《2022年最新改版人教版八年级上册物理知识点 2.pdf》由会员分享,可在线阅读,更多相关《2022年最新改版人教版八年级上册物理知识点 2.pdf(10页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、Yuan. Fourth section equipment management evaluation system of equipment management evaluation system the 49th article Dg20 valve is missing a wheel below 10 Yuan assessment task force people. Lack of pressure piping and pressure vessel every 10 Yuan assessment task force people. Pipe header lack of
2、 thermometers, pressure vessels and ot her equipment, each evaluation task force-man 10. Equi pment lubrication lack an oil Cup assessment task force 10. Equipment lack of lifting rings, 10 of every assessment task force. Each lacked a grounding of electrical equi pment line inspecti on task force p
3、eople 10. Connecting coupling 10 yuan per one guard che cking task force peopl e. Power box for each missing one handle 10 Yuan assessment task force people. Lighting box door cover is missing 10 Yuan assessment task force people. Distribution box (Cabinet) lack of direct light bulbs each evaluation
4、 task force 10. Damaged aluminum signs every 10 Yuan assessment task force people. Free signs every 10 Yuan assessment task force people, sign an unclear task force on assessment of people 10. Valves, instrument person with no signs each evaluation task force 10. Main steam, water, smoke, wind, gas
5、pipeline, pressure vessel, not according to the standard painting, numbering, labeling the device name and media trends, . Of the defect log book shall be kept properly, improper l ost each of the evaluation responsibility for 100 Yuan. Equipment defects, operators make records i n a timely manner a
6、nd notify maintenance personnel, general maintenance personnel do not process the run not to register each of the runs a nd overha ul the squad leader checking 50, eliminate less time or refuses to che ck and repair a monitor 50 defects. Rotating equipment mecha nical, thermal, electrical, oil leaka
7、ge oil ea ch evaluation task force 10. Leakage of pump packing, retaining ring displacement, damage, drainage holes clogge d bearings int o the water every 10 Yuan assessment task force people. Oil mirror, oil level gauge not see oil level every 10 Yuan assessment task force people. Equipment damage
8、 due to personal negligence, compensati on for the value of equipment 50%. Cracking because of bad freezing measures each valve, water pump (a) compensati on for the value of equipment 30%. Due to operator error or does not enforce strict fuel system and equipment repairman maintenance, improper com
9、missi oni ng equipment parts and damage, compensation for the value of 50%. Damage to equi pment should be pr omptly reported to the production technology section, undeclared assessment workshop Director 100 Yuan/times. After overhaul, the equipment shoul d be no grease, no corrosion, fouling and po
10、wder accumulation and debris-free, not up to the standard assessment charge 20 Yuan each. T he construction site should have sufficient lighting and necess ary security measures, prohi biting the jumbled mess of equipment and materials, repair and maintenance work after the finished work should be d
11、one before every heads of evaluation the net area is clean contrary to 50 Yuan. Due to maintena nce needs a temporary mount, cut off the stair railings, open cha nnel cover, should be promptly removed after completion and restoration of offender assessment charge20 Yuan. Related workshop in the 7th
12、month production technology section for maintenance scheduling, delayed assessment w orkshop Director of 50 Yuan a day. Units of the 25th of the month should be material spare parts, machining parts, new plans bi otech Division, day of delay deducted 10 Yuan. Related workshop at the 27th of the mont
