《英语自我介绍资料及范文4.docx》由会员分享,可在线阅读,更多相关《英语自我介绍资料及范文4.docx(3页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、英语自我介绍资料及范文4At the period of my graduate study, my overall GPA(3.77/4.0) ranked top 5% in the department. In the second semester, I became teacher assistant that is given to talented and matured students only. This year, I won the Acer Scholarship as the one and only candidate in my department, whic
2、h is the ultimate accolade for distinguished students endowed by my university. Presently, I am preparing my graduation thesis and trying for the honor of Excellent Graduation Thesis.Research experience and academic activityWhen a sophomore, I joined the Association of AI Enthusiast and began to nar
3、row down my interest for my future research. In 1997, I participated in simulation tool development for the scheduling system in Prof. Wangs lab. With the tool of OpenGL and Matlab, I designed a simulation program for transportation scheduling system. It is now widely used by different research grou
4、ps in NUST. In 1998, I assumed and fulfilled a sewage analysis & dispose project for Nanjing sewage treatment plant. This was my first practice to convert a laboratory idea to a commercial product.In 1999, I joined the distinguished Professor Yu-Geng Xis research group aiming at Network flow pro
5、blem solving and Heuristic algorithm research. Soon I was engaged in the FuDan Gene Database Design. My duty was to pick up the useful information among different kinds of gene matching format. Through the comparison and analysis for many heuristic algorithms, I introduced an improved evolutionary a
6、lgorithm - Multi-population Genetic Algorithm. By dividing a whole population into several sub-populations, this improved algorithm can effectively prevent GA from local convergence and promote various evolutionary orientations. It proved more efficiently than SGA in experiments, too. In the second
7、semester, I joined the workshop-scheduling research in Shanghai Heavy Duty Tyre plant. The scheduling was designed for the rubber-making process that covered not only discrete but also continuous circumstances. To make a balance point between optimization quality and time cost, I proposed a Dynamic
8、Layered Scheduling method based on hybrid Petri Nets. The practical application showed that the average makeo was shortened by a large scale. I also publicized two papers in core journals with this idea. Recently, I am doing research in the Composite Predict of the Electrical Power system assisted with the technology of Data Mining for Bao Steel. I try to combine the Decision Tree with Receding Optimization to provide a new solution for the Composite Predictive Problem. This project is now under construction.本新闻共2页,当前在第1页12