幕墙工程设计合同fuxp.docx

上传人:jix****n11 文档编号:63517770 上传时间:2022-11-25 格式:DOCX 页数:18 大小:19.26KB
返回 下载 相关 举报
幕墙工程设计合同fuxp.docx_第1页
第1页 / 共18页
幕墙工程设计合同fuxp.docx_第2页
第2页 / 共18页
点击查看更多>>
资源描述

《幕墙工程设计合同fuxp.docx》由会员分享,可在线阅读,更多相关《幕墙工程设计合同fuxp.docx(18页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、幕墙工程设计合同Design Contract for Curtain Wall Project工程名称Name of Project: 工程地点Location of Project: 合同编号Contract No.: 委托人(甲方)Consignor(Party A): 承接人(乙方)Consignee(Party B): 设计证书等级Level of Design Certification: 签订地点Place of Signing: 签订日期Date of Signing: 甲方委托乙方承担 设计工作,经双方协商一致,签订本合同。Party B is entrusted by Pa

2、rty A to design_. Both the two parties herewith agree to sign the contract based on the principle of common consensus.第一条 本合同签订依据Article One Basis for conclusion of this Contract11中华人民共和国合同法、建筑工程勘察设计管理条例。“The Contract Law of the Peoples Republic of China”; “Management Regulations of Investigation an

3、d Design in Construction Engineering”.12国家及上海市有关建设工程勘察设计管理法规和规章。National and local rules and regulations on Management Regulations of Investigation and Design in Construction Engineering.第二条 设计依据Article Two Design Basis 21甲方发给乙方的设计委托书或中标函。Letter of design assignment or Letter of acceptance provided

4、by the Party A to the Party B.22甲方向乙方提交的有关资料和文件。Related information and documents submitted by the Party A.2.3乙方采用的主要技术标准:Main technical standards adopted by the Party B can be showed as follows:幕墙技术要求应符合国家标准GB/T 21086-2007建筑幕墙、JGJ1022003玻璃幕墙工程技术规范和JGJ1332001金属与石材幕墙工程技术规范、企业标准的相关要求。 The technical re

5、quirements of curtain wall should conform to relevant requirements in National Standard GB / T 21086-2007 Building Curtain Wall, JGJ102-2003 “Technical Code for Glass Curtain Wall Engineering as well as JGJ133-2001 Technical Code for Metal and Stone Curtain Walls Engineering and Enterprise Standard.

6、第三条 合同文件的优先次序构成本合同的文件可视为是能互相说明的,如果合同文件存在歧义或不一致,则根据如下优先次序来判断:Article Three The documents forming the Contract are to be regarded as mutually explanatory of one another, but in case of ambiguities or discrepancies, the priority of the documents shall be listed as follows:31本合同书;The contract;32中标函(文件);

7、Letter of Acceptance (Document);33甲方提出的书面要求;Written requirements submitted by the Party A;3.4 招投标文件(图纸)Tendering document (Drawings);第四条 本工程项目的名称、规模、阶段、投资及设计内容Article Four Name, size, stages, investment and content of design in this project. 第五条 甲方向乙方提交的有关资料、文件及时间Article Five Relevant materials, doc

8、uments and time for delivery of materials and documents submitted by the Party A to the Party B. 第六条 乙方向甲方交付的设计文件、份数、地点及时间Article Six Design documents submitted by the Party B to the Party A, and the copies, location and time for delivery. 第七条 设计费用Article Seven Design Charges71甲方应向乙方支付本合同项目的设计费为RMB

9、元,(人民币大写: )。The Party A shall pay _RMB (in capital letters) to Party B as the design charges of this project in the Contract.7. 2如乙方中标博世中国研发总部项目幕墙工程,本合同项目的设计费将抵做中标合同金额的一部分。If the Party B will win the bidding in the BOSCH China R & D Headquarters Curtain Wall Project, the design charges of project wi

10、ll be regarded as a part of the amount for awarding Contract.第八条 设计费的支付方式Article Eight Terms of Payments81本合同生效后7天内,甲方向乙方预付设计费总额的50%,计_元作为定金,本合同履行后定金自动抵作设计费。Within seven days upon the effectiveness of this Contract, the Party A shall pay 50% of total amount for design charges in advance, namely_yuan

11、 as the down payment. The down payment shall be counted as the design charges upon settlement of the Contract).82乙方提交本合同规定的设计文件后,一个月内支付其余设计费。After submitted the design documents stipulated in the Contract, the Party B shall pay the rest design charges within one month.第九条 双方责任Article Nine Responsibi

12、lities of the Parties91甲方责任Responsibilities of the Party A911甲方按本合同第五条规定内容,在规定的时间内向设计人提交基础资料及文件,并对其完整性、正确性及时限负责。甲方不得要求乙方违反国家有关标准进行设计。甲方提交上述资料及文件超过规定期限,乙方按本合第六条规定的交付设计文件时间顺延。The Party A shall submit basic materials and documents to the Designer within specified period as stated in Article 5 of this C

