1、/- Building engineering biddingAbstract: Nowadays in the engineering construction industry, the market which is characteristic for project bidding, has formed. The construction companies,which want to create good benefits, have to control their cost and improve management to enhance the capacity of
2、adapting and competing in this market. This article focuses on how to decrease cost and increase income so as to control the construction cost effectively. bidding documents should be well formulated ,which is important to a successful bidding and direct influence the success or failure of the biddi
3、ng work.Because the success or failure of the bidding for the survival and development of enterprise has a direct impact, so we have a high quality, improve the bid documents of the unit, prevent invalid and successful pass mark appear, become a research topic.key : bidding drawbacks of unfair compe
4、tition countermeasuresBidding is a form of project transactions, project bidding process is to determine the successful bidder and the cost of the process and the price of the project, project bidding work of a very important link, do a good job bidding to determine the price, we can effectively con
5、trol construction costs, and create a fair and equitable market environment, create orderly competition mechanism. Bidding in construction activities, construction enterprises in order to tender invincible works to be successful, And from the contracted projects profitable, it needs to integrate var
6、ious subjective and objective conditions, the tender research strategy determine tender. Tender bidding strategy, including pricing strategies and skills. All of the strategies and skills from the numerous contractors bidding on the accumulated experience and objective understanding of the law and o
7、f the actual situation understanding, but also with the contractors decision-making ability and courage are closely related. Bidding documents is the general programme and play book of the bidding activity through the process of bidding. The bidding documents will specify that How to conduct each bi
8、dding work, how to dispatch bidding documents, the requirements for tenderer,how to rate and decide bidding and the procedures of bidding. Therefore, the personnel who is responsible for prepare bidding documents should first have a general view of the bidding work, include all the requirements and
9、arrangements into the bidding documents. If meet problems that have not been considered previously, then resolve them one by one during the preparation. The course of bidding documents preparation is also the course of making bidding scheme . In another respect, bidding documents is also the legal i
10、nstruments. Besides relevant law and rules, the bidding documents are the common game rules that bidder,bidding agent and tenderer should subject to through the bidding. Bidding documents are the legal instruments that all the three bidding related parties should subject to, have legal force, theref
11、ore, the bidding documents -making personnel required to have the awareness and quality of legal in order to reflect the fair, just and legal requirement in the bidding documents.In building engineering bidding law enforcement and the practice of project construction supervision system on standardiz
12、ing Chinas construction market, improve the construction quality and played an active role. But in the process of implementing exist some disadvantages, needs to perfect, enrich and improve. This project bidding documents in accordance with the bidding law of the Peoples Republic of China for bidder
