2022年小学数学单位换算专题训练 .pdf

上传人:C****o 文档编号:38687136 上传时间:2022-09-04 格式:PDF 页数:7 大小:109.29KB
返回 下载 相关 举报
2022年小学数学单位换算专题训练 .pdf_第1页
第1页 / 共7页
2022年小学数学单位换算专题训练 .pdf_第2页
第2页 / 共7页
点击查看更多>>
资源描述

《2022年小学数学单位换算专题训练 .pdf》由会员分享,可在线阅读,更多相关《2022年小学数学单位换算专题训练 .pdf(7页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、1, and prepare d according to 1.1, a nd thermal power engineering started debuggi ng work provides 1.2, and thermal power power plant construction engineeri ng started and the completed acceptance procedures 1.3, and thermal power unit started steam Blow pipe guide is 1.4, and thermal power engineer

2、ing a djustment try shippe d quality test and the evaluation standard 2, and #1 furnace started debugging organization measures and the related provides 2.1, and organization Divisi on: for guarantee wide up thermal power plant #1 furnace started debugging and the part steam machine sy stem of smoot

3、h voted shipped, spe cial established #1 furna ce try shipped professional group, members following: leader: Deputy Leader: supervision: crew: wide up try shippe d per sonnel: wide up acceptance personnel: 2.2, and debuggi ng, a nd try shipped content: boiler auxiliary machi ne Division debuggi ng e

4、lectric dust of Division try turned and the debugging baki ng furnace Cook furnace boiler rushed tube, and blow sweep security door check 2.3, and operation provi des a nd the Division: #1 furnace debuggingand try shipped by #1 furna ce try shipped professional group requirements for, which single t

5、ry turned a nd Divi sion try shipped by xD three company led is responsible for. all moving operation operation must be in strict accorda nce with the prior authorization of the #1 boiler commissioning professional working group, and after starting, the test command-approved #1 furnace steps in he t

6、est programme, event of temporary changes be re ported to hea dquarters approval. commissioning, trial operation processis required for each project by Northwestelectric power construction company ready equipment installation records, and fill in the test application form, the a and b sides after pa

7、ssing the checks, fill in partial commissioning checking before a visa , reported hea d of the appr oval, carried out by the leader of unified command. About each a ction are made by the leader of a unified command, operation after the report to the team leader. Without the Directors consent shall n

8、ot unilaterally make any startup operation, such as single operations, who is responsible for all security responsi bilities, with no ties to the other side. all before the first turn of the motor, must be approved by both parties a common roll insulation measurement can be carried out properly. Aft

9、er the end of each proje ct commissioning, fill in partial acce ptance visa trial shipments. As motor in r otating equi pment commissioni ng test switch and mechanical part of their trial cannot continuously, this i s consi dered two test project s shall be carried out according to the above four st

10、eps. 2.4, a nd attached work votes issued peopl e, and license people, and work head list: party electrical first species, and second species work votes license people list: party engine work votes license people list : b electrical first species, and second spe cies work votes issue d peopl e: b ho

11、t control professional issued people list: b hot control professional work head: b steam machine pr ofessional work votes issued people: b steam machine professional work votes head: b boiler professional work votes issued people: b boiler professional work votes head: attached: about personnel of c

12、ontact phone party b Division 3, boiler auxiliary equi pment debuggingscenarios 3.1, send, induced draft fan try turned 3.1.1, try turning the former requirements of: 3.1.1.1, fan body and motor installed, based the second Grouting ends, and the concrete strength is up. 3.1.1.2, coupling the Centre

13、has finishe d aligni ng standards, approved visa. 3.1.1.3, bearing clearance normal outer rims and bearing clearance i s up t o standard. 3.1.1.4, Benton3.3.3.5, measure the le ngth of insurance, a record, for when the next maintenance reference. 3.3.3.6, ready to install, try turning accepta nce vi

14、sa records archive for safekeeping. 4, partial transfer test and commissioning programme that is dusting 4.1, try turning the former requirements of 4.1.1, import and export of dust flue is installed. 4.1.2, ESP acceptance visa framework, shell is installed. 4.1.3, outdoor rooftop installation finis

15、hed weldi ng, do not leak. 4.1.4, platforms, stairs and railings are all installed. 4.1.5, cathode and anode is inst alle d, the same polar distance guarantees 400mm 5mm. And acceptance of visa. 4.1.6, ng Jizhen install, vibration reducer oil, oil level is clear and correct. Universal joint into the

16、 butter. 4.1.7, the cathode vibrating installation, initial running in off-axis installed, vi bration reducer oil, oil level is clear and correct. Universal joint into the butter. 4.1.8, air distribution, deflector installed, fixed by the prison. 4.1.9, entry boxes installed, external insulation vas

17、es clean, no defects such as cracks, porcelain, and pressure test. 4.1.10, cathode vibrating wall insulation casing and the insulation gland plate complete gap correctly. 4.1.11, the town changes the tubing is installed, acce ss to the fuel tank. 4.1.12 ESP body lighting installed and put into use.

