f电力公司浪费经营管理(推荐DOC160).doc

上传人:赵** 文档编号:50408757 上传时间:2022-10-15 格式:DOC 页数:158 大小:908.50KB
返回 下载 相关 举报
f电力公司浪费经营管理(推荐DOC160).doc_第1页
第1页 / 共158页
f电力公司浪费经营管理(推荐DOC160).doc_第2页
第2页 / 共158页
点击查看更多>>
资源描述

《f电力公司浪费经营管理(推荐DOC160).doc》由会员分享,可在线阅读,更多相关《f电力公司浪费经营管理(推荐DOC160).doc(158页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、2022年-2023年建筑工程管理行业文档 齐鲁斌创作GENERAL ELECTRIC COMPANYWASTE MANAGEMENT WORK PLAN FOR COUNTRYei十月 9, 2022TABLE OF CONTENTSINTRODUCTIONTAB 1 - INVENTORY OF WASTESTABLE 1 - International Waste Management CodesFORM 1-1 - Quarterly Waste Inventory Summary for Hazardous WastesFORM 1-2 - Quarterly Waste Inven

2、tory Summary for Non-Hazardous WastesFORM 1-3 - Waste Profile SheetFORM 1-4 - Checklist for Inventory of WastesTAB 2 - LOCAL REGULATORY WASTE MANAGEMENT REQUIREMENTS IN COUNTRYTAB 3 - WASTE MANAGEMENT PERMITS, LICENSES AND AUTHORIZATIONSFORM 3-1 - Permit/License/AuthorizationFORM 3-2 - Permit/Licens

3、e/Authorization ModificationFORM 3-3 - Hazardous Waste Management Activities/Units Exempt From Permits/AuthorizationsFORM 3-4 - Checklist for the Inventory of Hazardous Waste Management Permits/Licenses/AuthorizationsTAB 4 - ON-SITE WASTE MANAGEMENTFORM 4-1 - Documentation of On-site Waste Managemen

4、t UnitsFORM 4-2 - Hazardous Waste Container Storage Area Inspection FormFORM 4-3 - Hazardous Waste Tank Inspection FormFORM 4-4 - Landfill Inspection FormFORM 4-5 - Surface Impoundment Inspection FormFORM 4-6 - Waste Pile Inspection FormFORM 4-7 - Thermal Combustion Devices Inspection FormFORM 4-8 -

5、 Physical/Chemical Treatment Inspection FormFORM 4-9 - Checklist for On-site Waste ManagementTAB 5 - SHIPMENTS OF HAZARDOUS WASTEFORM 5-1 - Preparation of Hazardous Material Shipping PapersFORM 5-2 - Hazardous Waste Shipping Paper Tracking FormFORM 5-3 - Notification of Intent to Export Hazardous Wa

6、steFORM 5-4 - Annual Hazardous Waste Export Report FormFORM 5-5 - Checklist for Tracking Shipments of Hazardous MaterialsTAB 6 - EQUIPMENT DECONTAMINATION PROCEDURESFORM 6-1 - Equipment Decontamination FormFORM 6-2 - Checklist for Equipment Decontamination ActivitiesTAB 7 - EMERGENCY PLANNINGFORM 7-

7、1 - Emergency Spill Reporting Summary and Phone LogFORM 7-2 - Local Authority and Community Contact List for Reporting Emergency SpillsTAB 8 - RISK MANAGEMENTFORM 8-1 - Risk ManagementTAB 9 - HAZARDOUS WASTE TRAINING PROGRAM AND RECORDKEEPINGFORM 9-1 - Training FormFORM 9-2 - Employee Training Sched

8、uleTAB 10 - CORRESPONDENCE LOGFORM 10-1 - Written Correspondence RecordFORM 10-2 - Phone Conversation RecordTAB 11 - WASTE MANAGEMENT SELF ASSESSMENTTAB 12 - WASTE MANAGEMENT ACTION PLANFORM 12-1 - Waste Management Action PlanTAB 13 - GLOSSARYAPPENDIX A - SAMPLE FORMSSAMPLE FORM 1-1 - Quarterly Wast

9、e Inventory Summary for Hazardous WastesSAMPLE FORM 1-2 - Quarterly Waste Inventory Summary for Non-Hazardous WastesSAMPLE FORM 1-3 - Waste Profile Sheet (Sample No. 1)SAMPLE FORM 1-3 - Waste Profile Sheet (Sample No. 2)SAMPLE FORM 3-1 - Permit/License/Authorization StatusSAMPLE FORM 3-2 - Permit/Li

10、cense/Authorization ModificationSAMPLE FORM 3-3 - Hazardous Waste Management Activities/Units Exempt From Permits/AuthorizationsSAMPLE FORM 4-1 - Documentation of On-site Waste Management UnitsSAMPLE FORM 5-1 - Preparation of Hazardous Material Shipping PapersSAMPLE FORM 5-2 - Hazardous Waste Shippi

