1、Four short words sum up what has lifted most successful individuals above the crowd: a little bit more.-author-dateLOTO程序-中英Lockout/Tagout Procedure 3.0Revision NotesDateVersionRevision Author(s)Revision Notes11/25/072.0Edgar Santiagoq International versionTable of Contents1.0 Purpose and Scope目的/范围

2、2.0 Program Requirements程序要求2.1 LOTO Applicability适用范围2.2 Program Implementation 程序执行2.3 Training Authorized Employees 认证员工培训2.4 Energy Control Procedures动力开关控制2.5 Equipment Identification and Labeling设备检查和标示2.6 Isolating Devices and Tags2.7 Shift or Personnel Changes人员变动2.8 Contractor Requirements客

3、户要求3.0 Training培训4.0 Recordkeeping/Documentation文件档案管理5.0 References参考文件6.0 Definitions定义7.0 Attachments附件1.0 Purpose and Scope目的和范围1.1 Establish requirements for isolation of hazardous energy (LOTO). 1.2 The Lockout and Tagout Program applies to all RR Donnelley facilities and contractors.1.1确保能量隔离

4、装置的上锁和挂牌的基本要求1.2 上锁和挂牌程序适用于所有的当纳利员工和承建商。2.0 Program Requirements程序要求2.1 LOTO Applicability上锁挂牌的适用性Task IDAction Item / DescriptionReferenceHS260-2.1Ensure LOTO activities are performed as established in Attachment 1 (Flowchart) 确定上锁挂牌程序依照附件1实施(流程图)Company Requirement2.2 Program Implementation程序执行Tas

5、k IDAction Item / DescriptionReferenceHS260-2.2For new or relocated equipment, LOTO program applies immediately upon equipment installation. For existing equipment, use schedule as described in this section. 对于新的和重新放置的设备,设备安装时需要考虑上锁挂牌程序优先实施。对于现有设备列出计划表,根据程序要求逐一改进Company Requirement2.2.1 For existing

6、 equipment, implementation of tasks 2.4 2.6 should follow the itinerary as stated below (using number of existing production lines): 现有设备进行2.4-2.6作业时需要执行以下要求(现有生产线)2.2.1.1 Facilities with less than 20 production lines: implement within 2 years.2.2.1.2 Facilities with more than 20 production lines: i

7、mplement within 3 years.20条生产线以内:2年完成20条生产线以上:3年完成2.3 Authorized Employees 责任员工Task IDAction Item / Description行动条款ReferenceHS260-2.3Ensure that only Authorized personnel execute LOTO tasks and list their names in Attachment 2.确保只有认证的员工有资格进行上锁挂牌,且记录在附件2Company Requirement2.3.1 Only Authorized employ

8、ees may conduct LOTO只有经授权的员工可以LOTO2.3.2 Employees working on equipment that is under LOTO must attach their personal locks or tags, according to the Energy Control Procedure.2.3.3 Affected employees may not be near hazardous areas that are under LOTO.每个在上锁挂牌下进行作业的员工必须拥有自己的锁具、标识控制动力源受影响员工(普通员工)必须远离上锁

9、挂牌的危险区域2.4 Energy Control Procedures and Requirements能源控制程序和要求Task IDAction Item / DescriptionReferenceHS260-2.4Develop Energy Control Procedures (ECP) for all equipment requiring LOTO activity as shown in Attachment 3, and maintain a list of all ECPs.依照附件3为所有设备制定能源控制程序Company Requirement2.4.1 Ensur

10、e ECPs are updated when there is a change in equipment or process, and communicate changes to applicable employees.当设备或程序有改变时,需确保能源控制程序扩时更新,并跟需要的员工进行了沟通2.5 Equipment Identification & Labeling 设备鉴定和标识Task IDAction Item / DescriptionReferenceHS260-2.5Ensure equipment, energy sources and energy control

11、 procedures are uniquely labeled as shown in Attachment 4 or equivalent.保证设备、能源及能源控制程序使用附件4标签出来Company Requirement2.6 Isolating Devices & Tags Task IDAction Item / DescriptionReferenceHS260-2.6Provide Energy Isolation devices (locks or tags) to Authorized employees that meet the requirements of Atta

