2010年一级建造师建筑工程考试真题及答案.pdf

上传人:雁** 文档编号:14911593 上传时间:2022-05-09 格式:PDF 页数:17 大小:497.93KB
返回 下载 相关 举报
2010年一级建造师建筑工程考试真题及答案.pdf_第1页
第1页 / 共17页
2010年一级建造师建筑工程考试真题及答案.pdf_第2页
第2页 / 共17页
点击查看更多>>
资源描述

《2010年一级建造师建筑工程考试真题及答案.pdf》由会员分享,可在线阅读,更多相关《2010年一级建造师建筑工程考试真题及答案.pdf(17页珍藏版)》请在taowenge.com淘文阁网|工程机械CAD图纸|机械工程制图|CAD装配图下载|SolidWorks_CaTia_CAD_UG_PROE_设计图分享下载上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables forthree years to resolve outstanding issues, obviously worked, victory of the year.The Countys departments atall levels must firmly establish the guanghui is gold and

2、 silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well fivewater treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay

3、 the sewage uphill battle. This year we will river water quality improved at the county level, up to fivethis basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, the Co

4、unty garbage River, black and odorous Riveris Dragnet investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy,improving the inferior fivewater quality monitoring stations work this year to ensure the Eliminatio

5、n of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year ofclear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source eng

6、ineering, engineering, matterof success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Domestic sewa

7、ge treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully toensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastew

8、ater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play,avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud, as the deep

9、ening water of this years plays.Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud wayout, ac

10、cording to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B)the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backwardproduction capacity, increase the intensity of为 为 了 了 促 促

11、 进 进 本 本公 公 司 司 各 各 项 项 经 经 营 营 活 活 动 动 由 由 事 事 后 后 管 管 理 理 向 向 事 事 前 前管 管 理 理 方 方 式 式 的 的 转 转 变 变 , , 强 强 化 化 生 生 产 产 经 经 营 营 全 全 过 过 程 程控 控 制 制 , , 提 提 高 高 资 资 金 金 使 使 用 用 的 的 计 计 划 划 性 性 , , 特 特 制 制 定 定本 本 管 管 理 理 办 办 法 法 , , 以 以 增 增 加 加 公 公 司 司 资 资 金 金 运 运 行 行 的 的透 透 明 明 度 度 , , 降 降 低 低 各 各 项 项

12、成 成 本 本 , , 使 使 有 有 限 限 的 的 资 资 金 金发 发 挥 挥 最 最 大 大 的 的 效 效 能 能 。 。treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirements to December 2016 end of Qian, all included

13、shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018

14、Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmlyclose the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a num

15、ber of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinityenvironment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in pri

16、nciple, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development.Four to

17、establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water,drainage, water supply, improving water s

18、aving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation strong library solid di spread row eng

19、ineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water so

20、urces protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding waterdepth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes,

21、 various elements mutual long. Four, manage to tighten control, to play three to split battle. Xia Baolong, Secretary ofprovincial party Committee stressed that while the three to split operation timeis over three years, but three to split must continue to catch on, and resolve a split cannot be cha

22、nged.All localities and departments tothe village and no unauthorised created2010 年一级建造师建筑工程考试真题及答案一、单项选择题一、单项选择题(共 20 题,每题 1 分。每题的备选项中,只有 1 个最符合题意)1.在建筑结构中,从基础到上部结构全部断开的变形缝是( )。 P9A.伸缩缝B.沉降缝C.防震缝D.温度缝2.如图所示, Pl、 P2 分别为两个相互垂直力的合力。 关于 P1、 P2 的关系, 正确的是 ( ) 。P9A.P1=P2B.P2=3P1C.P1D.P23P1()3.下列常见建筑结构体系中,

23、适用房屋建筑高度最高的结构体系是( )。 P16A.框架B.剪力墙C.框架一剪力墙D.筒体4.大跨度混凝土拱式结构建(构)筑物,主要利用了混凝土良好的( )。 P19videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables forthree years to resolve outstanding issues, obviously worked, victory of the year.

24、The Countys departments atall levels must firmly establish the guanghui is gold and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well fivewater treatment of winni

25、ng the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will river water quality improved at the county level, up to fivethis basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear ri

26、vers reaching the County created. Organization look back special inspection, the County garbage River, black and odorous Riveris Dragnet investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy,improving the inf

27、erior fivewater quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year ofclear rivers standards. Second, pay special attention to pollution-cutting construction

28、of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matterof success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support netw

29、ork construction, is focusing on nanotubes home last meters question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully toensure the realization of all County 648 formed vil

30、lage coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play,avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Pro

31、vinces now have focused on pollution control of water go to dig up mud, as the deepening water of this years plays.Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires d

32、etailed cleaning, dredging plan, planning ahead of time cleaning out mud wayout, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B)the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primar

