1、【精品文档】如有侵权,请联系网站删除,仅供学习与交流u现浇重力式钢筋混凝土挡土墙.精品文档.现浇重力式钢筋混凝土挡土墙Cast in place gravity reinforced concrete retaining wallConstruction technology standards (VIII, 124)1 scope of applicationThis standard is applicable to the construction of cast in place reinforced concrete retaining wall for highway, urban

2、 road and bridge.2 construction preparation2.1 materials2.1.1 cement: generally use Portland cement, ordinary portland cement, slag Portland cement. Cement approach should have product certification and inspection report, deal with the strength, stability and other performance indicators after enter

3、ing the necessary sampling reexamination, the quality must be consistent with current national standards Portland cement and ordinary portland cement GB175. When there is any doubt about the quality of the cement or the cement is out of production for more than three months, the re examination must

4、be conducted before use and the result shall be used as a result of the retest. Different kinds of cement shall not be used in combination.2.1.2 sand: generally use medium and coarse sand. Sand varieties, quality should be consistent with current national standard technical specification for constru

5、ction of highway bridges and culverts JTJ041, after entering the country in accordance with the provisions of the current standard test methods of aggregate for Highway Engineering JTJ058 sampling test.2.1.3: we should use the hard stone or pebble gravel, should according to the different situations

6、 of origin, category, processing methods and specifications, in accordance with the provisions of the current national standard test methods of aggregate for Highway Engineering JTJ058 batch inspection, the quality should be consistent with current national standard highway bridge culvert constructi

7、on technology standard JGJ63 regulations.2.1.4 water: suitable for drinking water. When using other water sources, the water quality should be in line with the current national standard water standard for concrete mixing, JGJ63.2.1.5 steel: steel shall have quality certificate and test report form;

8、variety, level, specifications of steel bars should comply with the design requirements; the reinforced approach should be selected to do sample test of mechanical properties, the quality must be consistent with existing national standards, the reinforcement of concrete hot rolled round bar GB13013,

9、 the reinforcement of concrete hot rolled ribbed bar GB1499 and GB13788 cold rolled ribbed steel bars and other provisions.Chemical analysis or other special tests shall be carried out when the steel bars are found to be brittle, poor in weldability or mechanical properties are abnormal.2.1.6 weldin

10、g electrode: the selected electrode should be matched with the reinforced base material, and the approach should have a certificate.2.1.7 admixture: additives should be product manuals, factory inspection reports and certificate of quality, performance testing report, the content of harmful substanc

11、es should be tested by the corresponding level of testing issued by the testing department. Approach shall be re examined by sampling, and the suitability of admixture and cement shall be checked. The quality and application technology of the admixture shall be in line with the current national stan

12、dard concrete admixture, GB8076 and regulations on the application of concrete admixtures, GB50119.2.1.8 admixture: the admixture shall have the factory certificate or quality certificate and the quality inspection report provided by the statutory inspection unit, and shall be re examined after the

13、approach. The quality of the admixture shall be in accordance with the current relevant standards of the state, and the amount of admixture shall be determined by experiment.2.1.9 embedded parts specification and material shall comply with the design requirements.2.2 implements and equipment2.2.1 ma

14、chinery: concrete mixer, concrete pump (pump by using), concrete mixer truck, hoisting machine, cutting machine, bending machine, welding machine, crane, dump trucks, scales, mobile generator.2.2.2 tools: steel plate, trolley, scraper, level, foot, shovel, vibrator and so on.2.3 operating conditions

15、2.3.1 the main structure of the bridge is completed or the elevation of the subgrade is higher than the elevation of the foundation of the retaining wall, and the compactness can meet the design requirements before construction can be carried out.2.3.2 base acceptance and complete the hidden inspect

16、ion procedures.2.4 technical preparation2.4.1 the road and bridge design drawings shall be checked before construction, and the surveying personnel shall calculate the retaining wall plane and Gao Cheng control survey and construction survey according to the construction line and the Gao Cheng contr

17、ol point of the road, the bridge construction line and the control point.2.4.2 complete breakdown of commencement report, concrete test, material inspection and examination and approval procedures and requirements of the owners, supervision of technical documents.2.4.3 preparation of concrete retain