11、ng Paper Tracking FormSAMPLE FORM 5-4 - Annual Hazardous Waste Export Report FormatSAMPLE FORM 6-1- Equipment Decontamination FormAPPENDIX B - COPIES OF LOCAL LAWS AND REGULATIONSAPPENDIX C - GE INTERNATIONAL WASTE EXPORT POLICYAPPENDIX D - BASEL CONVENTIONAPPENDIX E - APPROVED VENDOR PROGRAMAPPENDI

12、X F - GLOBAL WASTE SITE QUALIFICATION AUDIT PROTOCOLAPPENDIX G - BUSINESS WASTE MANAGEMENT CONTACTS6INTRODUCTIONThe GE Global Waste Management Work Plan has two purposes (1) to assist Environmental, Health and Safety (EHS) Coordinators and plant personnel understand the key elements of an effective

13、waste management system; and (2) to assist EHS Coordinators and plant personnel achieve Company or Business-level environmental goals through sound waste management practices. Completion of this work plan will help ensure compliance with requirements imposed by regulatory agencies in countries aroun

14、d the world and with GE policies.Key ConceptsTo satisfy the goals of this work plan, you must be able to answer the following basic questions regarding wastes produced at your facility: What wastes are generated? How should each waste generated be classified? Which management requirements apply to e

15、ach waste? Does the waste management activity require a permit or other similar authorization from a regulatory agency? Are wastes properly managed on-site? Are wastes that are shipped off-site properly packaged and labeled and are the correct shipping papers completed? Have waste transporters and o

16、ff-site waste management firms been audited to ensure they comply with all applicable regulations and best practices? Do your facilitys records clearly document compliance with waste management requirements? Is waste management equipment properly managed when it is taken out of service?This work pla

17、n will help you answer these questions and serve as a guide to properly manage these issues.Relationships with Other Work PlansThe Waste Management Work Plan relates to the following Work Plans: Chemical Management - The chemical inventory process described in the Chemical Management Work Plan provi

18、des input to the waste inventory. The proper management of chemicals overlaps with key concepts of waste management. Air Emissions Work Plan - Refer to the Air Emissions Work Plan to manage air emissions generated from waste management units. Water Work Plan - Refer to the Water Work Plan to manage

19、wastewater discharges generated from waste management units and equipment decontamination. Pollution Prevention - The Waste Management Work Plan provides the Waste Inventory as input to the Pollution Prevention Work Plan. The reduction of wastes overlaps with key concepts of pollution prevention. Em

20、ergency Preparedness - Comprehensive emergency planning and preparedness procedures in response to the generation, storage, handling, treatment and/or disposal of hazardous waste are addressed in the Emergency Preparedness Work Plan. Health and Safety Framework - Steps to protect workers from exposu

21、re to hazardous waste are addressed in the Health and Safety Framework.Priority steps to implementing the Waste Management Work PlanBy implementing the following priority steps, the facility should achieve an effective Waste Management Program and compliance with local requirements.1. Inventory all

22、wastes managed at the facility.Tab 12. Conduct a hazard determination for all wastes on the inventory.Tab 13. Verify compliance status of all waste management activities.Tab 34. Establish procedures for inspecting and maintaining on-site waste management units.Tab 45. Establish procedures for proper

23、 shipments of hazardous waste.Tab 56. Decontaminate waste management equipment.Tab 6TAB 1 - INVENTORY OF WASTESPurposeThe purpose of this section of the work plan is to provide guidance on how to (1) inventory all wastes managed at the facility, and (2) document the basis for how each waste is class

24、ified. This section also provides separate inventory forms for non-hazardous and hazardous industrial wastes generated at your facility.Key ConceptsIn many countries, facilities are required to submit information regarding the type and amount of waste generated (see regulatory summary Tab 2). Even w

25、hen not required by law, it is a best practice to maintain an inventory of all the wastes produced. In addition to compiling an inventory of each hazardous waste generated, it is important to document how each waste is managed on-site. The primary focus of this work plan is on wastes that pose a sub

26、stantial threat to human health or the environment if improperly managed. Throughout this work plan, these wastes will be referred to as hazardous wastes. The term hazardous waste, as it is used in this work plan, refers to a waste that, because of its quantity, concentration, or physical, chemical,

27、 or infectious characteristics, is subject to controls imposed by a regulatory agency. The regulatory agency in your country may use the term “toxic waste”, “dangerous waste”, “special waste”, or another term instead of the term hazardous waste. As hazardous wastes generally are regulated more strin

28、gently than non-hazardous wastes, it is important that you determine whether each waste generated is hazardous or non-hazardous and document the basis for each determination.Unless otherwise prohibited by a regulatory agency, hazardous waste determinations may be performed by applying your knowledge

