1、精选优质文档-倾情为你奉上土方工程河道清表2+000-2+700:(54+60)/2*700*0.242=9655.8m2+700-3+400:(60+52)/2*700*0.242=9486.4m3+400-4+100:(52+60)/2*700*0.242=9486.4m4+100-4+600:(60+58)/2*500*0.242=7139m4+600-5+000:(58+50)/2*400*0.242=5227.2m河道土方开挖2+000-2+200:13*200=26002+200-2+700:(13+21.05)/2*500=8512.52+700-3+400:(21.05+3.9
2、)/2*700=8732.53+400-4+100:(3.9+39.3)/2*700=151204+100-4+600:(39.3+13)/2*500=130754+600-5+000:(13+23.4)/2*400=7280河道石方开挖320*27.8*0.4=3558.4m外购土填筑2+000-2+200:(10+4)*200=28002+200-2+700:(10+4+5.6+10.8)/2*500=76002+700-3+400:(16.2+0)/2*700=56704+100-4+600:(8.4+0)/2*500=21004+600-5+000:(8.6+0)*400=1720外购
3、土压实按外购土填筑计算砌石工程2+000-2+320格宾基础:151.7*【0.8*0.65-(0.27*0.13)/2】*2=152.3m拦沙坎挡土墙:【1.5*0.6+1.3*(1+0.58)/2】*165*2=660m2+320-2+535格宾基础:53*【0.8*0.65-(0.27*0.13)/2】*2=53.2m拦沙坎挡土墙:【1.5*0.6+1.3*(1+0.58)/2】*161*2=640.8m2+535-2+700格宾基础:165*【0.8*0.65-(0.27*0.13)/2】*2=165.7m3+400-4+100格宾基础:689.5*【0.8*0.65-(0.27*0.
4、13)/2】*2=692.3m4+113-4+275拦沙坎挡土墙:【1.5*0.6+1.3*(1+0.58)/2】*162*2=648m4+478-4+700拦沙坎挡土墙:【1.5*0.6+1.3*(1+0.58)/2】*222*2=888m4+700-5+000格宾基础:297*【0.8*0.65-(0.27*0.13)/2】*2=298.2m格宾护坡2+000-2+320: 313*5*2=31302+320-2+700: 373.4*5*2=37343+400-4+100: 687.2*3=2062 687.2*4=27494+600-5+000: 394*4=1576 394*5=19
5、70草皮护坡2+000-2+700:(3+1.2)*700*2=58802+700-3+400:2*700*2=28003+400-4+100:4*700+1.2*700=36404+100-4+600: 4*500*2=40004+600-5+000:(2+4.2)*400=24802#漫水桥土方开挖:36*14.8*2=1065.6m石方开挖:36*14.8*1.4=799.2m土方回填:36*13.8*1.6-154-77-23=541m余土外运:1294m砌体拆除:32*5*2+32*9*0.4=435.2m浆砌毛石桥台、桥墩基础:6.6*1.99*0.6+6.6*(1.99-0.25
6、*2)*0.6=13.8*2=27.6m (7.8+8.3)/2*(1.7*0.6+1.2*0.6)*9=126.1m桥台:浆砌块石:6.6*(1.54+1.54+1.59)/3*0.25*2=5.1m浆砌毛石:6.6*【(1+0.6)/2-0.25】*1.56*2=11.3m桥墩:浆砌块石:6.6*1.56*0.25*2=5.1*9=46.3m 0.7*3.14*0.25*1.56=0.86*9=7.7m 46.3+7.7=54m浆砌毛石:6.6*1.56*0.2*9=18.5m 0.7*3.14*0.2*9=4m 18.5+4=22.5m 小计:块石:59.1m 毛石33.8mC30现浇砼
7、桥台台帽、桥墩墩帽:6.6*(0.4*0.65+0.3*0.3)*2=4.62m (6.6*0.4*0.8+0.4*0.4*3.14*0.4)*9=30.2mC35现浇砼桥板:30*0.3*6.6=59.4mC30现浇砼隔水墙:0.6*32*2=38.4mC30现浇砼拦沙坎:0.6*32*2=38.4m C35现浇路面:23.1*0.2*6*2=55m 引道水泥稳定碎石基层:23.1*6*0.18*2=50m C30现浇砼消力护坦:32*12.6*0.2=80.64m 32*0.1*9=28.8m浆砌毛石消力护坦:32*0.3*9=86.4m 32*0.8*0.8=20.5m (32*12.6