18、ing wall construction program has been approved, and related personnel safety technical disclosure.3 operation process3.1 processMeasurement line? Cushion construction production and installation of reinforced foundation? a foundation template pouring concrete foundation? production and installation

19、 of reinforced wall and embedded parts? Supported wall template? Pouring concrete wall and health?3.2 operation method3.2.1 measuring and laying out: according to construction drawings and coordinate points, release the retaining wall center line, the basic plane position line and vertical height li

20、ne, and do the plane and elevation control points.Construction of 3.2.2 cushionThe strength of the 3.2.2.1 cushion concrete shall comply with the design requirements.When the bottom of the 3.2.2.2 cushion is not at the same elevation, the construction shall be carried out in accordance with the firs

21、t deep and the shallow order.After the completion of the construction of 3.2.2.3 cushion, the design elevation shall be checked, and the axis of the wall, the dimension dimension line and the reinforcing bar control line shall be ejected according to the design drawings and the middle line of the re

22、taining wall.Fabrication and installation of 3.2.3 base reinforcement3.2.3.1 shall be subject to re examination, verification, sampling and inspection of the steel in accordance with the relevant provisions, and may be used after qualification.3.2.3.2 reinforcement shall be stored according to varie

23、ty specification, batch number and classification, and shall not be mixed. There are serious corrosion, hemp pit, split, sand, interlayer, oil and other reinforcement may not be used.3.2.3.3 the reinforcement should be cleaned before binding, and the main ribs and the spacing of the tendons should b

24、e drawn with chalk on the cushion. According to the first row spacing, placed reinforcement, reinforcement distribution. Embedded parts and preformed hole should be combined with the installation etc.3.2.3.4 binding steel bar usually with the buckle or eight button, except for the outer two tendons

25、intersection point should be all tied outside, and the other points can be staggered binding.3.2.3.5 in the steel and template pad cushion block, spacing is not greater than 1.5m, the protective layer thickness should comply with the design requirements.The 3.2.3.6 cushion block is usually made of c

26、ement mortar, and the thickness of the cushion block should be the same as the thickness of the protective layer. The embedded fire wire is embedded in the cushion block or the plastic card is used to guarantee the thickness of the protective layer.3.2.3.7 steel connections shall be welded or mechan

27、ically connected.3.2.3.8 in binding double layer steel wire mesh, should set enough strength of support feet, in order to ensure the accurate positioning of steel mesh. Stable and firm, not loose or deformed when pouring concrete.3.2.3.9 molding steel welding, no rust, grease before welding; weld sh

28、all not undercut, crack, slag, the skin should be cleaned up.3.2.4 foundation formworkThe 3.2.4.1 formwork shall have enough strength, stiffness and stability to withstand the impact of concrete and the lateral pressure of concrete.3.2.4.2 formwork shall ensure the shape, size and position of the re

29、taining wall accurately, and be easy to disassemble. The joint of the formwork shall be tight and shall not leak or stagger the platform.3.2.4.3 mold release agent should be painted evenly, shall not pollute the steel bar.The 3.2.4.4 axis, the template line is completed, should be dealt with pre scr

30、eening procedures.3.2.4.5 template after installation, should check the reserved hole and embedment position, meet the design requirements, can be carried out under the step.When the 3.2.4.6 formwork is supported, the mouth of the template should be horizontal support first and then be fixed by diag

31、onal brace.3.2.5 pouring foundation concrete3.2.5.1 the concrete shall be checked and accepted before the concrete is poured. Template installation is firm, smooth, tight gap, debris should be cleared, excluding the water, and go through the pre screening procedures.3.2.5.2 concrete mix shall comply

32、 with the design strength requirements.3.2.5.3 concrete pouring, free fall is generally not greater than 2m, when larger than 2m, the use of pipe or chute transport.3.2.5.4 cast in place gravity reinforced concrete retaining walls shall be determined according to the concrete form and size of retain

33、ing walls. When the foundation and wall are arranged in stages, the following requirements shall be met:(1) the foundation concrete strength above 2.5MPa can support partner wall wall template.(2) the foundation concrete shall be laid in the foundation for supporting and locating the wall plate.3.2.

