12, “construction safety production management regulations twenty-fifth provisions, special operations personnel must be specialized safety work training, and obtain special operation (B) certificate, can be on duty.A license, B operation qualification, C security13, the con

14、struction site must be set fire lane, its width shall not be less than (B)A 3 meters, B 3. 5 meters, C 4 meters, D4. 5 meters14, practitioners in the course of work should strictly abide by the rules and regulations of safety production and operating procedures, subject to management, proper wear an

15、d use (B).A safety and sanitation facilities, B labor protection products, C labor tools15, production units, production safety accident casualties and property losses to others, shall be in strict accordance with the law shall bear responsibility for compensation, refusing to bear or the person in

16、charge by the senior law enforcement (B).A public security organ, B peoples court, C production safety inspection department16, the distribution box on the construction site, in order to prevent rain and sand invasion of electrical appliances, distribution box wire imports must be located (C)A box s

17、ide, B box, upper surface, C case, bottom surface17, after the accident, the scene of the accident the personnel shal1 immediately report to the person in charge, the person in charge of the unit shall, after receiving the report, and (A) the people, s governments above the county level of productio

18、n safety supervision and management departments and relevant departments responsible for reporting production safety supervision and management responsibilities of the occurrence of the accident within hours.A 1, B 2, C 3, D 618, construction lifting machinery and integral lifting scaffolding model,

19、 etc. since the date of acceptance of self lifting erection (C), the construction administrative departments or other departments concerned shall register.A10 B 20 C 3019, basket lifting must use independent insurance rope, rope diameter is not less than (C) mm.A 8 B 10 C12. 520, the general contrac

20、ting project of production safety accident emergency rescue plan should be (B) units unified organization.A subcontracted B turnkey C construction unit21, the operators of new posts or new construction site before, should pass (C), without education training or education training assessment unqualif

21、ied personnel, may not be on duty.A registration procedures, B leaders agreed to C safety education training22, after the occurrence of a safety accident, the person who has reported responsibility shall not report or misrepresent the accident, delay the accident repair, and if the circumstances are

22、 serious, he shall be sentenced to fixed-term imprisonment of not less than (B) or criminal detention.A2 B 3 years, C 5 years23, in order to prevent electric arc harm eyes, should be taken to protect way is to use (C)A sunglasses, B flat mirror, C filter24, the following personnel shall be examined

23、and approved by the administrative department in charge of construction or other relevant departments before they can serve. (D)A construction unit principal and project leader, B project leader and safety officerC full-time safety management personnel, D, A and C25, the state regulations, construct

24、ion units should be in the following period of time for managers and operators at least one safety education training. (C)A 3 months, B half a year, C 1 years, D 2 years26, the state regulations, production and business units using the state explicitly eliminated, prohibited the use of technology an

25、d equipment endangering the safety of production, shall be ordered to make corrections within a prescribed time. Order to stop construction or suspend production or business for rectification and impose a fine of not less than C yuan.A 1, B 3, C 5, DIO27, temporary power construction organization de

26、sign must be prepared by (C), technical responsible for the audit, and approved by the competent authorities after the implementation of temporary power consumption drawings drawn separately, and as the basis for the construction of electricity.A electrical supervisor, B project leader, C electrical

27、 engineer, D security officer28, the “construction safety management rules provisions of article sixty-fourth, the construction units in the construction before about the technical requirements for construction safety in detail or set up the worker dormitories in unfinished buildings, ordered deadli

28、ne for correction; overdue correction shall be ordered to suspend business for rectification, and impose a fine, cause (B) a serious accident, which constitutes a crime, the persons who are directly responsible for criminal responsibility in accordance with the relevant provisions of the criminal la

29、w.A more than 20 thousand yuan, less than 50 thousand yuan, B more than 100 thousand yuan, less than 50 thousand yuan C, more than 50 thousand yuan, less than 200 thousand29, the provisions of the state, the construction units without acceptance or unqualified acceptance of the construction hoisting

30、 machinery and integral lifting scaffolding, templates and other automatic lifting facilities, shall be ordered to make corrections, overdue correction, ordered to suspend business for rectification, and a fine (C).A5 more than 10000 yuan, more than 100 thousand yuan B yuan, 200 thousand yuan C, 100

31、 thousand yuan more than 300 thousand yuan30, lifting personnel must comply with (B) regulations, strictly prohibited violation, undocumented operations.A fireproof B ten not suspended from C electric31, The personnel responsible for on-site supervision and inspection of safety production are: (C)A

