《2022年装卸时间事实记录 .pdf》由会员分享,可在线阅读,更多相关《2022年装卸时间事实记录 .pdf(4页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、一、船舶抵达1.抵达引水锚地Anchored at Pilot anchorage.Arrived at Pilot anchorage 2.抵达检疫锚地Anchored at Quarantine anchorage 3.等候引水Awaiting pilot,Waiting for pilot 4.等候联检Awaiting Joint Inspection 5.检疫通过Free Pratique granted 6.进行联检Joint Inspection conducted 7.联检完毕Joint Inspection completed 8.等候潮水进港Awaiting tide for
2、 entry 9.(从引水站)驻往装、卸泊位Proceeding to berth for loading/discharging 10.从 锚 驶 往 装/卸 泊 位Heaved up(Weighed)anchor and proceeded to berth for loading/discharging 11.驶靠第 X 号码头 Proceeded&berthed alongside wharf NO,12.从浮筒移至装/卸泊位 Shifting from buoys to loading/discharging berth 13.船系 XX 号浮筒 Moored at buoys NO
3、,14.因,不能进港Failed to enter due to,15.因,返回锚地Turned back to anchorage due to,二、装卸准备1.准备装卸Preparation for loading/discharging 2.首末次开盖舱First opening&final closing of hatches 3.整理吊杆Rigging derricks.4.清扫舱(船员/工人清扫)Cleaning holds(by crew members/shore labors)5.铺垫舱Dunnaging and matting 6.水密检验通过Water tight tes
4、t passed 7.接油管Connecting oil pipes 8.拆油管Disconnecting pipes 9.搭雨蓬Erecting rain tents 10.拆雨蓬Taking off rain tents 11.搭防动设备Erecting grain fitting(at hatch NO,)12.搭防动板Erecting shifting boards(at hatch No,)13.拆防动板Dismantling shifting boards(at Hatch No,)14.工人上船做准备Stevedore boarded for preparation of hol
5、ds 15.商检人员上船验舱Cargo Surveyors boarded for inspection of holds 16.验检不合格Inspection of holds not passed 17.验舱合格Inspection of holds 18.第 X 舱商检合格Hold No.X inspection passed 19.全部货舱通过All holds inspection passed 20.安放漏斗Erecting feeders 三、装卸作业1.开始安装Loading/discharging commenced 1.继续安装Loading/discharging con
6、tinued 2.恢复装卸Loading/discharging resumed 名师资料总结-精品资料欢迎下载-名师精心整理-第 1 页,共 4 页 -3.暂停装卸Loading/discharging suspended 4.在雨蓬下装卸Loading/discharging under rain tents 5.开几条路(几个头)装卸Loading/discharging with,gangs 6.装卸完毕Loading/discharging completed 7.公估Determine the quantity of cargo loaded by draft survey 8.卸
7、地脚Discharging cargo sweepings 9.(特殊)平舱(Special)trimming of cargo 10.扫舱Sweeping holds 11.等驳船(车皮)Awaiting lighters/wagons 12.等加载Awaiting arrangement for additional cargo 13.等待租方装货安排Awaiting Charters loading arrangement 14.等待租方装货安排Awaiting shifting 15.等候舱口照明Awaiting cargo lights 16.因 XX 原因装/卸暂停No work(
8、Loading/discharging suspended)due to,四、装卸时间1.递交 NOR Notice of Readiness tendered 2.接受 NOR Notice of Readiness accepted 3.收到 NOR Notice of Readiness received 4.开始计算时间Time commenced received 5.用于装/卸的时间Time used for loading/discharging 6.不计时间Time not to count 7.按租约不计时间Time not to count 8.扣除 1/5 时间Time
9、deducted by 1/5 9.星期日不计时间Time not count on Sunday 10.元旦、春节、“五一”、国庆节不计时间New Years Day/Spring Festival/May day/National Day of Peoples Republic of China,time not Count 11.星期六下午不计时间Saturday afternoon,time not to count 12.例假日前一天XX 时不计时间The day before holiday,time not to count after,hours 13.例假后一天8 小时前不计
10、时间The day after holiday,time not to count before 8 a.m 14.星期一 8 时起前不计时间Monday,time not to count before a.m 15.星期一从8 时起算时间Monday,time to count from 8.am 16.冷却吸扬机时间Time for cooling the motor of sucker 17.装卸重货时间Time not to count for loading/discharging heavy lifts 18.雨蓬下装卸不计时间Loading/discharging under