34、5.5 concrete vibration(1) the concrete foundation should adopt the plug-in vibrator vibrated, when the vibrating rod inserted in a straight line ranks, 1.5 times the distance shall not exceed the vibrating rod radius; if the plum blossom type ranks insert, moving distance shall not exceed 1.75 times

35、 the radius of action; vibration when the vibrator is not directly put in the bar.(2) vibration to concrete is no longer sinking, no significant bubbles, the surface is flat and consistent, began to emerge cement paste for the degree. If the surface water layer is found, the cause should be analyzed

36、 and solved.(3) the vibrating bar should be kept 50 to lOOmm distance from the template. The parts that are not suitable for vibration should be artificially vibrated.(4) concrete shall be divided into layers and the thickness shall not exceed 300mm. Each layer of concrete pouring shall not be inter

37、rupted; should the first layer of concrete vibration has not been before the initial setting of the secondary layer, concrete pouring and tamping. When vibrating the secondary concrete, the vibrating bar shall be inserted into the front layer from 50 to 100mm.With the installation requirements of ar

38、ticle 3.2.3 of this standard according to related regulations of the construction production of 3.2.6 wall reinforcement and embedded parts.3.2.7 vertical wall formworkAccording to the position of 3.2.7.1 line installation wall template, the template should be firmly supported, mouth and floor timbe

39、rs, accounted for in the die with wooden support, to prevent the template loosening, run mode in pouring concrete.According to the 3.2.7.2 template design after assembling the good side of the template and according to the position of line in place, and then install the rod or brace, mounting sleeve

40、 and wall bolt, wall bolt specifications and spacing should be clearly defined in the template design.3.2.7.3 clean the mess in the wall,Then install the other side of the template, adjust the support to the template vertically, tighten the pull bolts.3.2.7.4 template isolation agent should be paint

41、ed evenly, shall not pollute the steel bar.3.2.7.5 template after the installation is complete, check the fastener bolt securely, and under the export template patchwork is tight, for pre screening procedures.3.2.8 pouring wall concrete3.2.8.1 wall before concrete pouring, pouring in the bottom Jiec

42、ha first uniform thickness of 15 20mm and the wall of the same strength grade of concrete reduced stone concrete.3.2.8.2 concrete shall be divided into layers according to specifications, vibrating and compacted, and the layer thickness shall be no more than 300mm. The concrete blanking points shall

43、 be dispersed and arranged. The wall shall be continuously poured, and the interval between each layer shall not exceed the initial setting time of the concrete. The wall concrete construction joints shall be located at the design expansion joint.3.2.8.3 the concrete pouring height should be symmetr

44、ically and evenly poured on both sides of the tunnel opening. The vibrating bar is more than 300mm from the hole edge to prevent the hole from shifting and deforming.3.2.8.4 vibrated concrete pouring is completed, will be thrown out of the mouth of sorting out steel, wood trowel according to the des

45、ign elevation of the line of control level on the wall.3.2.8.5 other construction of wall concrete can refer to the construction of this standard 3.2.5.3.2.9 concrete curing3.2.9.1 after the completion of concrete pouring should be covered and watered within 12h, the number of watering should be ade

46、quate to keep concrete wet state, the maintenance period is generally less than 7d, according to the air temperature and humidity, and mixed with cement and admixture, appropriate extension.3.2.9.2 of large volume concrete retaining wall maintenance, according to climatic conditions to take control

47、measures, to control the temperature in the design requirements in.3.2.10 template removal3.2.10.1 when the strength of concrete reaches more than 2.5MPa, the side formwork can be removed.3.2.10.2 first release and remove the pull rod by section, and it should not be too long for one release. Not al

48、lowed to strike with heavy strokes or strong twisting.3.2.IO.3 block removal of formwork, demolition, pay attention to protect the wall, to prevent damage.3.2.10.4 the template and support should be repaired, sorted and stored properly after dismantling.3.3 seasonal construction3.3.1 construction pe

49、riod3.3.1.1 concrete construction must be ready to cover, block the rain and discharge water, in order to prevent rain soaking and erosion, affecting the quality of concrete.During the 3.3.1.2 period of construction, water content of sandstone varies greatly, measured in time, and adjust the construction mix, ensure the quality of concrete.3.3.1.3 concrete should