13、h each month equipment rate tables, maintenance plan, along with the repair records, record che ck report, automatic device inputs, relay (thermal), protection of investment and the operation of equipment, each day of delay evaluation workshop Director 20 Yuan. Large and minor maintenance proje cts,
14、 the main parts of equipment replacement (includi ng the usual repla cement) must be incl ude d in file, repair does not fill within a week after delayed one day assessme nt task force 10. (Production technology section after each big, minor repairs to equipment file check) monthly preve ntative hea
15、lth checks a nd technology organization, w orkshop Director, regular health checks and technol ogy professionals usually do not make their own arrangements, also included in the assessment (notification form issued). Fails to participate in the examination, assessment of 50 Yuan, late examination 20
16、. Biote ch company, 30th totals monthly maintenance plan completion, e qui pment, equi pment inspection, test, and report to the Department of busi ness administration. Fifth section re ceiving equi pment and materials use r ule 50th expendable materials: 1, without planni ng or competent Vice Presi
17、dent signature, financial process, led by the payment pr ocessing fee. 2, maintenance . Material fee. 3, without a regular testing in biotech, identified in accordance with the scheme, and no maintenance projects or maintenance are not material loss paid by the material the material cost, Director o
18、f the task force on assessment of 100 Yuan. 4, repair work after the unused material into submission in a timely manner should be properly preserved, found in the field or on the flight, from the employer to pay the cost of materials (welders responsible for the electrode), and evaluation of 50 Yuan
19、. 5, materials and equipment for private use and fraud, found accountable, paid for by the responsible materials, equi pment, and Director of the task force on assessment of 50% performance -related pay. 6, approval to use high quality steel products instead of ordinary steel, offender assessment 50
20、 at a time, instead of 20, 45th for ordinary steel steam-pressure part and shaft each time che ck of 100 Yuan (constituted separately). 7, the material does not write specifications, models or wrong specification, do not write, at the material time, each examination 20. 8, plan no materials and Dire
21、ctor of the task force (or Director) 20 signatures each assessment. 9, attend monthly analysis of materials (Director, material part) late check 20 Yuan, lack of assessment 50 Yuan. 51st equipment and spare parts: 1, needed by the industry and trade compa ny to repurchase workshop materials, accesso
22、ries, equi pment, shop no, led by the workshop Director and approved the scheme awarded i n full. Workshop 2, requisitioning equi pment and accessorie s to strict quality control, and quality problems in usi ng the第一章机械运动一、长度和时间的测量1、测量某个物理量时用来进行比较的标准量叫做单位。为方便交流,国际计量组织制定了一套国际统一的单位,叫国际单位制(简称SI)。2、长度的单
23、位:在国际单位制中,长度的基本单位是米(m),其他单位有:千米(km)、分米(dm)、 厘米 (cm)、 毫米 (mm)、 微米 (m )、 纳米 (nm)。 1km=1 000m;1dm=0.1m;1cm=0.01m;1mm=0.001m;1 m=0.000 001m ;1nm=0.000 000 001m 。测量长度的常用工具:刻度尺。刻度尺的使用方法:注意刻度标尺的零刻度线、最小分度值和量程;测量时刻度尺的刻度线要紧贴被测物体,位置要放正,不得歪斜,零刻度线应对准所测物体的一端;读数时视线要垂直于尺面,并且对正观测点,不能仰视或者俯视。3、国际单位制中,时间的基本单位是秒(s)。时间的单
24、位还有小时(h)、分 (min)。1h=60min 1min=60s。4、测量值和真实值之间的差异叫做误差,我们不能消灭误差,但应尽量减小误差。误差的产生与测量仪器、测量方法、测量的人有关。减少误差方法:多次测量求平均值、选用精密测量工具、改进测量方法。误差与错误区别:误差不是错误,错误不该发生能够避免,误差永远存在不能避免。二、运动的描述1、运动是宇宙中最普遍的现象,物理学里把物体位置变化叫做机械运动。2、在研究物体的运动时,选作标准的物体叫做参照物。参照物的选择:任何物体都可做参照物,应根据需要选择合适的参照物(不能选被研究的物体作参照物)。研究地面上物体的运动情况时,通常选地面为参照物。
25、选择不同的参照物来观察同一个物体结论可能不同。同一个物体是运动还是静止取决于所选的参照物,这就是运动和静止的相对性。三、运动的快慢1、物体运动的快慢用速度表示。在相同时间内,物体经过的路程越长,它的速度就越快;物体经过相同的路程,所花的时间越短,速度越快。在匀速直线运动中,速度等于运动物体在单位时间内通过的路程。在物理学中,为了比较物体运动的快慢,采用“相同时间比较路程”的方法,也就是将物体运动的路程除以所用时间。这样,在比较不同运动物体的快慢时,可以保证时间相同。计算公式: v=st其中: s 路程 米(m);t 时间 秒(s);v 速度 米/秒(m/s) 国际单位制中,速度的单位是米每秒,
