1、精选优质文档-倾情为你奉上項 目Item程序書Procedure文件編號Doc. No,DM010版 次Version00G文件名稱Doc. Name工程變更管制程序Engineering Change Control Procedure制訂日期Date2007/3/12Mar. 12, 2007頁 次Page1/4流程 Flow活動 Activities權責單位Authorized & Responsible Unit參考文件Reference Doc.表單記錄Form Record製作單會簽Manufacturing unit Countersigns初審First-check需求(ECR
2、/ECN)Demand ECR/ECN退原申請單位Return to Original Applying UnitNG執行變更Execute ChangeNG確認樣品SOP/SIP更新Confirm sample and update SOP/SIPECN會簽Countersign ECN核准/Approve發行/Release1.需求部門提出申請(填寫ECR)及書面文件經部門主管簽核後,送至工程部及業務部初審. Units apply for the demanding (fill in ECR) and send all written documents to dept. supervi
3、sor for signing and checking and to Engineering Dept. & Sales Dept. for first-check.2.如客人需求變更,由業務部ECN直接會簽If customer requests us to change engineering, Sales Dept. will directly countersign ECN.1.業務,工程確認OK後,由業務會簽客人,如客人同意,申請單位轉正式ECN由工程文管統一臨時編號;Sales Dept. will countersign Customer after engineering c
4、hange is confirmed by Sales Dept. and RD; applying unit will change it into the formal ECN and submit to DCC of RD for temporarily assigning uniform numbers.2.審核圖面或相關資料.Check the drawings or related references.1. 製作通知單會簽相關單位,提供費用,時間,庫存(庫存給客戶確認處理方式)Related units make and countersign notification for
5、providing cost, time and stock. (Customer decide how to handle stocks) 修模制作通知單會簽業務部,生管部,模具部或模具保養組Sales, Production Control, Tooling Dept and Mold Maintenance Team will countersign mold repair notification2.會簽完後由副總經理核准Vice General Manager should approve the mold repair notification after being counte
6、rsigned.1.產品執行設變Execute engineering change for products.2,需重新修模或試模的,需由相關部門反映給工程部,重新由業務下單啟動系統.Related departments should reflect those products needed to be re-repaired and mold testing to RD; Sales dept will re-draw list to start system.3.文件修訂,其中變動SOP/SIP由相關單位提供給工程確認OK后,工程發NOTES通知於相關單位正式更新執行.Revisio
7、n of documents and changed parts of SOP/SIP will be provided to RD for confirmation and sending out NOTES to related units for formally updating and executing SOP/SIP.1.ECN會簽相關部門Related departments countersign ECN.2.生管提供庫存(包括各製程及供應商庫存數量)統一數量填至ECN備注橍並簽名Production Control provides uniform quantity of
8、stocks including all manufacturing stages and vendors and fills into the notes column of ECN and sign.3,相關單位填寫ECN執行附表或完成時間Related unit fills in ECN execution attachment form and completion time.1.工程部主管/或代理人核准.RD supervisor or his agent approves ECN.1. 工程文管以電子檔存放於(勤誠ECN專區/包括BOM),協力廠由生管部執行轉發.DCC in RD
9、 keeps it as electronic file in Chenbro ECN dedicated area including BOM and Production Control transmit it to Assistant Factory.2.設變圖面,承認書發行在Notes專區,協力應商由資材部執行轉發.Distribute change drawing and specification approval sheet to Notes dedicated areas, and transmit to Assistant Factory by Asset Controlle
10、r Section.3.一般ECN會簽到發行總時間為1.5天內.緊急ECN會簽到發行總時間為1天內.Generally, from countersigning to releasing, it costs 1.5 days for normal ECN and 1 day for urgent ECN.相關部門Related Dept.客戶Customer客戶Customer業務部Sales Dept.工程部RD工程部RD相關部門Related Dept.相關部門Related Dept.工程部RD製造部生技Technician of Manufacturing Dept.品保部QC Dep
11、t工程部RD相關部門Related Dept.工程部RD工程部RD相關部門Related Dept.客人變更資料Customer change materials設變圖面Drawing changeECN設變圖面Drawing changeECN執行附表ECN execution attached formECRECN1.ECN/圖面ECN Drawing2.BOM/圖面BOM Drawing3.ECR/圖面ECR Drawing制作通知單Manufacture Notification檢測表Checking ListSOP/SIPECN設變圖面Design Change Drawing項 目
