GB50210-2001建筑装饰装修工程质量验收规范.doc

上传人:豆**** 文档编号:17403609 上传时间:2022-05-23 格式:DOC 页数:87 大小:952KB
返回 下载 相关 举报
GB50210-2001建筑装饰装修工程质量验收规范.doc_第1页
第1页 / 共87页
GB50210-2001建筑装饰装修工程质量验收规范.doc_第2页
第2页 / 共87页
点击查看更多>>
资源描述

《GB50210-2001建筑装饰装修工程质量验收规范.doc》由会员分享,可在线阅读,更多相关《GB50210-2001建筑装饰装修工程质量验收规范.doc(87页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流GB50210-2001建筑装饰装修工程质量验收规范GB中华人民共和国国家标准National Standard of the Peoples Republic of ChinaGB 502102001建筑装饰装修工程质量验收规范Code for construction quality acceptance of building decorationIssued on:2001-11-01Implemented as of:2002-03-01Jointly issued byMinistry of Construction of the

2、 Peoples Republic of ChinaState Quality Supervision Inspection Quarantine General OfficeCode for construction quality acceptance of building decorationNotification on issuing national standard“Code for construction quality acceptance of building decoration”Based on the requirements of “Notification

3、on printing and distributing the plan for the formulation and revision of national engineering construction standards (the 2nd lot) in 1998” (Construction standard 1998No. 244) issued by the Construction Bureau, and through the joint checkup of Construction Bureau and relevant departments, the “Code

4、 for construction quality acceptance of building decoration”, which was revised by Construction Bureau together with relevant departments, was approved as a national standard with the number of GB50210-2001. This standard would be effective from March 1st, 2002. Among the standard, the items 3.1.1,

5、3.1.5, 3.2.3, 3.2.9, 3.3.4, 3.3.5, 4.1.12, 5.1.11, 6.1.12, 8.2.4, 8.3.4, 9.1.8, 9.1.13, 9.1.14 and 12.5.6 are mandatory, and must be observed strictly. At the same time, the original “Code for construction and acceptance of decoration engineering”(GBJ 210-83), “Code for construction and acceptance o

6、f building decoration” (JGJ 73-91), as well as Chapter 10 and 11 of “Evaluation standard for quality inspection of building engineering” (GBJ 301-88) would be repealed.The Construction Bureau would be responsible for the management of this standard, China Building Scientific Research Institute respo

7、nsible for the detailed interpretation, and Construction Bureau Standard Rating Research Institute for organizing China Building Industry Press to publish and issue.Construction Bureau, the Peoples Republic of ChinaNovember, 1st, 2001Foreword This standard was established through the revision of “Co

8、de for construction and acceptance of building decoration” (JGJ 73-91) and “Evaluation standard for quality inspection of building engineering” (GBJ 301-88) by China Building Scientific Research Institute together with relevant departments, based on the requirements of “Notification on printing and

9、distributing the plan for the formulation and revision of national engineering construction standards (the 2nd lot) in 1998” (Construction standard 1998No. 244) issued by the Construction BureauIn the process of revision, the code compilation team carried out a monographic study; conducted a broad i

10、nvestigation; sum up the experience in design, material, construction and other aspects of building decoration in many years; and made an overall revision based on the policy of “separating acceptance and evaluation, strengthening acceptance, perfecting way and means; as well as controlling the proc

11、ess”. In addition, they asked for the comments of relevant units in the whole country by various means, revised time and again for main issues; and finalized the contents after reviewing.This code is the quality acceptance specification for defining if a decoration work can be put into service. The

12、building decoration work is divided into 10 sub-works according to the construction process and decoration position. Except the sub-work of ground that will be printed independently, the quality acceptance for all other 9 sub-works is stipulated in this code.This code has 13 chapters. The first 3 ch

13、apters are General, Nomenclature and General Stipulations. Chapters 412 are quality acceptance for sub-works. In chapters 412, the first section is the general stipulations; and other sections are quality acceptance for each sub-work. Chapter 13 is the quality acceptance for sub-works.In the future,

14、 it may be necessary to make partial revision for this code. The information and item contents about partial revision would be published on the magazine “Engineering Construction Standardization”.In this code, those items marked in boldface are mandatory and must be observed strictly.To improve the