11、rain tents,time not to count 19.雨蓬下装卸,时间按50%计算Loading/discharging under rain tents,time 50%to count 五、因气象、船舶属具原因停工1.因雨停工Suspended loading/discharging due to rain/snow 2.因间断下雨停工Suspended loading/discharging due to intermittent rain 3.因防下雨停工Suspended loading/discharging due to precaution against rain
12、4.天快下雨Suspended loading/discharging due to threatening weather 1.因雾停工Suspended loading/discharging due to fog 2.因雪停工Suspended loading/discharging due to snow 名师资料总结-精品资料欢迎下载-名师精心整理-第 2 页,共 4 页 -3.因大风、台风停工Suspended loading/discharging due to strong wind/typhoon 4.因气候不良停工Suspended loading/discharging
13、due to bad weather 5.因潮水上码头停工Suspended loading/discharging due to tide flooding over the wharf 6.因台风信号升挂停工Suspended loading/discharging due to hoisting of typhoon warning signal 7.因港口受台风影响而停工Suspended loading/discharging due to the port affected by typhoon 8.台风警报解除Typhoon Alarm released 9.因扫沟水停工Susp
14、ended loading/discharging due to sweeping of the bildge 10.因扫雪停工No work due to sweeping of snow 11.移至,避风Shifting to,for taking shelter against typhoon/storm 12.X 舱因绞车故障停工Loading/discharging suspended in hatch NO,Due to winch breakdown(trouble)13.X舱因吊货钢丝故障停工Loading/discharging suspended in Hatch NO,D
15、ue to cargo Runner trouble.14.X舱因硬尾绳故障停工Loading/discharging suspended in hatch NO,Due to winch breakdown(trouble)15.X 舱因货灯故障停工Loading/discharging Suspended in hatch NO,Due to failure of cargo light 16.X 舱更换滑轮停工Loading/discharging Suspended in hatch No,owing to replacing of block 17.X 舱因更换钢丝绳停工Loadin
16、g/discharging Suspended in hatch NO,owing to replacing of cargo runner 18.因蒸汽不足停工Suspended loading/discharging due to insufficient Steam 19.因船舶停电停工Suspended loading/discharging due to suspension of ship s power 20.因灯光不足停工Suspended loading/discharging due to insufficient light 21.因 主 机(辅 机)故 障 停 工Sus
17、pended loading/discharging due to warping the ship forward/astern 22.因 油 泵 故 障 停 工Suspended loading/discharging due to main engine(auxiliary engine)trouble 23.因船往前(后)绞泊停工Suspended Loading/discharging due to warping the ship forward astern 24.因调整前后吃水停工Suspended Loading/discharging due to adjusting dr
18、afts 25.因修改积载图停工Suspended loading/discharging due to revising Stowage Plan 四、船舶动态1.由于低潮往外拉Ship being kept off from due to low water 2.船舶回靠码头(指重新靠码头)Ship hard up against wharf 3.移泊Shifting from,wharf(buoys)to,wharf(buoys)4.前后通挡若干尺(沿码头前后移动)Warping forward/astern,ft alongside the wharf 五、熏蒸1.植检人员(植物检验人
19、员)发现舱内有虫Insects found in all holds by Surveyors/Plant Quarantine Inspectors 2.商检人员口头通知熏蒸Cargo fumigation as per Surveyors notice 3.商检人员正式通知熏蒸Cargo fumigation as per Surveyors official order 4.船移泊熏蒸Shifting from wharf NO,to buoys NO.for fumigation 名师资料总结-精品资料欢迎下载-名师精心整理-第 3 页,共 4 页 -5.准备熏蒸Preparation
20、 for fumigation 6.投药Chemical gas applied 7.船熏蒸Fumigation conducted 8.放毒气Poisonous gas released 9.船舶安全Vessel found in safe condition 四、油区装卸1.排放压舱水Disballasting 2.接管线Connecting pipe lines/hoses 3.验舱Surveying tanks 4.开泵Pumping completed 5.扫管线(清洗管线)Pipe Lines/Hoses blowing 6.拆管线Disconnecting pipe lines/hoses 7.自流Self flowing with residue pressure 名师资料总结-精品资料欢迎下载-名师精心整理-第 4 页,共 4 页 -