《个人能力英文自我评价范文-英文简历自我评价范文.doc》由会员分享,可在线阅读,更多相关《个人能力英文自我评价范文-英文简历自我评价范文.doc(6页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、个人能力英文自我评价范文|英文简历自我评价范文个人的能力怎么样自己很清楚,但是要用英语说出来怎么做呢?下面是WTT为大家带来的范文,希望大家喜欢。个人能力英文自我评价篇一 In the past five months, under the leadership of the Department of Engineering Services, and colleagues through the mon struggle, after their own positive efforts to do the following work.one. Work attitude, ideolo
2、gical work. Work attitude, I love my job very much, to be strict with myself, to abide by the engineering department of the system, to maintain a responsible attitude to work, humility, learning, proactive, and constantly improve their technical level, and strive to lead the assignment of each task
3、Do the best. Guide the installation work.two. Guide the installation work. In Jinli permanent mag installation bat work, through the equipment of the pipeline interface, rectifier cabis and control cabi wiring wire-line installation, deepened my understanding of the equipment process and line power
4、supply and distribution. But also trained me to understand the electrical wiring schematic, the ability to connect pipe installation drawings. But also to learn the skills of cognitive equipment spare parts. Every step of the installation process is done carefully. Found that the installation of lye
5、 filter timely and correct installation. Although the smooth pletion of the guidance, but through the work found in the control cabi in the plc model configuration and accessories detailed name, the role of functional understanding is not deep enough. The future focus on some technical drawings, wor
6、king hours to the material security department cognitive accessories. Do not understand the issue of timely advice to colleagues and leaders. Equipment testing and debugging work.Third, equipment testing and debugging work. In the workshop on the Saudi equipment test debugging, power plant cndq-10 h
7、ydrogen production equipment boot sequence, pid parameter settings, have a certain understanding. But also on the working principle of rectification from shallow to deep understanding. Make sure the straight-through cylinder is before the test run90 degrees, tee 180 degrees. Through ball valve modul
8、ation off. Jordan's pneumatic film regulating valve should do its initial adjustment, debugging process, such as equipment can not reach the system pressure, the actual level does not match with the host puter, pump damage has occurred, should be based on the actual situation of correct investig
9、ation.Fourth, the future direction of work. Next month focused on the debugging phase of learning. Develop their own ability to find fault. The scene found the problem back to the leadership, more advice. In the future work to make up for deficiencies, work hard to do better.个人能力英文自我评价篇二 As a pany C
10、NC machine tool operator, the pany's quality policy, environmental policy, the following understanding: Quality is the life. First of all, in accordance with the safety equipment operating procedures correct operation of the equipment; to ensure safe operation of equipment under the premise of “
11、three good, four will”; Second, through learning, mastering and even proficient processing equipment range, ability to play equipment Performance, in accordance with the established processing technology (preparation of a reasonable processing), to meet the requirements of the drawings of parts, and
12、 inspection. The amount of consideration, mainly in the process of reasonable, auxiliary working hours, as well as personal familiar with the operation and develop good working habits. Such as the pany requires the placement management is very important. In short, the quality and quantity is the pan
13、y's quality policy to achieve the most basic guarantee, and quality of the various aspects of quality-related, is to contain the quality of corporate or corporate culture, quality means Seiko.个人能力英文自我评价篇三 To the unit has been working for three months, in the past three months, there are successf
14、ul, there are failures, there is joy, but also distressed in the leadership and care and guidance, with the support of my colleagues with the help of my work Capacity has been greatly improved, now 3 months of work to do a self-assessment.1, to further strengthen their understanding of their work, s
15、trict demands on their own safety first, prevention, prehensive management as their own.2, take the initiative to spare any opportunity to learn, the current strict can make their own work in the safety of production as the primary.3, always make their own sober mind, to deal with the work of the pr
16、oblem, can not solve the problem, in a timely manner and municate with their superiors in order to solve the current problem.4, careful and careful attention to their own all the time, the security awareness in their own hearts, always bear in mind the importance of safety, so that their progress.Th
17、ese are just a few achievements in my work, which is inseparable from the leadership of the unit and the help of my colleagues. I always firmly believe that the words “a match and then bright, and only a large light beans, but if a match to lit a pile of matches, it will be burning.” I hope to use my bright youth, to ignite the passion of everyone around, inspiring colleagues to work together for our cause dedication, progress, meritorious service, Jianye.个人能力和英文自我评价【全文END】第 6 页 共 6 页