29、 of the waste based on the materials or processes used. In situations where you do not possess sufficient knowledge to determine whether a waste is hazardous, you should collect a representative sample of the waste and submit it for laboratory analysis. In some countries, the methods for laboratory

30、analysis may need to be approved by the national environmental agency. Furthermore, hazardous waste determinations should be repeated whenever process changes are made that might significantly alter the hazardous nature of the waste.If you are not sure whether a waste is hazardous, but suspect that

31、it might be, you should manage it as hazardous waste until analytical data is obtained that confirms the waste is not hazardous. This is a best practice because (1) a hazardous waste may be considered to be hazardous at the point of generation, not when laboratory data confirm that it is hazardous a

32、nd (2) whatever risk the waste poses begins when it is first produced, not when you eventually determine the hazard is present.InstructionsPart 1 - Plant ProfilePlant profiles and process maps are tools used to identify every step of a process, from the beginning to the end of and operation, and to

33、track where wastes are generated throughout a process. If available, insert a Plant Profile or Process Map behind this Tab. If a plant profile or process map is not available, create an action item in Tab 12 to collect this information. Process maps can be constructed by identifying the original inp

34、uts of each process and tracking those inputs to the end of a process (the map should include chemicals added, solid wastes generated, etc.). Plant profiles should indicate the waste stream generation points. This Tab should also be used to reference the location of the following plant diagrams: Any

35、 diagram prepared for the contingency plan and emergency procedures, Design drawings for waste management units (landfills, waste piles, etc.), and Waste management system flow diagrams.Part 2 - General DirectionsIf other than kilograms, please indicate the measurement units used when you complete t

36、he quantity section of the following forms. Also, please use the waste management codes in Table 1 to indicate how the wastes are managed on-site. Sample copies of all forms are behind Appendix A. 1. Complete Forms 1-1 and 1-2, Waste Inventory Summaries, for all wastes managed at the facility. Use F

37、orm 1-1 for hazardous wastes and Form 1-2 for non-hazardous wastes. Complete Form 1-3, Waste Profile Sheet, for each waste on the Waste Inventory. Include any obsolete or unwanted chemicals identified during the chemical sweep in the Waste Inventory. Refer to Tab 3 of the Chemical Management Work Pl

38、an for details on conducting a chemical sweep.2. The information compiled to develop the Waste Inventory and Profile Sheets can also be used in your Pollution Prevention Program (see the Pollution Prevention Work Plan).3. Follow your national or local requirements to determine whether wastes managed

39、 at the facility are hazardous wastes (see Tab 2).4. For each waste (hazardous and non-hazardous), use Form 1-3 contained within this Tab, to document the basis for your hazard determination. This is especially important if you classify a waste based on your knowledge rather than testing. The Chemic

40、al Identification and Tracking Form provided in Tab 5 of the Chemical Management Work Plan may be useful for the classification of chemical wastes.5. If your knowledge of the waste is not sufficient to properly classify the waste, you should prepare an action item in Tab 12 to have the waste analyze

41、d for the physical and chemical properties you suspect it may have. Keep a file that contains all supporting analytical data for each waste stream.6. Assign a code to each waste managed at the facility (hazardous and non-hazardous). In many countries, waste codes are provided by the national environ

42、mental agency. In addition, waste stream categories are provided in the Basel Convention (see Appendix D of this work plan). If these options do not apply, use the following system to assign a plant-specific code to each waste stream.Model Waste Code System:-Three letter plant code (to be assigned b

43、y your Business),-“HW” or “NW”, for hazardous or non-hazardous wastes, and-Three digit number.7. Complete Form 1-4, the Checklist for Inventory of Wastes, to ensure that all requested informationhas been provided. Unless your country has established its own system of waste management codes, use the

44、codes provided in Table 1 to describe waste management methods when completing Forms 1-1 and 1-2 (columns 4 and 6). The codes have been taken from the Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and their Disposal.Table 1International Waste Management CodesOperatio

45、ns which do not lead to the possibility of resource recovery, recycling, reclamation, direct re-use or alternative uses D1Deposit into or onto land (landfill, waste pile, etc.)D2Land treatment (biodegradation of liquid or sludgy discards in soils, etc.)D3Deep injection (injection of pumpable discard

46、s into wells, salt domes or naturally occurring repositories, etc.)D4Surface impoundment (placement of liquid or sludge discards into pits, ponds or lagoons, etc.)D5Specially engineered landfill (placement into lined discrete cells which are capped and isolated from one another and the environment,

47、etc.)D6Release into water body except seas/oceansD7Release into seas/oceans including sea-bed insertionD8Biological treatment not specified elsewhere in this list which results in final compounds or mixtures which are discarded by means of any of the operations in Section A*D9Physico-chemical treatment not specified elsewhere in this list which results in final compounds or mixtures which are discarded by means of any of the operations in Section A*D10Incineration on landD11Incineration at seaD12Permanent storage (placement of containers in a

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 高考资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