12、chment 5.依照附件4预备能源隔离装置,依照附件5要求进行Company Requirement2.6.1 Use a lock when equipment allows it (e.g., switch has perforation to accept a lock). 当设备允许时使用锁具2.6.2 Tagout devices are to be applied in the area where a Lockout Device would be applied and should provide an equivalent level of protection 锁具装置

13、必须装置合适的能达到效果的2.6.3 When using tagout, additional safety measures should be used, where feasible:2.6.3.1.1 Removal of an isolating circuit element.2.6.3.1.2 Blocking a controlling switch from inadvertent activation.2.6.3.1.3 Opening an extra disconnecting device (e.g., a switch in series)2.6.3.1.4 Re

14、moval of a valve handle在使用挂牌时附加安全要求2.6.3.1.1清除隔离电路元件。 2.6.3.1.2锁定开关2.6.3.1.3开放额外截断装置(例如,一个开关) 2.6.3.1.4清除控制阀门2.6.4 Ensure LOTO hardware required by ECPs is available to employees conducting LOTO, as shown in Attachment 6.确保能源控制程序中所需要的硬件设备可用到,依照附件62.7 Shift or Personnel Changes Task IDAction Item / D

15、escriptionReferenceHS260-2.7Ensure procedures are implemented for changes in personnel (shift changes, etc.).确保人员变动时程序同样被执行Company Requirement2.7.1 The arriving employee applies isolating device in the same location as the departing employee. The departing employee then removes his isolating device.

16、2.7.2 As verification, the arriving employee will perform the necessary steps of the ECP to ensure that all hazardous energy has been isolated. 下班的员工撤除自己的绝缘装置的同时,换岗员工挂上自己的能源装置作为查验,换岗员工需采取必要的步骤以确保所有的能源被隔离2.8 Contractor RequirementsTask IDAction Item / DescriptionReferenceHS260-2.8Ensure that contract

17、ors follow LOTO program and procedures确保供应商依照上锁挂牌程序操作Company Requirement2.8.1 Contractors shall be permitted to perform LOTO only if they have their own LOTO program and their employees are appropriately trained.2.8.2 RR Donnelley will not develop LOTO procedures for equipment that is operated, serv

18、iced, or maintained by contractors, only Contractors should perform this task. 2.8.3 If contractors are to perform LOTO activities along with RR Donnelley personnel (i.e. when working on the same machine), they must be informed of RR Donnelley procedures, if different from their own, prior to perfor

19、ming any lockout activities.2.8.1承包商仅仅在他们有自己的挂牌上锁程序和他们的员工得到必须的培训的基础上方才允许覆行挂牌上锁程序2.8.2当设备被供应商在操作、维修时,当纳利员工不允许执行挂牌上锁程序2.8.3在共同操作实行程序时,彼此间必须经过沟通,如果两者有差异,需从严执行3.0 Training Task IDAction Item / DescriptionReferenceHS260-3.1Ensure that all employees are trained according to the requirements outlined in At

20、tachment 7.确保员工依照附件7进行了培训Company Requirement4.0 Recordkeeping/Documentation记录保存Task IDAction Item / DescriptionReferenceHS260-4.1Ensure that recordkeeping/documentation is retained as required.Company Requirement4.1 Training records shall be maintained in accordance with the plants administrative pr

21、ocedures. (Retain records as defined by the RR Donnelley record retention policy.) 培训记录必须依照RRD管理程序要求进行记录保存5.0 References参考数目5.1 USA Code of Federal Regulations, Title 29, Part 1910.147, “The Control of Hazardous Energy (Lockout and Tagout)”5.2 USA Code of Federal Regulations, Title 29, Part 1910.301

22、-399, Subpart S, “Electrical”6.0 Definitions定义(理解不准确,请根据附件具体理解名词专业含义)Affected employee: An employee who works near equipment that is considered under LOTO, but does not participate in any LOTO activity. Authorized employee: An employee who performs lockout or tagout of machines or equipment to perfo