32、supervisor foreman B Project Manager C full-time securityofficer32, to correctly wear safety helmet, cap distance is generally (B) mm.A10 - 20 B40 - 50 C 60 - 7033, the provisions of the state, the production and business units not in accordance with the provisions of the establishment of safety man

33、agement agency or with safety management personnel, shall be ordered to make corrections, overdue correction, ordered to suspend business for rectification, shall be fined 10000 yuan (B).Al B 2 C 5 D 1034, special scaffolding and height in (C) above m tall scaffold, must have design proposal.A 10, B

34、 15, C 20, D 2535, construction units responsible person, according to the law of the unit safety production (C) is responsible for.A main B division of labor, C comprehensive36, forcing workers to risk illegal operations, thus causing heavy casualties or other criminal law and Regulations Departmen

35、t (C) shall be sentenced to fixed-term imprisonment or criminal detention, if the circumstances are especially serious, with imprisonment of over 5 years.A 2 years, B 3 years, C 5 years37, structural scaffolding vertical pole spacing shall not be greater than (C) m, vertical horizontal rod (big cros

36、s bar) spacing shall not be greater than 1. 2mA 1, B 1, 2, C 1, 5, D 2Two. NOUN explanation.1, height work - height operation means any job that may fall at a height of 2 meters above the falling height.2, Special operations - Operations recognized by the state that have a major risk factor for the

37、safety of the personnel themselves and their personnel and facilities.3, illegal command - leadership, forcing workers to violate national laws, regulations, rules or procedures for the conduct of operations.4, protective measures - in order to avoid workers in the job, a part of the body into dange

38、rous areas or exposure to harmful substances, isolation, safety distance, personal protection and other measures or means.5, Safe production conditions safety production conditions refer to various factors and combinations that meet the requirements of safety in production.The hidden danger of an ac

39、cident - the unsafe state and management defects of the person and thing that may cause the accident.6, prevention of hidden dangers - all kinds of measures and activities that may lead to accidents.8 . Risk factors - the act of taking risks to people who do not conform to the rules.9 , illegal oper

40、ations - workers do not comply with rules and regulations, risk operation.10 personal protective articles - personal wear for the purpose of preventing or reducing injury to accidents or occupational hazards in the course of professional activities.Three, Jane answer.1, “Peoples Republic of China Co

41、nstruction Law on the construction site of environmental protection and safety provisions?Answer: the construction enterprises shall take preventive maintenance safety, danger and fire prevention measures at the construction site, the condition, the construction site shall be sealed, the constructio

42、n site may cause damage to the buildings, structures and special operating environment, the construction enterprises shall take safety protection measures.The construction unit shall provide the construction enterprises with information on the underground pipelines related to the construction site,

43、and the construction enterprises shall take measures to protect them.The construction enterprise shall abide by the provisions of laws and regulations concerning environmental protection and safety production, take control and disposal of construction site of various kinds of dust, waste gas, waste

44、water, solid waste, noise, vibration and pollution to the environment and harm measures.2, Brief description of the electrical equipment used in the construction site. What are the requirements for fire protection? P332 ninthElectrical equipment used at the construction site must comply with fire sa

45、fety requirements, the temporary use of electricity must be equipped with overload protection device, switch box allowed the use of flammable and combustible materials, non overload electrical equipment, storage of flammable and combustible materials in construction site of the warehouse, wood proce

46、ssing sites, paint mixing room and waterproof workplaces may not use strong light exposed high fever lamp.3, lifting operations: ten do not hang, “what is the principle?”Answer (1) the signal is not clear, shall not lift (2), the weight is unknown, shall not be hoisted. (3) buried in the ground, not

47、 lifting (4) cable-stayed pull, not lifting (5) hanging on the station, not lifting (6) lifting someone below, shall not be lifting (7) powder binding is not strong, not lifting (8) loose items without container, not lifting (9) the vertical component model, without clasp, no lifting (10) loading me

48、chanical properties over the allowable range4, “the safety in production law of the People, s Republic of China thirty-seventh. What are the requirements for accident investigation and treatment?Answer: the investigation and handling of accidents should be realistic, respect for the principles of sc

49、ience, timely and accurately identify the cause of the accident, the accident to identify the nature and responsibilities, summarize the lessons from the accident, put forward rectification measures, and put forward opinions on the construction of responsibility, specific to the investigation and handling of accidents are formulated by the state council.5, construction safety

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 教案示例

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