15、code quality, please pay attention to summarize experiences and accumulate information during the execution of this code, and feedback at any time the relevant comments to China Building Scientific Research Institute (Address: 30 Beisanhuandonglu, Beijing, Zip code: 100013), for reference in future

16、revision.Main compiling units, participating units and main draftsmen of this code:Main compiling unit: China Building Scientific Research InstituteParticipating units:Beijing Construction Quality Supervision StationChina 1st Construction Bureau Decoration CompanyShenzhen Construction Quality Superv

17、ision and Inspection StationShanghai Huili (Group) CorporationShenzhen Keyuan Building Decoration Co., Ltd.Beijing Jianyu Building Engineering Co., Ltd.Main draftsmen:Meng Xiaoping Hou Maosheng Zhang Yuanbo XiongweiLi Aixing Gong Wansheng Li Zixin Wu HongkangZhuang Kezhang Zhang MingContentsChapter

18、1 GeneralChapter 2 NomenclatureChapter 3 General stipulations3.1 Design3.2 Material3.3 ConstructionChapter 4 Plaster work4.1 General stipulations4.2 Normal plaster work4.3 Decorative plaster work4.4 Mortar-calked joint workChapter 5 Door and window work5.1 General stipulations5.2 Fabrication and ere

19、ction of wooden doors and windows5.3 Erection of metal doors and windows5.4 Erection of plastic doors and windows5.5 Erection of special doors5.6 Erection of glasses for doors and windowsChapter 6 Suspended ceiling work6.1 General stipulations6.2 Covert suspended ceiling work6.3 Overt suspended ceil

20、ing workChapter 7 Light partition work7.1 General stipulations7.2 Plate partition work7.3 Frame partition work7.4 Moveable partition work7.5 Glass partition workChapter 8 Engineering of Facing Plate (Tile)8.1 General provisions8.2 Installation Engineering of Facing Plates8.3 Affixation Engineering o

21、f Facing TileChapter 9 Engineering of Curtain Wall9.1 General provisions9.2 Engineering of Glass Curtain Wall9.3 Engineering of Metal Curtain Wall9.4 Engineering of Rock Curtain WallChapter 10 Coating work10.1 General provisions10.2 Coating Engineering of Water Paint10.3 Coating Engineering of Solve

22、nt Paint10.4 Fine Arts Coating EngineeringChapter 11 Engineering of Paperhanging and Soft Package11.1 General provisions11.2 Engineering of Paperhanging11.3 Engineering of Soft PackageChapter 12 Engineering of Details12.1 General provisions12.2 Fabrication and Installation of Cabinet12.3 Fabrication

23、 and Installation of Pelmet, Elbowboard and Radiator box12.4 Fabrication and Installation of Door Window Cover12.5 Fabrication and Installation of Guardrail and Handrail12.6 Fabrication and Installation of CurlicueChapter 13 Quality Check and Acceptance of Division EngineeringAppendix AQuality requi

24、rement of wood used for wood door windowAppendix BDistribution of sub-division engineering and its subprojectsAppendix CRecord sheet for the examining and receiving of concealed workExplanation of wording in this Code Chapter 1 General1.0.1 The Code is formulated to strengthen the quality management

25、 of building engineering, unify the quality acceptance of building decoration, and ensure the project quality.1.0.2 This Code is applicable to the quality acceptance for the decoration of the buildings, which are newly built, expanded, rebuilt or existed.1.0.3 The quality acceptance requirements, wh

26、ich are stipulated in the contract, design documents and other technical documents for building decoration, can not be lower than the stipulation of this Code.1.0.4 This Code should be used together with the national standard “Unified standard for the quality acceptance of building construction”(GB5

27、0300-2001).1.0.5 In addition to this Code, the quality acceptance for building decoration should also conform to the stipulations of relevant current national standards.Chapter 2 Nomenclature2.0.1 Building decorationVarious treating processes to inner and outer surface as well as inter-space of buil

28、dings by using decoration materials or matters, so as to protect main structure, perfect usage function, and beautify buildings.2.0.2 Primary structureMain structure or protecting structure of buildings.2.0.3 Base courseThe surface course receiving decoration directly.2.0.4 DetailComponents or decor

29、ation matters used partially in building decoration.Chapter 3 General Stipulations3.1 Design3.1.1 Conduct design for building decoration, and issue complete construction drawings and design documents.3.1.2 The company undertaking the design for building decoration should have corresponding qualifica