12、Item程序書Procedure文件編號Doc. No,DM010版 次Version00G文件名稱Doc. Name工程變更管制程序Engineering Change Control Procedure制訂日期Date2007/3/12Mar. 12, 2007頁 次Page2/4流程 Flow活動 Activities權責單位Authorized & Responsible Unit參考文件Reference Doc.表單記錄Form Record清數區分隔離Count& Separate變更型態Change Type料品用完Use up all materials清數區分隔離Count
13、& Separate自然切換ChangeNaturally立即報廢Scrap Instantly舊品修正Modify Old Product清查庫存.提報數量Check Storage & Report Amount制程修正Modify Process 開單報廢Make Scrap ping ListECN標簽區分Mark & Separate ECN products樣品確認Confirm sample入ECN庫位Place products in ECN warehouseECN料品使用提報ECN Material Using and Proposal區分出貨Separate outgoi
14、ng products結案/End case1.依客戶需求,制程改善,設計變更等之需求,如未經客戶同意不得任意變更.Modify procedure and change design according to clients requirement, and cant randomly change without customers permission.2.相關部門依工程部發行 ECN之變更型態對產品進行處理.並填寫ECN實際執行表,工程專案將依此CHECK.結案後由文管中心存檔發行.Related departments handle products per change type
15、in ECN published by Engineering Dept and fill in ECN actual execution form; Project team in RD should check products and close case per it; DCC will file and issue ECN documents after being closed.1. 由品保對設變前產品進行區分標示,倉庫進行運作,貼ECN標簽區分,倉管負責提報產品數量(包括各製程庫存數及供應商之庫存數)Product before design changed is marked
16、separately by Q.C., and manipulated by the warehouse with ECN label; Production Control/Warehouse supply product quantity. (Including storage amount at customers and in all manufacturing processes)勤誠電腦(東莞)有限公司智易通電腦(東莞)有限公司文件管制發行章2007-01-292.業務核算損失,向客戶收取ECN損失費用,將結果匯報給副總經理,并提報給工程專案人員Salesmen count los
17、s, and collect loss cost from client, and report the result to Vice President and project team in charge of the Engineering Case.1.所有設變后產品必須由工程部及品保進行確認.All design changed products should be approved by both Engineering Dept. and Q.C.1. 倉庫入ECN庫位,每周提報ECN料品使用狀況.Place products in ECN warehouse, and repo
18、rt ECN materials using state weekly.1. 業務負責人在NOTES中結案並注明此項ECN的損失費用. Salesmen indicate the ECN loss cost in the notes when case ends. 單位工程部RD客戶/工程部Customer/RD相關部門Related Dept.品保部QC Dept.資材部Asset Controller製造部Manufacture Dept.品保部QC Dept.工程部/倉庫RD/Warehouse品保部QC Dept資材部Asset Controller資材部Asset Controlle
19、r業務部Sales DeptECN執行表ECN execution attached form舊品實際庫存各製程清點記錄表 Actual old products stock and all processes inventory record form 舊品完結工令單Old products completion work order新品導入工令單New products led in work order新品導入品保製程首件檢驗表QC FAI form for new products led in 舊品出貨訂單Old products delivery order新品出貨訂單New pr
20、oducts delivery orderORACLE中有記錄Record in ORACLEECN報廢單Scrapping list異常費用明細表Abnormal Cost List項 目Item程序書Procedure文件編號Doc. No,DM010版 次Version00G文件名稱Doc. Name工程變更管制程序(附件一)Engineering Changes Control Procedure (Appendix I)制訂日期Date2007/3/12Mar. 12, 2007頁 次Page3/4一. 會簽時間及窗口定義Countersigning time and window
21、definition:1. ECN: 一般ECN會簽至發行總時間:1.5天內.緊急ECN會簽至發行總時間:1天內.ECN: Generally, from countersigning to releasing, it costs 1.5 days for normal ECN and it costs one day for urgent ECN.2. 修模制作通知單:會簽至發行時間:1天內. 緊急修模制作通知單會簽至發行時間:0.5天內.Manufacture Notification for mold repair: From countersigning to releasing, i
