来料ROSH检测程序英文版.pdf

上传人:33****7 文档编号:31959543 上传时间:2022-08-08 格式:PDF 页数:1 大小:11.72KB
返回 下载 相关 举报
来料ROSH检测程序英文版.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

《来料ROSH检测程序英文版.pdf》由会员分享,可在线阅读,更多相关《来料ROSH检测程序英文版.pdf(1页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、Document Name ROHS & California Proposition 65 Control Procedure Page Code 1/1Version A/0 Document Code QA-LAB-002 Edited/Revised Date 2018.11.1 Issued Date 2018.11.1 If this procedure is printed, it is an UNCONTROLLED copy.1.Purpose: Ensure suppliers incoming materials are according with ROHS & Cal

2、ifornia Proposition 65 requirements. 2.Scope Incoming inspection for electronic, hardware and plastic products and so on. 3.ROHS material identification 3.1 All ROHS materials must be labeled by the supplier on each case. If no ROHS materials are labeled, IQC shall notify the Purchasing Department t

3、o penalize supplier. 4.Application process 4.1 IQC is responsible for completing the test application form before applying for ROHS & California Proposition 65 test. 4.2 Specify the name, model, material and supplier in the test application form. 4.3 After completing the test application form, the h

4、ead of the department can sign it to the laboratory to do XRF testing. 5. IQC ROHS & California Proposition 65 test sampling plan 5.1 Every PO of incoming materials must be sampled for XRF testing check. 6.Test 6.1 IQC needs to establish a general table to register the number of incoming materials a

5、nd the corresponding sampling plan according to PO situation (as above), including test requirements (the contact part requires Pb90 PPM, non-contact part requires Pb1000 PPM); 6.2 The laboratory testers numbered the received test samples, registered them, and test them as required. 7. Processing of

6、 test results 7.1 Laboratory testers record the test results in the test report and send the report to the application department. 7.2 If the material does not meet the requirements of ROHS & California Proposition 65, the following below shall be implemented :a) IQC notifications the warehouse, which will be returned to the supplier by the warehouse & Purchasing Departments. b) If necessary, re-evaluate the qualification of suppliers.

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 应用文书 > 工作总结

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