26、符号为m/s 或 m s-1,交通运输中常用千米每小时做速度的单位,符号为km/h 或 km h-1,1m/s=3.6km/h。v=st,变形可得:s=vt,t=sv。2、快慢不变,沿着直线的运动叫匀速直线运动。匀速直线运动是最简单的机械运动。运动速度变化的运动叫变速运动,变速运动的快慢用平均速度来表示,粗略研究时,也可用速度的公式来计算,平均速度=总路程 /总时间。四、测量平均速度1、停表的使用:第一次按下时,表针开始转动(启动 );第二次按下时,表针停止转动 (停止 );第三次按下时,表针弹回零点(回表 )。读数:表中小圆圈的数字单位为 min,大圆圈的数字单位为s。2、测量原理:平均速度
27、计算公式v=st精选学习资料 - - - - - - - - - 名师归纳总结 - - - - - - -第 1 页,共 10 页Yuan. Fourth section equipment management evaluation system of equipment management evaluation system the 49th article Dg20 valve is missing a wheel below 10 Yuan assessment task force people. Lack of pressure piping and pressure vesse
28、l every 10 Yuan assessment task force people. Pipe header lack of thermometers, pressure vessels and ot her equipment, each evaluation task force-man 10. Equi pment lubrication lack an oil Cup assessment task force 10. Equipment lack of lifting rings, 10 of every asse ssment task force. Each lacked
29、a grounding of electrical equi pment line inspecti on task force people 10. Connecting coupling 10 yuan per one guard che cking task force peopl e. Power box for each missing one handle 10 Yuan assessment task force people. Lighting box door cover is missing 10 Yuan assessment task force people. Dis
30、tribution box (Cabinet) lack of direct light bulbs each evaluation task force 10. Damaged aluminum signs every 10 Yuan assessment task force people. Free signs every 10 Yuan assessment task force people, sign an unclear task force on assessment of people 10. Valves, instrument person with no signs e
31、ach evaluation task force 10. Main steam, water, smoke, wind, gas pipeline, pressure vessel, not according to the standard painting, numbering, labeling the device name and media trends, . Of the defect log book shall be kept properly, improper l ost each of the evaluation responsibility for 100 Yua
32、n. Equipment defects, operators make records i n a timely manner and notify maintenance personnel, general maintenance personnel do not process the run not to register each of the runs a nd overha ul the squad leader checking 50, eliminate less time or refuses to che ck and repair a monitor 50 defec
33、ts. Rotating equipment mecha nical, thermal, electrical, oil leakage oil ea ch evaluation task force 10. Leakage of pump packing, retaining ring displacement, damage, drainage holes clogge d bearings int o the water every 10 Yuan assessment task force people. Oil mirror, oil level gauge not see oil
34、level every 10 Yuan assessment task force people. Equipment damage due to personal negligence, compensati on for the value of equipmnt 50%. Cracking because of bad freezing measures each valve, water pump (a) compensati on for the value of equipment 30%. Due to operator error or does not enforce str
35、ict fuel system and equipment repairman maintenance, improper commissi oni ng equipment parts and damage, compensation for the value of 50%. Damage to equi pment should be pr omptly reported to the production technology section, undeclared assessment workshop Director 100 Yuan/times. After overhaul,
36、 the equipment shoul d be no grease, no corrosion, fouling and powder accumulation and debris-free, not up to the standard assessment charge 20 Yuan each. T he construction site shoul d have sufficient lighting and necessary security measures, prohi biting the jum bled mess of equipment and material
37、s, repair and maintenance work after the finished work should be done before every heads of evaluation the net area is clean contrary to 50 Yuan. Due to maintena nce needs a temporary mount, cut off the stair railings, open cha nnel cover, should be promptly removed after completion and restoration
