《厂房UPS系统接线图.pdf》由会员分享,可在线阅读,更多相关《厂房UPS系统接线图.pdf(39页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、 Proceed without change Proceed as corrected Revise and resubmit Rejected Dates:Name:Reference:Comments Sign.Name Sign.Name Sign.Name Sign.Name Sign.Name A Sign.Name PYL BDU BBA 30/05/2007 FIRST ISSUE GFR REV ESTABLISHED CHECKED APPROVED DATE MODIFICATIONS STATUSTHE PEOPLES REPUBLIC OF CHINA HUIZHOU
2、 PUMPED STORAGE POWER STATION Contract N:04IJBJGB/011133FR 2x(4 x 300 MW)STATION A&B CLIENT:GPSC ENGINEER:GPDI CONTRACTOR:POWER HOUSE A 220 V AC UPS System DISTRIBUTION SWITCHBOARD 10LNA001TB WIRING ELECTRICAL DIAGRAM SCALE 1/1 Subcontractor:Rev Sh/Sh End Nr Sh AHS HZH 10LNA-SD200 DT 316593 A 1/39 39 Ce document proprit de ALSTOM ne doit pas tre utilis,copi ou communiqu des tiers sans son autorisation This document is the exclusive property of ALSTOM and shall not be used,copied or communicated to third parties without their prior authorization Power Environment Hydro