22、t costs one day for normal manufacturing notification and it costs half of a day for emergent one.修模制作通知單會簽Countersign manufacture notification for mold repair勤誠電腦(東莞)有限公司智易通電腦(東莞)有限公司文件管制發行章2007-01-29工程部ECN會簽RD countersigns ECN業務部會簽時間(當時會簽)Sales Dept. Countersigning Time (Countersign at the time)生管
23、部會簽時間(三小時內)Production Control Dept. countersigns Time (Within 3 hours)臺北自行發行的,工程在會簽后2小時內發行ECN should be released within 2 hours for the project decided by Taipei after countersigned.工程需臺北回复才能發行的在臺北回复后2小時內發行ECN should be released within 2 hours for the project decided by RD with the response of Taipe
24、i.品保部會簽時間(當時會簽) Q. A. Dept. Countersigning Time (Countersign at the time)資材部會簽時間(當時會簽)Asset Controller Dept. Countersigning Time (Countersign at the time)工程能自行判定發行的,在會簽后2小時內發行ECN should be released within 2 hours for the project decided by RD after countersigned.NCT部會簽時間(當時會簽)NCT Section Countersign
25、ing Time (Countersign at the time)模具部會簽時間(當時會簽)Mold Dept. Countersigning Time (Countersign at the time)組裝部會簽時間(當時會簽)Assembly Dept. Countersigning Time (Countersign at the time) .資材部會簽時間(外購件模具) (當時會簽)Asset Controller Dept. Countersigning Time for purchasing molds (Countersign within an hour)模具部會簽時間修模
26、類1小時內Mold Dept. Countersigning Time: Mold repair countersigns within 1 hour. 生管部會簽時間(3時會簽)Production Control Dept. countersigns Time (Within 3 hours)業務部會簽時間(當時會簽)Sales Dept. Countersigning Time (Countersign at the time) 項 目Item程序書Procedure文件編號Doc. No,DM010版 次Version00G文件名稱Doc. Name工程變更管制程序(附件二)Engin
27、eering Changes Control Procedure (Appendix II)制訂日期Date2007/3/12Mar. 12, 2007頁 次Page4/4勤誠電腦(東莞)有限公司智易通電腦(東莞)有限公司文件管制發行章2007-01-29 二相關說明Related statements:1 以上各單位課長會簽時,必須按要求回相關事項,如有問題需在說明原因, 否則視為拒簽.All unit supervisors above should respond for related items per engineering requirements while countersi
28、gning, if exceed the time, explanations are needed or it shall take as rejecting signing.2 會簽時,如相關單位課長不在,將由職務代理人處理簽字.(請提供代理人名單)When countersigning, if the supervisor of related unit is absent, signed by the agent. (Please provide the list of the agents.)3 相關單位會簽時,如不能當時會簽的,等會簽好后,必須通知主導單位去拿單,且 不能超出限定時
29、間,如有異常請通知主導單位.When countersigning, if related units cant countersign at the time, they should notify the leading units to take the sheet after countersigned without exceeding the deadline and please inform guiding unit of abnormity.4 修模的部分,生管在會簽時請寫出庫存數,工程或業務將庫存數書面給客人,客人決定庫存之處理新品導入方式後,工程再通知相關部門之處理方式.
30、As for mold repair in the , Production Control shall give out the store amount when countersigning, and Engineering Dept. shall notify Taipei of the store amount in written form, and Taipei shall inform Engineering Dept. of their decision about stocks treatment and lead-in way of the new products, t
31、hen Engineering Dept. shall instruct Production Control and buyer to treat through Notes5 拒簽者或超出限定時間者,由主導單位提出處罰大過一次.Persons who reject signing or exceed the deadline shall be reported being punished for the major merits by the leading unit.6 ECN,制作通知單只會簽至上述定義之窗口,其它相關人員由相關部門自行內部協調處理.ECN and manufacturing notification only can be countersigned by above-mentioned windows and other related departments should negotiate with and handle ECN and manufacturing notification privately. 专心-专注-专业