1、合同法律制度与建设工程合同管理课程设计一翻译Staff and laborExcept as otherwise stated in the Specification, the Contractor shall make arrangements for the engagement of all staff and labor, local or otherwise, and for their payment, housing, feeding and transport.除非规范中另有规定,承包商应安排约定的全体员工和劳动,当地的或其他的,和他们的付款、住房、喂食和运输。The Con
2、tractor shall pay rates of wages, and observe conditions of labor, which are not lower than those established for the trade or industry where the work is carried out. If no established rates or conditions are applicable, the Contractor shall pay rates of wages and observe conditions which are not lo
3、wer than the general level of wages and conditions observed locally by employers whose trade or industry is similar to that of the Contractor.承包方支付的工资,并观察的劳动条件,建立了不低于所在地工业或贸易工作执行。如果没有既定的利率或条件都适用,承包方支付的工资,观察条件不低于一般水平的工资和条件观察当地的工业或贸易的雇主是相似的承包商The Contractor shall not recruit, or attempt to recruit, st
4、aff and labor from among the Employers Personnel.承包商不可以去或试图招聘、人员和劳工在雇主的人员The Contractor shall comply with all the relevant labor Laws applicable to the Contractors Personnel, including Laws relating to their employment, health, safety, welfare, immigration and emigration, and shall allow them all th
5、eir legal rights.承包商应遵守所有相关的劳动法律适用于承包商的人员,包括法律规定他们的就业、健康、安全、福利、入境和迁出,并允许他们所有的合法权益。The Contractor shall require his employees to obey all applicable Laws, including those concerning safety at work.No work shall be carried out on the Site on locally recognized days of rest, or out side the normal work
6、ing hours stated in the Appendix to Tender, unless: 承包商应要求他的雇员遵守所有适用的法律,包括那些有关安全工作。没有工作进行现场确认在本地的假期,或者到外面正常的工作时间怎么安排投标函附录中,除非:(a) other wise stated in the Contract,(b) the Engineer gives consent, or(c) the work is unavoidable, or necessary for the protection of life or property or for the safety of
7、the Works, in which case the Contractor shall immediately advise the Engineer.(a)合同另有规定,(b)工程师给同意,或(c)工作是无可避免的,或必要的人命或财产的保护或安全的作品,在这种情况下,承包商应立即通知工程师。Except as otherwise stated in the Specification, the Contractor shall provide and maintain all necessary accommodation and welfare facilities for the C
8、ontractors Personnel. The Contractor shall also provide facilities for the Employers Personnel stated in the Specification.The Contractor shall not permit any of the Contractors Personnel to maintain any temporary or permanent living quarters within the structures forming part of the Permanent Works
9、.除非规范中另有规定,承包商应提供和维护所有必须的住宿和福利设施为承包商的人员。承包商还应提供设施在雇主的人员规格。承包商不得允许承包商的人员维持任何临时或永久居住的宿舍在结构构成永久工程一部分的。The Contractor shall at all times take all reasonable precautions to maintain the health and safety of the Contractors Personnel. In collaboration with local health authorities, the Contractor shall en
10、sure that medical staff, first aid facilities, sick bay and ambulance service are available at all times at the Site and at any accommodation for Contractors and Employers Personnel, and that suitable arrangements are made for all necessary welfare and hygiene requirements and for the prevention of
11、epidemics.承包商应在任何时候采取一切合理的预防措施来维持健康和安全承包商的人员。在协作与当地卫生主管机关的规定,承包商应保证医务人员、急救设备、病区和急救服务随时可用到现场并在任何容纳承包商的和雇主的人员,会被安排合适的所有必要的福利和卫生要求和预防传染病。The Contractor shall appoint an accident prevention officer at the Site, responsible for maintaining safety and protection against accidents. This person shall be qua