18、4.1.13, insulation work all over. 4.2, transfer and commissioni ng test 4.2.1, first start the ang for vibration motors to determine direction, turn correct try 2H. Green r un by Yng vibrating strike hammers, check crank should rotate, flip, flexible, and hitting the hip bar Center, gearbox function

19、ing, no oil leakage, beari ng temperature does not exceed 80 c. Motor current does not excee d the rated current. 4.2.2, start the cathode vibrating confirm turn to determine turn to try to go after 2H. Try to go check the cathode when vibrating strike hammers should be flexible rotation, flippi ng,

20、 and hitting on the cathode framework, gearbox functioning, no oil leakage, bearing temperature does not exceed 80 c. Motor curre nt does not exceed the rated current. 4.2.3, try to go after passing t he yin a nd ang Jizhen hammer and yin and ang Jizhen and spooling of the fastening nut a nd then ti

21、ghten it again after, nuts welded i n jail, remember! in the cathode spot welding nut should be built right on the ground to prevent large currents through the cathode framework to the town town of rheologica l damage evolution. Welding finish must be removed after installation of ground, avoid shor

22、t-circuit cause d by electric boost. 4.2.4, cathode and anode go after passi ng the test, will try the turning shaft dismantle cathode, put on the formal use of the ceramic shaft, after installation close the cathode vibrating ceramic shaft incubator people emen and locked. 4.2.5, check the electric

23、 field to be unmanned, hopper clean a nd free of debris, after confirming the above electric field two manholes and close d and locked the door. 4.2.6 heater-cathode ceramic shaft, input insulated box and inlet box heater, initial heating time 12h. And set the heating temperature of the upper and lo

24、wer limits. 4.2.7, after completion of the work, rheological empty town l, charge d empty after passing the rose field. (Air rise, live field testing 小学 四年级数学 小学数学单位换算专题训练一、填空60 毫米 ( )厘米2 吨 ( )千克8 米 ( )分米5000 克 ( )千克3 千克 ( )克7 千米 ( )米400 厘米 ( )米6000 千克 ( )吨3吨 500 千克 ( )千克3600 千米 ( )千米 ( )米1 吨 320 千克

25、( )千克480 毫米 520 毫米 ( )毫米 ( )米7008 千克 ( )吨( )千克4 米 7厘米 ( )厘米1 米 54 厘米 ( )厘米830 克 170 克( )克 ( )千克20 张纸叠起来厚1 毫米, 100 张叠起来厚 ( )毫米每个曲别针长30 毫米,粗 1 毫米这样两个曲别针扣起来长( )毫米200 平方分米 =()平方厘米70000 平方厘米 =()平方分米620000 平方厘米 =()平方米400000000 平方分米=()平方千米960000000平方米 =()平方千米 18平方米 =()平方分米34平方千米 =()平方米 9平方米 =()平方厘米5 平方千米 =

26、()平方米 3平方米 =()平方分米1 米=( )分米 1千米=( )米1 米=( )厘米1 分米=( )厘米 1厘米=( )毫米1 元=( )分1 角=( )分 1元=( )角1 吨=( )千克精选学习资料 - - - - - - - - - 名师归纳总结 - - - - - - -第 1 页,共 7 页1, and prepare d according to 1.1, a nd thermal power engineering started debuggi ng work provides 1.2, and thermal power power plant construction

27、 engineeri ng started and the completed acceptance procedures 1.3, and thermal power unit started steam Blow pipe guide is 1.4, and thermal power engineering a djustment try shippe d quality test and the evaluation standard 2, and #1 furnace started debugging organization measures and the related pr

28、ovides 2.1, and organization Division: for guarantee wide up thermal power plant #1 furnace started debugging and the part steam machine system of smooth voted shipped, spe cial established #1 furna ce try shipped professional group, members following: leader: Deputy Leader: supervision: crew: wide

29、up try shippe d per sonnel: wide up acceptance personnel: 2.2, and debuggi ng, a nd try shipped content: boiler auxiliary machi ne Division debuggi ng electric dust of Division try turned and the debugging baki ng furnace Cook furnace boiler rushd tube, and blow sweep security door check 2.3, and op

30、eration provi des a nd the Division: #1 furnace debugging, and try shipped by #1 furna ce try shipped professional group requirements for, which single try turned a nd Divi sion try shipped by xD t hree company led is responsible for. all moving operation operation must be in strict accorda nce with

31、 the prior authorization of the #1 boiler commissioning professional working group, and after starting, the test command-approved #1 furnace steps in the test pogramme, event of temporary changes be re ported to hea dquarters approval. commissioning, trial operation process is required for each proj

32、ect by Northwestelectric power construction company ready equipment installation records, and fill in t he test application form, the a and b sides after passing the checks, fill in partial commissioning checking before a visa, reported head of the appr oval, carried out by the leader of unified com

33、mand. About each a ction are made by the leader of a unified command, operation after the report to the team leader. Without the Directors consent shall not unilaterally make any startup operation, such as single operations, who is responsible for all security responsi bilities, with no ties to the

