《临建混凝土试块台账.xlsx》由会员分享,可在线阅读,更多相关《临建混凝土试块台账.xlsx(5页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。
1、序号施工日期强度等级部位12017/7/14C20垃圾池垫层22017/7/15C30制梁台座32017/7/15C20梁场区找平42017/7/16C20梁场区找平52017/7/17C302#龙门吊轨道62017/7/18C20料仓后集水井基础72017/7/19C20基料库旁地坪施工82017/7/19C302#龙门吊轨道92017/7/21C20泵房旁休息室地坪102017/8/4C30制梁台座基础112017/8/6C30制梁台座基础122017/8/7C30制梁台座基础132017/8/7C20梁场地坪142017/8/8C30制梁台座基础152017/8/8C20梁场地坪硬化16
2、2017/8/12C20梁场地坪硬化172017/8/12C30制梁台座基础5-4182017/8/12C30制梁台座基础5-2192017/8/13C30制梁台座基础6-5202017/8/13C20梁场地坪硬化212017/8/18C30地磅斜坡返修222017/8/17C30停车场车棚立柱基础232017/8/18M7.5水沟抹面242017/8/19C30台座基础3-2252017/8/19C30台座基础3-1262017/8/22C30扩基础6-1 6-4272017/8/22C30制梁台座基础5-3282017/8/22C30台座基础3-4292017/8/24C30台座基础3-5
3、302017/8/25C20场平4-1、4-5312017/8/25C20临建雨水井322017/8/26C20临建雨水井332017/8/26C205-1场坪342017/8/26C205-5场坪352017/8/26C20临建雨水井362017/8/27C30基础6-3372017/8/27C20场平4-2、4-4382017/8/28C25临建雨水井392017/8/29C30台座3-3402017/8/29C25临建雨水井412017/8/29C20场平5-2、5-4422017/8/29C30基础6-2432017/8/29C25临建雨水井442017/8/29C20梁场水沟垫层45
4、2017/8/29C20梁场水沟垫层(2号线)462017/8/30C30临建雨水井472017/8/30C30排水管稳固及检查井(1号线)482017/8/31C20场平4-3492017/8/31C30大板路南通预制井502017/8/31C30存梁区基础512017/8/31C20场平5-3522017/9/1C20场平5区运输通道532017/9/1C20场平4区运输通道542017/9/1C20大板路南通预制井场平552017/9/1C30铁管包封562017/9/1C302#铁管包封572017/9/2C30大板路南通预制井582017/9/2C302号井及井旁路面592017/9
5、/2C15大板路南通预制井场平602017/9/5C20场平6-1612017/9/5C30存梁区基础 (四)622017/9/5C20场平6-5632017/9/4C30存梁区基础 (二)642017/9/4C30台座4-1652017/9/4C30大板路南通预制井662017/9/5C15大板路南通井室垫层672017/9/5C30大板路南通预制井682017/9/5C30存梁区基础 (九)692017/9/5C30大板路南通预制井702017/9/6C30存梁区基础 (十)712017/9/6C30台座4-2722017/9/6C30大板路南通预制井732017/9/6C30存梁区基础
6、(五)742017/9/7C30存梁区基础 (八)752017/9/7C30大板路南通预制井762017/9/7C30大板路南通预制井772017/9/7C30存梁区基础 (七)782017/9/7C30台座4-5792017/9/7C15大板路南通井室垫层802017/9/7C20场平6-2812017/9/7C20场平6-3822017/9/8C20场平6-4832017/9/8C30存梁区基础 (3)842017/9/8C30台座4-4852017/9/8C30大板路南通预制井862017/9/8C30大板路南通预制井872017/9/10C30台座5-1882017/9/10M7.5水
7、沟抹面892017/9/9C30大板路南通预制井902017/9/9C30存梁区基础 (6)912017/9/9C20场平6区运输通道922017/9/9C30大板路南通预制井932017/9/9C30存梁区基础 (11)942017/9/9C30台座4-3952017/9/11C30台座5-2962017/9/11C25大板路南通预制井972017/9/11M7.5水沟抹面982017/9/13C30台座5-4992017/9/12C30存梁区运输通道1002017/9/14C30台座5-51012017/9/15C30存梁区枕梁11022017/9/15C30台座5-31032017/9/
8、16C30台座6-11042017/9/16C30存梁区枕梁21052017/9/16C20存梁区场平硬化1062017/9/17C25预制井1072017/9/17C20存梁区场平硬化1082017/9/17C20存梁区1、场平右侧11092017/9/17C20存梁区1、场平右侧21102017/9/17C30存梁区枕梁31112017/9/18C20存梁区左侧场平硬化1122017/9/18C30存梁区枕梁41132017/9/18C20存梁区1场平硬化1142017/9/17C25预制井1152017/9/17C20枕梁1、2间场平硬化1162017/9/18C30台座6-21172017/9/19C30台座6-51182017/9/19C20存梁区1、2间场平硬化1192017/9/19C30存梁区枕梁51202017/9/19C25预制井1212017/9/19C25预制井1222017/9/20C25预制井盖板1232017/9/20C30存梁区枕梁61242017/9/20C30台座6-41252017/9/21C30台座6-31262017/9/21C25预制井1272017/9/21C30存梁区枕梁7128合计254组,其中管道36组