38、of offender assessment charge20 Yuan. Related workshop in the 7th month production technology section for maintenance scheduling, delayed assessment w orkshop Director of 50 Yuan a day. Units of the 25th of the month should be material spare parts, machining parts, new plans bi otech Division, day o
39、f delay deducted 10 Yuan. Related workshop at the 27th of the month each month equipment rate tables, maintenance plan, along with the repair records, record che ck report, automatic device inputs, relay (thermal), protection of investment and the operation of equipment, each day of delay evaluation
40、 workshop Director 20 Yuan. Large and minor maintenance proje cts, the main parts of equipment replacement (includi ng the usual repla cement) must be incl ude d in file, repair does not fill within a week after delayed one day assessme nt task force 10. (Production technology section after each big
41、, minor repairs to equipment file check) monthly preventative health che cks a nd technology organization, w orkshop Director, regular health checks and technol ogy professionals usually do not make their own arrangements, also included in the assessment (notification form issued). Fails to particip
42、ate in the examination, assessment of 50 Yuan, late examination 20. Biote ch company, 30th totals monthly maintenance plan completion, e qui pment, equi pment inspection, test, and report to the Department of busi ness administration. Fifth section re ceiving equi pment and materials use r ule 50th
43、expendable materials: 1, without planni ng or competent Vice President signature, financial process, led by the payment processing fee. 2, maintena nce . Material fee. 3, without a regular testing in biotech, identified in accordance with the scheme, and no maintenance projects or maintenance are no
44、t material loss paid by the material the material cost, Director of the task force on assessment of 100 Yuan. 4, repair work after the unused material into submission in a timely manner should be properly preserved, found in the field or on the flight, from the employer to pay the cost of materials
45、(welders responsible for the electrode), and evaluation of 50 Yuan. 5, materials and equipment for private use and fraud, found accountable, paid for by the responsible materials, equi pment, and Director of the task force on assessment of 50% performance -related pay. 6, approval to use high qualit
46、y steel products instead of ordinary steel, offender assessment 50 at a time, instead of 20, 45th for ordinary steel steam-pressure part and shaft each time che ck of 100 Yuan (constituted separately). 7, the material does not write specifications, models or wrong specification, do not write, at the
47、 material time, each examination 20. 8, plan no materials and Director of the task force (or Director) 20 signatures each assessment. 9, attend monthly analysis of materials (Director, material part) late check 20 Yuan, lack of assessment 50 Yuan. 51st equipment and spare parts: 1, needed by the ind
48、ustry and trade compa ny to repurchase workshop materials, accessories, equi pment, shop no, led by the workshop Director and approved the scheme awarded i n full. Workshop 2, requisitioning equi pment and accessorie s to strict quality control, and quality problems in usi ng the第二章声现象一、声音的产生与传播1、一切
49、发声的物体都在振动。用手按住发音的音叉,发音也停止,该现象说明振动停止发声也停止。振动的物体叫声源。人说话,唱歌靠声带的振动发声,婉转的鸟鸣靠鸣膜的振动发声,清脆的蟋蟀叫声靠翅膀摩擦的振动发声,其振动频率一定在20-20000 次/秒之间。2、声音的传播需要介质,真空不能传声。在空气中,声音以看不见的声波来传播,声波到达人耳,引起鼓膜振动,人就听到声音。气体、液体、固体都能发声,空气能传播声音。3、声音在介质中的传播速度简称声速。一般情况下,v固v液v气声音在 15空气中的传播速度是340m/s 合 1224km/h ,在真空中的传播速度为0m/s。4、回声是由于声音在传播过程中遇到障碍物被反
50、射回来而形成的。如果回声到达人耳比原声晚 0.1s以上人耳能把回声跟原声区分开来,此时障碍物到听者的距离至少为17m。利用:利用回声可以测定海底深度、冰山距离、敌方潜水艇的远近测量中要先知道声音在海水中的传播速度,测量方法是: 测出发出声音到受到反射回来的声音讯号的时间t,查出声音在介质中的传播速度v,则发声点距物体S=vt/2。二、声音的特性1、乐音是物体做规则振动时发出的声音。2、音调:人感觉到的声音的高低。用硬纸片在梳子齿上快划和慢划时可以发现:划的快音调高,用同样大的力拨动粗细不同的橡皮筋时可以发现:橡皮筋振动快发声音调高。综合两个实验现象你得到的共同结论是:音调跟发声体振动频率有关系