8、-58.2)*0.3=103.5m 103.5+86.4+20.5=210.m水标尺:14根3#漫水桥土方开挖:36*13.8*3=1490.4m石方开挖:32*9*0.4+0.8*32*0.8=135.7m土方回填:34*13.8*1.36-154-77-23=496.7m余土外运:1129.4m砌体拆除:32*5*1.8+32*9*0.4=403.2m浆砌毛石桥台、桥墩基础:6.6*1.99*0.6+6.6*(1.99-0.25*2)*0.6=13.8*2=27.6m (7.8+8.3)/2*(1.7*0.6+1.2*0.6)*9=126.1m桥台:浆砌块石:6.6*(1.54+1.54+
9、1.59)/3*0.25*2=5.1m浆砌毛石:6.6*【(1+0.6)/2-0.25】*1.56*2=11.3m桥墩:浆砌块石:6.6*1.56*0.25*2=5.1*9=46.3m 0.7*3.14*0.25*1.56=0.86*9=7.7m 46.3+7.7=54m浆砌毛石:6.6*1.56*0.2*9=18.5m 0.7*3.14*0.2*9=4m 18.5+4=22.5m 小计:块石:59.1m 毛石33.8mC30现浇砼桥台台帽、桥墩墩帽:6.6*(0.4*0.65+0.3*0.3)*2=4.62m (6.6*0.4*0.8+0.4*0.4*3.14*0.4)*9=30.2mC35
10、现浇砼桥板:30*0.3*6.6=59.4mC30现浇砼隔水墙:0.6*32*2=38.4mC30现浇砼拦沙坎:0.6*32*2=38.4m C35现浇路面:28.2*0.2*6*2=67.7m 引道水泥稳定碎石基层:28.2*6*0.18*2=61m C30现浇砼消力护坦:32*12.6*0.2=80.64m 32*0.1*9=28.8m浆砌毛石消力护坦:32*0.3*9=86.4m 32*0.8*0.8=20.5m (32*12.6-58.2)*0.3=103.5m 103.5+86.4+20.5=210.m水标尺:14根4#漫水桥土方开挖:36*13.8*1.9=943.9m石方开挖:3
11、6*13.8*1.65=819.7m土方填筑:34.4*13.8*1.6-154-77-23=505.5m余土外运:1393.8m砌体拆除32*5*1.2+32*9*0.35=292.8m浆砌毛石桥台、桥墩基础:6.6*1.99*0.6+6.6*(1.99-0.25*2)*0.6=13.8*2=27.6m (7.8+8.3)/2*(1.7*0.6+1.2*0.6)*9=126.1m桥台:浆砌块石:6.6*(1.54+1.54+1.59)/3*0.25*2=5.1m浆砌毛石:6.6*【(1+0.6)/2-0.25】*1.56*2=11.3m桥墩:浆砌块石:6.6*1.56*0.25*2=5.1*
12、9=46.3m 0.7*3.14*0.25*1.56=0.86*9=7.7m 46.3+7.7=54m浆砌毛石:6.6*1.56*0.2*9=18.5m 0.7*3.14*0.2*9=4m 18.5+4=22.5m 小计:块石:59.1m 毛石33.8mC30现浇砼桥台台帽、桥墩墩帽:6.6*(0.4*0.65+0.3*0.3)*2=4.62m (6.6*0.4*0.8+0.4*0.4*3.14*0.4)*9=30.2mC35现浇砼桥板:30*0.3*6.6=59.4mC30现浇砼隔水墙:0.6*32*2=38.4mC30现浇砼拦沙坎:0.6*32*2=38.4m C35现浇路面:30.4*0
13、.2*6*2=73m 引道水泥稳定碎石基层:30.4*6*0.18*2=65.7m C30现浇砼消力护坦:32*12.6*0.2=80.64m 32*0.1*9=28.8m浆砌毛石消力护坦:32*0.3*9=86.4m 32*0.8*0.8=20.5m (32*12.6-58.2)*0.3=103.5m 103.5+86.4+20.5=210.m水标尺:14根5#漫水桥土方开挖: 36*13.8*2.1+32*9*0.4+32*0.8*0.8=1179m石方开挖:36*13.8*1.85=919.1m土方填筑:34.4*13.8*1.6-154-77-23=505.5m砌体拆除:32*5*1.