12、lified for this responsibility, and shall have the authority to issue instructions and take protective measures to prevent accidents. Throughout the execution of the Works, theContractor shall provide whatever is required by this person to exercise this responsibility and authority.承包商应指定一个事故预防官员在现场
13、,负责维护安全、防止事故的发生。这个人必能胜任这个责任,并有权发出指令,采取的保护措施,防止事故发生。整个工程的实施承包商应提供一切所需的这个人行使这一责任和权力。The Contractor shall send, to the Engineer, details of any accident as soon as practicable after its occurrence. The Contractor shall maintain records and make reports concerning health, safety and welfare of persons,
14、and damage to property, as the Engineer may reasonably require.承包商应发送,工程师的细节,尽快任何事故发生后。承包商应保持记录和报告有关健康、安全和福利的人,他也对财产损失的,按照工程师的合理要求。Throughout the execution of the Works, and as long thereafter as is necessary to fulfill the Contractors obligations, the Contractor shall provide all necessary superint
15、endence to plan, arrange, direct, manage, inspect and test the work.整个工程的实施,从此之后是必须完成的承包商的义务,承包商应提供一切必要的管理计划、安排、指导、管理、检验和测试工作。Superintendence shall be given by a sufficient number of persons having adequate knowledge of the language for communications (defined in Sub-Clause 1.4 Law and Language) and
16、 of the operations to be carried out (including the methods and techniques required, the hazards likely to be encountered and methods of preventing accidents), for the satisfactory and safe execution of the Works.监理、不得赋予足够数量的人有足够的语言知识进行通信(定义在第1.4款【法律和语言)和作业执行(包括方法和技术要求,可能遇到的危险和预防事故的方法),满意和安全工程的实施。Th
17、e Contractors Personnel shall be appropriately qualified, skilled and experienced in their respective trades or occupations. The Engineer may require the Contractor to remove (or cause to be removed) any person employed on the Site or Works, including the Contractors Representative if applicable, wh
18、o:(a) persists in any misconduct or lack of care,(b) carries out duties incompetently or negligently,(c) fail to conform with any provisions of the Contract, or(d) persist in any conduct which is prejudicial to safety, health, or the protection of the environment.承包商的人员应当给予适当的合格,技巧和经验在各自的行业或职业。工程师可以
19、要求承包商移除或使被移除任何雇用人员在现场或工作,包括承包商的代表如果适用,谁:(一)坚持任何不当行为或缺乏关怀,(b)实施的职责无能或者过失,(三)不符合合同规定的任何或(d)坚持的行为有损于安全、健康、环境保护。the Contractor shall then appoint (or cause to be appointed) a suitable replacement person.承包商应随后任命(或导致被任命为一个合适的替换人选的人。The Contractor shall submit, to the Engineer, details showing the number
20、of each class of Contractors Personnel and of each type of Contractors Equipment on the Site. Details shall be submitted each calendar month, in a form approved by theEngineer, until the Contractor has completed all work which is known to be outstanding at the completion date stated in the Taking-Ov
21、er Certificate for the Works.承包商应提交,工程师,细节显示的每一类的数量承包商的人员及各类型的承包商的设备在现场。细节每个公历月应提交,在批准的一种形式工程师,直到承包商完成了所有的工作这被视为未付款日期所完成工程的接收证书的作品。The Contractor shall at all times take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by or amongst the Contractors Personnel, and to
22、preserve peace and protection of persons and property on and near the Site.承包商应在任何时候采取一切合理的预防措施,以防止任何违法,缤纷或行为不检,或者在承包商的人员、维护和平和保护人员和财产和附近的网站上。摘自condition of contract for constructionFirst Edition 1999ISBN 2-88432-022-9曼彻斯特大学出版社出版2223页英文词汇:reasonable precautions 合理的预防Taking-Over Certificate 接受证书Throughout the execution of the Works 整个工程的实施plan, arrange, direct, manage, inspect and test the work计划 安排 指导 管理 检查和测试工作Specification 规范Workmanship 工艺The Employers Personnel 雇主人员Rejection 拒绝Remedial Work补救工作Commencement of Works 展开工作