23、rm service or maintenance. Contractor: Service and maintenance contractors, construction contractors, salvage contractors, equipment vendors, and labor-only contractors.Energy Control Procedure (ECP): A step-by-step procedure outlining the process and requirements for the isolation of hazardous ener

24、gy sources and the process for using LOTO for a specific piece or group of equipment Energy-isolating device: A mechanical device that physically prevents the transmission or release of energy, including but not limited to a manually operated electrical circuit breaker, a disconnect switch, a line v

25、alve, a block, and any similar device used to block or isolate energy. Push buttons, selector switches, interlocks, and other control circuit-type devices are not energy-isolating devices.Energy source: Any source of electrical, mechanical, hydraulic, pneumatic, chemical, thermal, or other energy.Eq

26、uipment: All machines, facility equipment, and any equipment components.Exclusive Control The level of control over hazardous energy that is achieved by either of the following conditions: The energy control device is physically in the possession of the employee (within arms reach, or approximately

27、5 feet / 2m), and in line of sight of the employee, and/or A lock or tag is attached or hanging from energy control device Lockout: The placement of a lockout device on an energy-isolation/control device in accordance with established energy control procedures to ensure that the equipment being cont

28、rolled cannot be operated until the lockout device is removed.Lockout device: A device that utilizes a positive means such as a lock to hold an energy-isolating device in a safe position and prevent a machine or equipment from energizing. Production Line: Refers to equipment within the production pr

29、ocess that prints, binds, trims, collates, or otherwise prepares material for final shipment to the customer. This includes but is not limited to, press lines, binding lines, tipper lines, inserter lines, folder lines, etc. RR Donnelley personnel: The term includes all employees of RR Donnelley, inc

30、luding full-time employees (FTE), term (including co-ops/interns), and part time. It also includes Supplemental Labor, guests, and participating guests. (See “contractor.”)Single hazardous energy point: A specific procedure for a machine tool, or lockout and tagout of a piece of equipment with only

31、one energy-isolating device that can be readily identified and isolated. For some equipment with only one energy-isolating device, a detailed written lockout and tagout procedure is not required. Tagout: The placement of a tagout device on an energy-isolation/control device in accordance with an est

32、ablished Energy Control Procedure. This is used to indicate that the equipment being controlled cannot be operated until the tagout device is removed. 7.0 AttachmentsAttachment 1 LOTO Flowchart Applicability 流程图Attachment 2 Authorized Personnel List人员清单Attachment 3 Energy Control Procedures能源控制程序Att

33、achment 4 Equipment Labels 设备标识Attachment 5 Isolating Devices绝缘装置Attachment 6 Equipment Examples设备实例Attachment 7 Training Matrix培训Attachment 1LOTO FLOWCHART APPLICABILITY上锁挂牌流程图-适用性1. 动力开关是否有电动按钮或者能够快速拆除的装置?如果是:A) 员工的维修任务过程要有唯一的按钮或者断开开关,并且:B) 没有储藏和残余的能量(电容,气压等)必须进行LOTO不需要上锁挂牌是否拥有以下操作?A) 不同员工进行同一台机器的

34、操作B) 供应商C) 不同班次交替2.是否存在以下条件?A)所有暴漏在外的能源都被一个开关控制(比如紧急停止开关系统),B)每个员工都有单独的控制装置在整个任务过程中C) 设备的启动必须拥有多余一个步骤,类如机器不允许突然启动(紧急停止开关必须是其中的一个步骤)YESLOTO NOT REQUIRED3. Does operation require ANY of the following?a) Multiple employees performing different tasks simultaneouslyb) Contractorsc) Lasts more than one sh

35、ift? LOTO REQUIREDYES NONOYES2. Do all following conditions exist?NOIf YES:a) Employee(s) maintain exclusive control of plug/disconnect during duration of task, ANDb) No potential for stored or residual energy (capacitors, pressure from pneumatics, etc.)1. Is the power supplied by an electrical plug