14、2+32*9*0.35=292.8m浆砌毛石桥台、桥墩基础:6.6*1.99*0.6+6.6*(1.99-0.25*2)*0.6=13.8*2=27.6m (7.8+8.3)/2*(1.7*0.6+1.2*0.6)*9=126.1m桥台:浆砌块石:6.6*(1.54+1.54+1.59)/3*0.25*2=5.1m浆砌毛石:6.6*【(1+0.6)/2-0.25】*1.56*2=11.3m桥墩:浆砌块石:6.6*1.56*0.25*2=5.1*9=46.3m 0.7*3.14*0.25*1.56=0.86*9=7.7m 46.3+7.7=54m浆砌毛石:6.6*1.56*0.2*9=18.5m
15、 0.7*3.14*0.2*9=4m 18.5+4=22.5m 小计:块石:59.1m 毛石33.8mC30现浇砼桥台台帽、桥墩墩帽:6.6*(0.4*0.65+0.3*0.3)*2=4.62m (6.6*0.4*0.8+0.4*0.4*3.14*0.4)*9=30.2mC35现浇砼桥板:30*0.3*6.6=59.4mC30现浇砼隔水墙:0.6*32*2=38.4mC30现浇砼拦沙坎:0.6*32*2=38.4m C35现浇路面:30.9*0.2*6*2=72.5m 引道水泥稳定碎石基层:30.9*6*0.18*2=66.7m C30现浇砼消力护坦:32*12.6*0.2=80.64m 32
16、*0.1*9=28.8m浆砌毛石消力护坦:32*0.3*9=86.4m 32*0.8*0.8=20.5m (32*12.6-58.2)*0.3=103.5m 103.5+86.4+20.5=210.m水标尺:14根生产桥土方开挖:38.5*10.5*1.83=740m砌体拆除:37*6*4.1=910.2m桥台搭板水泥稳定层:10.5*0.3*5.5*2=34.7m锥坡碎石稳定层:(3.23*6.46)=15.2m (4.3+8.7)=16.8m (7.275*2*3.14)/2*4.85*0.1=11.1m浆砌块石桥台锥坡:(3.23+6.46)=45.5m (4.35+8.7)=50.3m
17、 (7.275*2*3.14)/2*4.85*0.35=33.2m浆砌毛石桥台锥坡及踏步:7.275*2*3.14*(0.8+0.6)/2*0.8=17.6m 10.5*0.8*(0.6+0.8)/2*2=11.76m 4.32*0.8*(0.6+0.8)/2*4=9.7m (01*1+0.65*0.35+0.3*0.2*23)*1*2=3.42m锥坡台背填土:(3.23+6.46)=151.6m (7.275*3*2*3.14)/2*4.85*1.2=132.9m (4.35+8.7)=134.1m砼工程C50预应力钢筋砼空心板:6.08*24=146m预应力钢绞线:4.68t封端C40砼:
18、(0.8*0.44-0.127*0.08)*0.5*48=8.1m吊装空心板:154mC50钢筋砼铰缝:13*(0.17*0.11)/2*0.45*7*3=17.2m (0.17+0.08)/2*13*7*3=1.85m (0.11+0.16)/2*0.05*13*7*3=1.84mC40桥面铺装:10.5*39*0.13=53.2mC30桥台、桥墩盖梁:7.31*1*1.6*2+(1+0.55)/2*1.55*1.6*4=31.1 1.6*10.5*1*2=33.6m混凝土灌注桩:9.8*0.6*3.14*2=44.4m 7.5*0.6*3.14*2*2=33.9mC30桥墩立柱:3.15*