13、ontract and shall be responsible for the completeness, accuracy and time limit of the materials and documents. The Party A shall not require the Party B to conduct design in violation of relevant national standards. In case there is a delay exceeding the specified time limit for the delivery of the

14、above materials and documents by the Party A, the time limit for the delivery of design documents submitted by Party B shall be extended accordingly; 912甲方变更委托设计项目、规模、条件或因提交的资料错误,或所提交资料作全套修改,以致造成乙方设计返工时,双方除另行协商签订补充协议(或加订文件)、重新明确有关条款外,甲方应按乙方所耗工作量给予补偿。In case of the Party Bs re-work on the design caus

15、ed by changes of design project, size and conditions by the Party A or mistakes of submitted materials, or complete revisions on submitted materials, the Parties shall conclude supplementary agreement separately (or conclude additional agreement) and redefine relevant terms and conditions, and the P

16、arty A should pay charges for re-work to the Party B according to the workload.913在合同履行期间,甲方要求终止或解除合同,乙方未开始设计工作的,不退还已付的定金;已开始设计工作的,甲方应根据乙方已进行的实际工作量,不足一半时,按该阶段设计费的一半支付;超过一半时,按该阶段设计费的全部支付。During the performance of the Contract, if the Party A requires to terminate or cancel the Contract before the Par

17、ty B starts the design work, the Party B will not return the down payment already deposit paid by the Party B; if the Party B has started the design work, the Party A shall pay for the actual workload already done by the Party B. When the actual workload of the design is less than half of the work a

18、t the stage, the Party A shall pay half of design charges at the stage. When the actual workload of the design is more than half of the work at the stage, the Party A shall pay all the charges for design work at the stage.914甲方应按本合同规定的金额和日期向乙方支付设计费,逾期支付的,每天承担应支付金额百分之一的违约金,且乙方提交设计文件的时间顺延。逾期超过30天以上时,乙

19、方有权暂停履行下阶段工作,并书面通知甲方。甲方或其他审批单位对设计文件不审批或本合同项目暂停缓建,甲方均应支付应付的设计费。9.1.4 The Party A should pay the design charges to the Party B based on the amount and date provided in this Contract. For overdue payment, the Party A should pay 1% of overdue payment as penalty, and the time for delivery by the Party B

20、shall be will be extended accordingly. If the delay of the payment exceeds more than 30 days, the Party B shall have the right to suspend the performance of the work at the next stage and give the written notice to the Party A. In case the Party A or other approval units would not approve the design

21、 documents or the construction of this Contract is suspended, the Party A should also pay the payable design charges.915甲方要求乙方在合同规定时间提前交付设计文件时,须征得乙方同意,不得严重背离合理设计周期,且甲方应给予补偿。If the Party A requires the Party B to delivery the design documents in advance within specified time, it should get the prior

22、consent of the Party B without serious deviation from the reasonable design circle, and the Party A shall pay the compensation.916甲方应为乙方派驻现场的工作人员提供工作、生活及交通等方面的便利条件及必要的劳动保护装备。The Party A should provide convenient conditions including working, living and traffic and so forth as well as necessary labor

23、 protection equipments for the workers whom the Party B appoints to the jobsite.92乙方责任Responsibilities of the Party B921乙方应按国家规定和合同约定的技术规范标准进行设计,按本合同第六条规定的内容、时间及份数向甲方交付设计文件(出现912、913、914、915规定有关交付设计文件顺延的情况除外)。并对提交的设计文件的质量负责。The Party B should carry out design work in accordance with technical standa

24、rds provided in national regulations and the Contract, and submit design documents to the Party A according to the contents、time、and copies specified in Article Six of this Contract(except for the circumstances provided in Article 912、913、914、915 under which the delivery of design documents may be e

25、xtended ), and shall be responsible for the quality of the design documents.922设计合理使用年限为25年(胶、五金配件等附件为10年)。The reasonable design life is 25 years (10 years for sealant, hardware fittings and so forth).923负责对外的设计资料进行审查,负责该合同项目的设计联络工作。The Party B shall be responsible for the inspection on foreign inve

26、stors design materials and contact on the design of the project.924乙方对设计文件出现的遗漏或错误负责修改或补充。The Party B shall be responsible for the revision or supplement to the mistakes or omission of the design documents.925由于乙方原因,延误了设计文件交付时间,每延误一天,应减收该项目应收设计费的百分之一。If the delay for delivering design documents is p

27、roduced by the Party B, each day overdue will result in the reduction of 1% of the design charges for this project.926合同生效后,乙方要求终止或解除合同,乙方应赔偿甲方十万元人民币。After the commencement of Contract, if the Party B requires the termination or cancellation of the Contract, the Party B should compensate 100,000 RMB