33、ily the source of backwardproduction capacity, increase the intensity of为 为 了 了 促 促 进 进 本 本 公 公 司 司 各 各项 项 经 经 营 营 活 活 动 动 由 由 事 事 后 后 管 管 理 理 向 向 事 事 前 前 管 管 理 理 方 方 式 式 的 的 转 转 变 变 , , 强 强 化 化 生 生 产 产 经 经 营 营 全 全 过 过 程 程 控 控 制 制, , 提 提 高 高 资 资 金 金 使 使 用 用 的 的 计 计 划 划 性 性 , , 特 特 制 制 定 定 本 本 管 管 理

34、理 办 办 法 法 , , 以 以 增 增 加 加 公 公 司 司 资 资 金 金 运 运 行 行 的 的 透 透明 明 度 度 , , 降 降 低 低 各 各 项 项 成 成 本 本 , , 使 使 有 有 限 限 的 的 资 资 金 金 发 发 挥 挥 最 最 大 大 的 的 效 效 能 能 。 。ro p e tu b e p r o t e c t i o n . (3 ) p o s i t i o n o f th e sw i t c h b o x m u s t b e p l a c e d c o r r e c t l y , p r o h i b i t re v

35、e P a r t s a r e n o t a l l o w e d d i r e c t c o n t a c t w i t h th e g r o u n d , m a d e o f i m p e r m e a b l e m a t e r i a l a t th e b o t t o mp a d 1 0 0 m m . D , p a c k i n g a n d tr a n s p o r t fo r a l l m a t e r i a l s a r e u s e d to m a k e d e c o r a t i v e u s e

36、s , so a l l o f th e c o m p a n y s fa c t o r y fi n i s h e d a n d se m i - f i n i s h e d p r o d u c t s a r e i m p o r t e d p r o t e c t i v e ta p e to p r o t e c t th e su r f a c e o f th e m a t e r i a l , so a s n o t to d a m a g e su r f a c e d u r i n g tr a n s p o r t , S e

37、t u p , a n d th e n tr a n s p o r t e d b y fi b r o u s b a n d s o r p a c k e d i n to th e sc e n e . A f t e r th e m a t e r i a l s d e l i v e r e d to th e si t e , sp e c i a l p r o t e c t i o n a n d b u i l d e r s a r o u n d c a r e f u l c o o r d i n a t i o n . A l l m a t e r i

38、 a l s d e l i v e r e d to th e si t e , w h e r e a r e p l a c e d i n a v e n t i l a t e d sh e l t e r . 8 , o n - s i t e i n s t a l l a t i o n o f te c h n i c a l c o n t r o l a n d sc h e d u l e c o n t r o l o f p e r s o n n e l s q u a l i t y a n d te c h n o l o g y i s a n i m p

39、o r t a n t fa c t o r i n d e t e r m i n i n g q u a l i t y . O u r i n s t a l l e r s a r e p r o f e s s i o n a l l y tr a i n e d sk i l l e d w o r k e r s , th e c o m p a n y d o i n g th e e n g i n e e r i n g e x e r c i s e tr a i n e d a n u m b e r o f te c h n i c a l st a n d a r

40、d s h i g h , st r o n g o p e r a t i o n a l sk i l l s o f th e c o n s t r u c t i o n te a m , h a s a c c u m u l a t e d ri c h e x p e r i e n c e i n c o n s t r u c t i o n . F o r th i s p r o j e c t , se l e c t e d th e b e s t p e r s o n n e l a n d e q u i p p e d w i t h A d v a n

41、c e d i n s t a l l a t i o n te c h n i q u e s a n d e q u i p m e n t . B e f o r e th e a p p r o a c h , b y re l e v a n t l e a d e r s o n th e i m p o r t a n c e o f th i s p r o j e c t , so th a t i n s t a l l e r s h a v e e n o u g h a w a r e n e s s b y te c h n i c i a n s o n th e

42、 re l e v a n t st a n d a r d sp e c i f i c a t i o n s a n d sa f e t y g u i d e l i n e s a l l te c h n o l o g y to B u i l d e r g i v e s th e l o w - d o w n .treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution

43、 industry regulation three years action plans, requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standa

44、rd regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmlyclose the high energy

45、 consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project Trinityenvironment access system, promoting ind

46、ustry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservat

47、ion, recycling and low-carbon and clean production, and improve the level of green development.Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution insta

48、llations do not. (Iii) linkage to promote flood control water,drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood con

49、trol drainage engineering construction, vigorouslyimplementation strong library solid di spread row engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood cont

50、rol drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding waterdepth. Further soil pollution and repair,

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 教育专区 > 成人自考

本站为文档C TO C交易模式,本站只提供存储空间、用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。本站仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知淘文阁网,我们立即给予删除!客服QQ:136780468 微信:18945177775 电话:18904686070

工信部备案号:黑ICP备15003705号© 2020-2023 www.taowenge.com 淘文阁