13、s, bidding regulation, enterprise strictly, put forward to bidders professional requirements of project profile was illustrated.Nowadays in the engineering construction industry, the market which is characteristic for project bidding, has formed. The construction companies,which want to create good
14、benefits, have to control their cost and improve management to enhance the capacity of adapting and competing in this market. This article focuses on how to decrease cost and increase income so as to control the construction cost effectively. In building engineering bidding law enforcement and the p
15、ractice of project construction supervision system on standardizing Chinas construction market, improve the construction quality and played an active role. But in the process of implementing exist some disadvantages, needs to perfect, enrich and improve. This project bidding documents in accordance
16、with the bidding law of the Peoples Republic of China for bidders, bidding regulation, enterprise strictly, put forward to bidders professional requirements of project profile was illustrated.The practice of project bidding purpose is to market competition of openness, fairness and justice. However,
17、 due to the construction market development is not standard, management system and the experience of inadequate, architectural engineering bidding in concrete operation exist in ACTS of unfair competition, and some drawbacks. This obviously violate the bidding, the bidding process, and will lose its
18、 significance for other bidder fails to bid is unjust, disturbed the bidding (project contracting market economic order, for activities), this kind of behavior must be prohibited, only in this way can we make construction engineering competitive trading activity lawfully healthy. This subject will I
19、 learned and social practice, present situation and construction project bidding system is expounded, and the disadvantages of bidding for construction project with ACTS of unfair competition phenomenon and analysis of causes, and finally make corresponding preventive countermeasures.Construction co
20、st management system, both theoretical discussion, but also need to practice innovation. Under the conditions of market economy, project cost management, competitive and orderly market for construction management services platform structures. In such a premise, the original scale and method of valua
21、tion is inappropriate, and this needs to be reformed and improved. The spirit of the governments macro regulation and control, enterprise autonomy offer, the market will price principle, to implement the implementation specification bill of quantity. Inventory Valuation bidding activities are based
22、on market economy mechanism, based on legal, scientific, fair, open and reasonable way to determine the winning bidder of an economic activity. Bidding is bidding activities constitute two basic aspects. The bidding activity is merely that by bidding to choose the one with the work Construction proc
23、ess capability, moderate cost, quality is excellent, short duration of construction enterprises, and this is the ultimate goal tender. I have participated in internships over the course of the project bidding, and completed over part of the calculation of quantities, combined with graduate experienc
24、e in the design process, a brief analysis of the mode Quantities Call for TenderThe meaning of risk and risk characteristics of the general construction, the lowest price sealed bidding construction method produces several risks and incentives, according to their characteristics discussed the feasib
25、ility of risk control and prevention. Comparison of engineering and engineering security risk management, insurance, similarities and differences between the two projects and benefits; construction project bidding and tendering process characteristics of human behavior is analyzed to reveal the bidd