30、tions and should establish quality management system. The quality problems due to design should be the responsibility of design company.3.1.3 The design for building decoration should conform to the relevant stipulations for city planning, firefighting, environmental protection and energy saving.3.1

31、.4 The company undertaking the design for building decoration should conduct necessary investigation and site survey to the building. The design depth should satisfy construction requirements.3.1.5 The design for building decoration must ensure safe structure and main usage function of buildings. Wh

32、en the design involves the modification of main body and weight bearing structure or the increment of duty, the original design company or a design company with corresponding qualification must check relevant original information; conduct verification and confirmation for the safety of existing buil

33、ding structure.3.1.6 The firefighting, lightning protection and anti seismic design for building decoration should conform to the current national standards.3.1.7 Conduct anti-freezing or anti-condensation design when freezing or condensation may occur in the pipelines inside the wall or suspended c

34、eiling.3.2 Material3.2.1 The category, specification and quality of materials used in building decoration should conform to design requirements and stipulations of current national standards. When there is no requirement in design, the material should conform to the stipulations of current national

35、standards. It is strictly forbidden to use those materials, which are rejected by national public proclamation.3.2.2 The combustion property of those materials used in building decoration should conform to the stipulations in current national standards “Code for firefighting design of building inter

36、nal decoration” (GB 50222), “Code for firefighting design of buildings” (GBJ 16), and “Code for firefighting design of high-rise residential buildings” (GB 50045).3.2.3 The materials used in building decoration should conform to those national standards relevant to the limitation of detrimental subs

37、tance in building decoration materials.3.2.4 Check material category, specification, appearance and dimension when the materials are delivered to site. The material package should be intact. The materials should have mill certificate, instruction manual in Chinese, as well as test report for relevan

38、t performance. For imported products, conduct commodity inspection according to relevant stipulations.3.2.5 For those materials necessary to be rechecked after being delivered to site, the type and items should conform to the stipulations in each chapter of this code. For the materials delivered to

39、site with same category, same category, and produced by same manufacturer, take at least one group of samples to recheck. When otherwise specified in the Contract, execute according to the Contract.3.2.6 When there is national stipulation or contractual agreement that witness inspection must be cond

40、ucted for materials, or there is a controversy over the material quality, the witness inspection should be conducted.3.2.7 The company undertaking the inspection and test for building decoration materials should have corresponding qualification, and should establish quality management system.3.2.8 F

41、or the materials being used in building decoration, effective measures must be taken during transportation, storage and construction, to prevent damage, deterioration and environmental pollution.3.2.9 For the materials being used in building decoration, conduct fireproof, antisepsis and vermin-proof

42、 treatment according to design requirements.3.2.10 For those materials prepared at site, such as mortar and adhesive, prepare according to design requirements or product instruction manual.3.3 Construction3.3.1 The company undertaking the construction of building decoration should have corresponding

43、 qualification, and should establish quality management system. The construction company should compile construction organization design, and go through review and approval. The construction company should conduct construction according to relevant construction engineering standards or approved cons

44、truction plan, and apply quality control for the whole construction process.3.3.2 The personnel undertaking the construction of building decoration should have corresponding qualification.3.3.3 The construction quality of building decoration should conform to design requirements and stipulations of

45、this code. The quality problems due to the violation of design documents and this code should be the responsibility of construction company.3.3.4 During the construction of building decoration, it is strictly forbidden to violate the design documents, and change without authorization the main body,

46、weight bearing structure or main usage function of buildings. It is strictly forbidden to dismantle or change the water, heating, electric, fuel gas, communication and other associated facilities without design confirmation and authorization of relevant departments.3.3.5 The construction company sho

47、uld observe the laws and regulations on environmental protection, and take effective measures to control the pollution and hazard to surrounding environment caused by site dust, off gas, wastes, noise, vibration, etc.3.3.6 The construction company should observe the laws and regulations on construct

48、ion safety, labor protection, fireproof and gasproof; establish corresponding management regulations, as well as provide necessary equipment, apparatus and identification marks.3.3.7 The construction for building decoration should be started after the quality acceptance of basal body or basal layer. Before the decoration for existing buildings, conduct treatment for basal layer and make it reach the requirement of this Code.3.3.8 Before the construction of building decoration, prepare masterpiece or maste

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 小学资料

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