34、other side. all before the first turn of the motor, must be approved by both parties a common roll insulation measurement can be carried out properly. After the end of each proje ct commissioning, fill in partial a cce ptance visa trial shipments. As motor in rotating equi pment commissioni ng test

35、switch and mechanical part of their trial cannot continuously, this i s consi dered two test project s shall be carried out according to the above four steps. 2.4, a nd attached work votes issued peopl e, and license people, and w ork head list: party electrical first species, and second species wor

36、k votes license people list: party engine work votes license people list: b electrical first species, and second spe cies work votes issue d peopl e: b hot control professional issued people list: b hot control professional work head: b steam machine pr ofessional work votes issued people: b steam m

37、achine professional work votes head: b boiler professional work votes issued people: b boiler professional work votes head: attached: about personnel of contact phone party b Division 3, boiler auxiliary equi pment debuggingscenarios 3.1, send, induced draft fan try turned 3.1.1, try turning the for

38、mer requirements of: 3.1.1.1, fan body and motor installed, based the second Grouting ends, and the concrete strength is up. 3.1.1.2, coupling the Centre has finishe d aligni ng standards, approved visa. 3.1.1.3, bearing clearance normal outer rims and bearing clearance i s up to standard. 3.1.1.4,

39、Benton3.3.3.5, measure the le ngth of insurance, a record, for when the next maintenance reference. 3.3.3.6, ready to install, try turning accepta nce visa records archive for safekeeping. 4, partial transfer test and commissioning programme that is dusting 4.1, try turning the former requirements o

40、f 4.1.1, import and export of dust flue is installed. 4.1.2, ESP acceptance visa framework, shell is installed. 4.1.3, outdoor rooftop installation finished weldi ng, do not leak. 4.1.4, platforms, stairs and railings are all installed. 4.1.5, cathode and anode is installe d, the same polar distance

41、 guarantees 400mm 5mm. And acceptance of visa. 4.1.6, ng Jizhen install, vibration reducer oil, oil level is clear and correct. Universal joint into the butter. 4.1.7, the cathode vibrating installation, initial running in off-axis installed, vi bration reducer oil, oil level is clear and correct. U

42、niversal joint into the butter. 4.1.8, air distribution, deflector installed, fixed by the prison. 4.1.9, entry boxes installed, external insulation vases clean, no defects such as cracks, porcelain, and pressure test. 4.1.10, cathode vibrating wall insulation casing and the insulation gland plate c

43、omplete gap correctly. 4.1.11, the town changes the tubing is installed, acce ss to the fuel tank. 4.1.12 ESP body lighting installed and put into use. 4.1.13, insulation work all over. 4.2, transfer and commissioni ng test 4.2.1, first start the ang for vibration motors to determine direction, turn

44、 correct try 2H. Green r un by Yng vibrating strike hammers, check crank should rotate, flip, flexible, and hitting the hip bar Center, gearbox functioning, no oil leakage, beari ng temperature does not exceed 80 c. Motor current does not excee d the rated current. 4.2.2, start the cathode vibrating

45、 confirm turn to determine turn to try to go after 2H. Try to go check the cathode when vibrating strike hammers should be flexible rotation, flippi ng, and hitting on the cathode framework, gearbox functioning, no oil leakage, bearing temperature does not exceed 80 c. Motor curre nt does not exceed

46、 the rated current. 4.2.3, try to go after passing t he yin a nd ang Jizhen hammer and yin and ang Jizhen and spooling of the fastening nut a nd then tighten it again after, nuts welded i n jail, remember! in the cathode spot welding nut should be built right on the ground to prevent large currents

47、through the cathode framework to the town town of rheological damage evolution. Welding finish must be removed after installation of ground, avoid short-circuit cause d by electric boost. 4.2.4, cathode and anode go after passi ng the test, will try the turning shaft dismantle cathode, put on the fo

48、rmal use of the ceramic shaft, after installation close the cathode vibrating ceramic shaft incubator people emen and locked. 4.2.5, check the electric field to be unmanned, hopper clean a nd free of debris, after confirming the above electric field two manholes and close d and locked the door. 4.2.

49、6 heater-cathode ceramic shaft, input insulated box and inlet box heater, initial heating time 12h. And set the heating temperature of the upper and lower limits. 4.2.7, after completion of the work, rheological empty town l, charge d empty after passing the rose field. (Air rise, live field testing

50、 1 千克=( )克 1平方米=( )平方分米1 平方分米 =( )平方厘米 1平方米=( )平方厘米1 平方千米 =( )平方米 1平方千米=( )公顷1 公顷=( )平方米 1小时=( )分 1分=( )秒巩固练习 : 3.001 吨=()吨()千克 3.7平方分米 =()平方毫米5.80 元=()元()角 ( )吨( )千克=4.08 吨5000千克=( )吨 ( )分米=1.5米510 米=( )千米 5米 16 厘米=( )米5千克 700克=( )千克 0.95米=( )厘米4700 米=( )千米 3650克=( )千克1.4 平方米 =( )分米 360平方米=( )公顷504

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 高考资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