26、ers risk appetite and behavioral characteristics with changes in the external environment change, when the default punishment is light, the bidder preference appetite for risk and default penalties, with the increase exceeds a certain value, the risk of bidders to show preference for behavior change
27、 to avoid the risk of penalties, the greater the bidder biased in favor of a more risk-averse behavior, the results of the control and prevention of risk behavior of bidders has an important and practical significanceConstruction Cost Management from the quantity-one price plan model to price of sep
28、aration volume model of the market, and gradually establish a market price-based price formation mechanism, the price of the decision in the hands of the parties involved in the market, and ultimately the allocation of resources through the market in order to realize through the market mechanism to
29、decide on project cost. This will standardize the construction market-competitive behavior and the promotion of project bidding mechanisms play an important role in innovation. It can be said that the implementation of the project bill of quantities is a project cost management system in our country
30、 a big step forward, but also in Chinas accession to the WTO, the global construction industry a powerful tool for peer competition. With the construction of in-depth development of the market, the traditional fixed pricing model no longer suited to market-oriented economic development needs. In ord
31、er to adapt to the current project bidding by the market needs of a project cost, we must work on the existing valuation methods and pricing model for reform, the implementation of projects bill pricing. Engineering is a list of pricing model and adapt to the market economy, allowing independent con
32、tractor pricing through market competition determine prices, with the international practice of pricing model. With the bill pricing model projects to promote, in accordance with international bidding practices is imperative. Therefore, the lowest reasonable price of the successful bidder My future
33、is the most important evaluation methods. At this stage due to the implementation of projects bill pricing model and the problems mainly against China at this stage in the minimum reasonable price of the principles of the successful bidder, most contractors have not yet set up their own enterprises
34、of scale, companies unable to determine the reasonable Cost. This article is a scientific and fast set reasonable cost to study the key. First, from the project cost of the basic concept, of the engineering bill pricing model under the cost structure, to accurately predict costs of the project provi
35、ded the basis, considering the average cost of the social cost to individual enterprises and the tender stage of the cost estimates. Followed through on fuzzy math and technology for smooth in-depth analysis, through close-degree, the concept of reasonable fuzzy math and exponential smoothing techno
36、logies, construction of the project cost vague prediction model, and in accordance with the relevant information and statistics Information and experience to establish a framework structure, the comparison works Construction Cost Management from the quantity-one price plan model to price of separati
37、on volume model of the market, and gradually establish a market price-based price formation mechanism, the price of the decision in the hands of the parties involved in the market, and ultimately the allocation of resources through the market in order to realize through the market mechanism to decid