28、 for the Party A. 927乙方交付设计文件后,应参加甲方组织的有关单位/部门的设计审查,并根据审查结论负责不超出原定范围的内容做必要调整补充。Upon delivery of the design documents, the Party B should take part in the inspection on the design by relative units /sections organized by the Party A, and shall be responsible for necessary adjustments and supplements

29、to the content within the original scope of the design according to the inspection conclusion. 第十条 保密Article Ten Confidentiality 双方均应保护对方的知识产权,未经对方同意,任何一方均不得对对方的资料及文件擅自修改、复制或向第三人转让或用于本合同项目外的项目。如发生以上情况,泄密方应承担一切由此引起的后果并承担赔偿责任。Both parties shall protect each others intellectual property rights, without

30、 prior consent of the other party, neither party can revise any materials and documents, copy or transfer to a third party or use for the project other than that of this Contract. In case of the above circumstances, the disclosing party shall be responsible for any consequences they resulted and sha

31、ll bear the relevant compensation. 第十一条 争议Article Eleven Disputes凡因本合同引起的或与本合同有关的任何争议,由双方当事人协商解决,协商不成的:Any disputes arising out of this Contract or related to this contract, both parties should resolve them through consultation. Where the disputes can not be settled by mediation:1、 由建设行政主管部门调解;To be

32、 submitted to the construction administrative department for mediation. 2、 调解不成的,向当地人民法院提起诉讼。If failing to reach an amicable settlement agreement, the parties shall apply to local peoples court.第十二条 合同生效及其他Article Twelve Contract Effectiveness and Miscellaneous121甲方要求乙方派专人长期驻施工现场进行配合与解决有关问题时,双方应另行签订

33、技术咨询服务合同。As per the request of the Party A for dispatch of personnel to stay long on construction site so as to coordinate and solve relevant issues, the individual technical consultant service Contract shall be signed by both parties.122乙方为本合同项目的服务至幕墙报批结束为止。The service provided by the Party B will

34、be concluded until the completion of submission and approval for curtain wall.123本工程项目中,乙方不得指定建筑材料、设备的生产厂或供货商。甲方需要乙方配合建筑材料、设备的加工订货时,所需费用由甲方承担。In the project, the Party B shall not appoint manufacturers or suppliers of construction materials and equipments. Where there is a necessity that the Party B

35、 shall cooperate with the Party A in ordering the process of construction materials and equipments, the relevant expenses shall be paid by Party A.124甲方委托乙方配合引进项目的设计任务,从询价、对外谈判、国内外技术考察直至建成投产的各个阶段,应吸收承担有关设计任务的设计人员参加。出国考察费用由甲方承担。The Party A entrusts the Party B to cooperate with the engineering work o

36、f imported project and design personnel undertaking relevant design assignment shall be included in all stages from enquiry, business negotiation, domestic and overseas technical inspection until the production period. The expenses for overseas inspection will be paid by Party A.125甲方委托乙方承担本合同内容以外的工

37、作服务,需另行签订协议并支付费用。Additional agreement for any other service, which the Party A entrusts the Party B to provide, however, out of the scope of the Contract, shall be signed and the payment shall be paid correspondingly.126由于不可抗力因素致使合同无法履行时,双方应及时协商解决。For any failure to perform any term or condition of

38、this Contract due to the force majeure, both parties shall, in good faith, attempt to settle amicably and by mutual agreement.127本合同经双方签字盖章后生效,本合同一式两份,甲乙双方各执一份。The Contract will go into effect once after both parties stamped and signed. This Contract is in duplicate, and each of the parties retains

39、one copy.128双方履行完合同规定的义务后,本合同即行终止。The Contract is to be concluded once after both parties fulfilled their specified in the Contract.129双方认可的来往传真、函件、会议纪要等,均为合同的组成部分,与本合同具有同等法律效力。Any faxes, telegram, meeting minutes agreed by both parties, are components of the Contract, which shall have the same vali

40、dity with this Contract.1210未尽事宜,经双方协商一致,签订补充协议,补充协议与本合同具有同等效力。As for matters not covered in this Contract, supplementary contract may be concluded by both Parties separately and such supplementary contract shall have the same legal validity with this Contract.此页无正文No texts on this page委托方名称:(盖章) 承接

41、方名称:(盖章)Name of Consignor (stamp): Name of Consignee (stamp): 法定代表人:(盖章) 法定代表人:(盖章) Legal Representative (stamp): Legal Representative (stamp):邮政编码: 邮政编码:Postal code: Postal code:电话: 电话:Tel: Tel:传真: 传真:Fax: Fax:开户银行: 开户银行:Opening Bank: Opening Bank:银行帐号: 银行帐号:Bank Account: Bank Account:签订合同代表:(签字) 签订合同代表:(签字)Contract Representative (signature): Contract Representative (signature):签订日期: 签订日期:Date of Signing: Date of Signing:

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 技术资料 > 技术方案

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