36、 and/or pneumatic quick-disconnecting device?STARTa) All exposed hazardous energy is controlled by one device (e.g. Stop/Safe system), ANDb) Each employee maintains exclusive control of that device during duration of task, ANDc) Startup procedure requires more than one step, e.g., equipment can not

37、be started-up inadvertently (Stop-safe buttons are considered more than one step)Attachment 2Authorized Personnel List审核员工清单(See blank form attached at bottom)DepartmentEmployee NameEmployee IDAttachment 3附件3Energy Control Procedures Required Elements能源控制程序-所需的要素1. Exemptions NOT Requiring an ECP豁免-

38、不需要ECPa. Equipment where energy source is supplied by electrical cord or pneumatic disconnecting device, such as maintenance equipment (grinders), conveyors, stackers and strappers. 设备的能源来源,是由电线或气动截断装置提供,如维修设备(磨床) ,传送带,堆垛机和strappers 。b. If energy source is controlled by one device, e.g., a Stop-safe

39、 button, that can not be activated inadvertently (needs more than one step to activate) 如果能源被一个装置控制,例如,一个安全停止按钮,这是不能被无意中激活(需要一个以上的步骤激活)2. Purpose & Scope a. Include a statement similar to the following: “This Energy Control Procedure is to be used for the following ” (List Equipment covered by the p

40、rocedure.) 2 。目的与范围a. 包括一项声明类似如下的问题: 这股能量的控制程序是用于下列 (设备清单所涵盖的程序) 。3. Preparation for and completion of shutdown Authorized employee to:a. Notify all employees that equipment will be shutdown and locked out for maintenance. b. Review tasks to be conducted, type and magnitude of the energy present, th

41、e hazards of the energy to be controlled, and the method or means to control the energy. a. Provide specific steps necessary to shut down and turn on the equipment. 3 。为筹备和完成关机-授权雇员: a. 通知所有员工表示,设备将关机和锁定,以便进行维修。 b. 审评任务来进行,种类和幅度的能源,目前的危险能量,以得到控制,而且该方 法 、 或手段,以控制能源。c. 提供具体的必要步骤,关闭和开启设备。4. Stored ener

42、gy release and isolation These steps may be listed in the ECP:a. This section identifies the necessary steps and proper sequence necessary to isolate all potentially stored or residual energy. b. This section identifies the type and magnitude of the energy sources that exist on the equipment as well

43、 as devices required for energy isolation.c. If there is a possibility of re-accumulation of stored energy, list necessary verification of isolation steps to be continued until the servicing or maintenance is completed, or until the possibility of such accumulation no longer exists. 4 。储存的能量释放和孤立- 这

44、些步骤可能会列出在体外反搏: a. 本节确定必要的步骤和正确的序列,要隔离所有可能存放或剩余动力。 b. 本节确定的种类和幅度的能源来源,即存在于设备,以及设备所需能源的孤立。 c. 如果有可能重新积累储存能量,可列出必要的核实隔离措施,将一直持续到了保养 或维修工作完成后,或直至出现这种积累不再存在。5. Verification of isolation - a. Prior to starting work on a machine/equipment that has been LOTO, the authorized employee shall verify that isolat

45、ion of the equipment has been accomplished. This section should contain guidance on how an employee should complete the verification of energy isolation and that they should TURN EQUIPMENT OFF AFTER VERIFICATION. 5. 核查的隔离- a. 之前开始工作,就一台机器/设备已狂飙一下,得到授权的员工应核实孤立的设备已 经完成。这一节应该载指导如何雇员应完成核查能源隔离,并表示,他们要把装备

46、起飞后核实。6. Release from lockout or tagout - Identify all steps necessary to place the equipment back into service. These steps should include:a. Inspect the work area to ensure that nonessential items have been removed and to ensure that machine or equipment components and guards are operationally intact.b. Verify all employees are safe from areas that become operational at start-up. c. Verify that the controls of the equipment are still shut off and complete lock out removal. d. Notify Authorized and