38、e on project cost. This will standardize the construction market-competitive behavior and the promotion of project bidding mechanisms play an important role in innovation. It can be said that the implementation of the project bill of quantities is a project cost management system in our country a bi
39、g step forward, but also in Chinas accession to the WTO, the global construction industry a powerful tool for peer competition. A healthy bidding system should be in accordance with the open, fair and justice and the principle of good faith, and establish a unified, open, competitive and orderly con
40、struction market. In view of the current problems existing in the bidding process, adopt regulations, and formulate and perfect the institution, strengthening process supervision measures, they can better regulate construction market order, prevent corruption from its source, purify construction mar
41、ket, promote the construction market order progressively toward standardization, institutionalized, and constantly improve the quality and level of the bidding work. 建筑项目招投标摘要:目前在工程建设项目行业中,以工程招投标为特征的建筑市场已经形成,施工企业为创造良好经济效益,必须严格控制成本,加强成本控制管理,才能提高市场适应能力和竞争力。本文从降低成本、增加收入两方面阐述对施工成本的有效控制。投标文件的编制是投标工作的一个重要
42、环节,直接影响投标工作的成败,投标的成败对企业的生存和发展有着直接的影响,因此要编制出高质量的投标文件,提高单位的中标率,防止无效标及废标出现。关键词: 招投标 不正当竞争 防范对策招标投标是一种工程交易形式,工程招投标的过程就是确定中标人和工程价格的过程,而工程价格的确定,是工程招投标工作中非常重要的一个环节,搞好招投标工程的价格确定工作,可以有效地控制工程造价,创造公平、公正的市场环境,营造有序竞争的机制。在建筑工程招标投标活动中,建筑施工企业要想在投标中立于不败之地,中标得到工程,然后又要从承包工程中赢利,就需要综合考虑各种主观条件与客观因素、研究投标策略,确定投标方法。投标策略包括投标
43、策略和作价技巧。所有的策略和技巧来自承包商的无数次投标的经验积累以及对客观规律的认识和对实际情况的了解,同时也与承包商的决策能力和魄力息息相关。从招标进程上讲,招标文件是招标活动的总纲和剧本。每项招标工作如何开始,如何发出招标文件,对投标人有什么要求,如何评标,如何决标,招标程序是什么,都在招标文件中做出规定,所以编制招标文件的人员首先要对本次招标工作有一个全局性的认识,把本次招标的要求和安排反映到招标文件当中,在编制当中也会遇到事先没有想到的问题,那就在编制当中逐一解决,编制招标文件的过程也是制定招标方案的过程。 从另一个意义上来讲,招标文件也是法律文件,除了相关的法律法规外,在招标的全过程
44、中招标人,投标人,招标代理机构共同遵循的游戏规则就是招标文件,这是参加招标工作三方人士必须遵循的法律文件,具有法律效力,所以编制招标文件的人员须有法律意识和素质,在招标文件中体现出公平、公正、合法的要求。我国建筑工程招投标法实施以及工程施工监理制度的实践,对规范我国建筑市场、提高建筑工程施工质量,起到了积极的作用。但是在实施过程中存在不少缺陷,需要完善、充实和提高。本工程招标文件根据中华人民共和国招投标法规定,对投标人,投标企业进行严格把关,对竞标者提出了专业性的要求,对工程的概况进行了说明。目前在工程建设项目行业中,以工程招投标为特征的建筑市场已经形成,施工企业为创造良好经济效益,必须严格控
45、制成本,加强成本控制管理,才能提高市场适应能力和竞争力。本文从降低成本、增加收入两方面阐述对施工成本的有效控制。我国建筑工程招投标法实施以及工程施工监理制度的实践,对规范我国建筑市场、提高建筑工程施工质量,起到了积极的作用。但是在实施过程中存在不少缺陷,需要完善、充实和提高。本工程招标文件根据中华人民共和国招投标法规定,对投标人,投标企业进行严格把关,对竞标者提出了专业性的要求,对工程的概况进行了说明。实行工程招投标的目的是为了市场竞争的公开、公平、公正。但是,由于建筑市场发育尚不规范,管理体制的束缚以及经验不足等原因,建筑工程招标投标在具体操作中还存在不正当竞争行为和一些弊端。这显然违背了招
46、投标的目的,整个招标投标过程也就失去了意义,对其他未中标的投标人来讲也是不公正的,扰乱了招投标(工程承发包市场)经济活动秩序,对于这类行为必须予以禁止,只有这样,才能使建设工程竞争性交易活动依法健康运行。因此本课题将结合本人所学及社会实践,对目前的建设工程招投标制度及现状进行阐述,并针对建设工程招投标存在的弊端与不正当竞争行为现象及产生原因进行分析,最后做出相应的防范对策研究。造价管理体系的建设,既包括理论上的探讨,又需要实践中的创新。市场经济条件下的工程造价管理,要为建筑市场有序竞争搭建管理服务平台。在这样一个大前提下,原有的定额和计价方法是不适应的,这就需要改革和完善。本着“政府宏观调控、
47、企业自主报价、市场形成价格”的原则,来推行实施工程量清单计价规范。清单计价模式下招投标活动是建立在市场经济运行机制下,依据法律程序,以科学、公正、公开合理的方法确定中标人的一种经济活动。招投标是构成招标投标活动中两个最基本的环节。而招投标活动,无非是想通过招标,选择一家具有工工程施工能力、造价适中、质量较优、工期较短的施工企业,这也是进行招标的最终目的。本人在实习过程中曾参与过多个项目的招投标工作,并完成过部分工程量清单的计算,结合毕业设计过程中的体会,简要分析一下工程量清单计价模式下的招投标工作。从风险的内涵和建设工程一般性风险特点出发,了建设工程最低价格密封招标法的几种风险及其产生的诱因,
48、根据其特性探讨了风险控制与防范的可行性。比较了工程担保与工程保险这两种工程风险管理异同与优点;并对建设工程招投标过程中的投标人的行为特征进行了分析,揭示投标人的风险偏好行为特征随着外部环境的改变而变化,当违约惩罚较轻时,投标人偏向于追求风险,而随着违约惩罚标准加大超过某一值后,投标人表现出的风险行为改变为偏向于规避风险,惩罚标准越大投标人行为偏向于更加规避风险,这一结果对控制和防范投标人的行为风险具有重要的与现实意义。工程造价管理由“量价合一”的计划模式向“量价分离”的市场模式转变,逐步建立市场形成价格为主的价格机制,把价格的决定权交给参与市场的各方,并最终通过市场来配置资源,从而真正实现通过
49、市场机制决定工程造价。这对规范建筑市场的竞争行为和促进工程招标投标机制的创新发挥重要作用。可以说,实行工程量清单计价是我国工程造价管理制度的一大进步,也是在我国加入WTO后,与全球建筑业同行竞争的有力工具。随着工程建筑市场的深入发展,传统的定额计价模式已不适应市场化经济发展的需要。为了适应目前工程招投标由市场形成工程造价的需要,必须对现行工程计价方法和计价模式进行改革,实行工程量清单计价。工程量清单计价模式是一种与市场经济相适应的、允许承包单位自主报价、通过市场竞争确定价格、与国际惯例接轨的计价模式。 随着工程量清单计价模式的推广,按国际惯例招标投标势在必行。因此“最低合理价中标”是我国今后最主要的评标办法。现阶段因实施工程量清单计价模式而出现的问题主要有,针对我国现阶段招标投标法中规定的最低合理价中标的原则,多数承包商尚未建立自己的企业定额,无法确定企业的合理成本。本文就是以科学、快捷的确定“合理成本价”为