19、0.5*3.14*4=9.9mC30桥台、桥墩盖梁挡块:0.24*0.3*1.6*4=0.46m 0.24*0.3*1.1*4=0.32mC25耳背墙及墩盖梁挡块:1.05*0.5*10.5*2=11m 2.25*(0.5+2)/2*0.3*4=3.4m (0.3*0.3+0.3*0.3/2*9.9)*2=2.67mC40支座垫石:0.3*0.3*0.15*88+0.15*0.15*0.15*8=1.215m支座:96块泄水管:13m伸缩缝:19mC25桥台搭板:9.5*6*0.35*2=40m钢筋加工及安装:62.37t护栏89m 2.1*1.5矩形过水涵洞2座 土石方开挖:(14*4.7+
20、3*1.5*2*14+14*4.7/2)*3.3*2=850.1m 浆砌毛石基础 1.5*0.6*7*2=12.6*2=25.2m 隔水墙:0.4*0.8*3.34*2=2.14*2=4.28m 浆砌八字墙: (2.15+0.6)/2*【(0.913+0.56)/2+0.4/2】*3*4=15.5*2=31m 浆砌毛石挡土墙 (1.1+0.5)/2*7*1.45*2=16.24*2=32.48m 浆砌八字墙基础 3*(1.213+0.8)/2*0.4*4=4.8*2=9.6m 浆砌护底 7*0.2*2.1+(2.1+2.94)/2*2.94*0.2*2=5.9*2=11.8m C30砼台帽 (
21、0.25*0.5+0.25*0.25)*7*2=2.63*2=5.25m C30砼盖板 2.5*0.25*7=4.38*2=8.76m 钢筋:0.96t1.5*1.5矩形过水涵洞3座土石方开挖 (15*4.1+3*1.5*2*15+15*4.1/2)*3.3*3=1277.1m 浆砌毛石基础 1.5*0.6*9*2=16.2*3=48.6m 隔水墙0.4*0.8*3.34*2=2.14*3=6.42m 浆砌毛石挡土墙 (1.1*0.5)/2*9*1.45*2=20.88*3=62.64m 浆砌八字墙基础 3*(1.213+0.8)/2*0.4*4=4.8*3=14.4m 浆砌八字墙: (2.1
22、5+0.6)/2*【(0.913+0.56)/2+0.4/2】*3*4=15.5*3=46.5m 浆砌护底 9*0.2*1.5+(1.5+2)/2*3*0.2*2=4.8*3=14.4 m 台帽 (0.25*0.5+0.25*0.25)*9*2=3.375*3=10.125m 盖板 2*0.25*9=4.5*3=13.5m 钢筋:1.49t 单孔过水涵洞9座土石方开挖(14*3+3.5*1.5*2*14+14*3/2)*3.5*9=3638.3mC25砼基础 8*2*0.2+0.35*(0.7+0.35)/2*8*2=6.14*9=55.26m 八字墙基础 3*(0.8+1.04)/2*0.4
23、*4=4.42*9=39.78m 隔水墙 0.8*0.4*3.34*2=2.14*9=19.26m 浆砌护底 3*(1+0.1*2)+(2*1*0.577)/2*0.2*2=2.3*9=20.7m 浆砌毛石挡土墙 【(0.8+0.4)/2+(0.56+0.4)/2】/2*(0.6+1+0.1)/2*3*4=5.51*9=49.59m 1.1*(1+0.1*2+0.1+0.4)*0.6*2=2.1*9=18.9m 管:72m 双孔过水涵洞1座土石方开挖14*5*3.3+3.3*1.5*2*14+14*5/2*3.3=459.7mC25砼基础 3.5*0.2*8+0.15*2.5*8+(0.35+
24、0.4)/2*8/2*2+(0.2+0.4)/2*8=14m 八字墙基础 3*(0.8+1.04)/2*0.4*4=4.42m 0.8*0.4*3.34*2=2.14m 浆砌护底 3*(1+0.1*2)+(2*1*0.577)/2*0.2*2=2.3m 浆砌八字墙 【(0.8+0.4)/2+(0.56+0.4)/2】/2*(0.6+1+0.1)/2*3*4=5.51m 1.1*(1+0.1*2+0.1+0.4)*0.6*2=2.1m 管:16m 沁园春雪北国风光, 千里冰封, 万里雪飘。望长城内外,惟余莽莽;大河上下,顿失滔滔。山舞银蛇, 原驰蜡象, 欲与天公试比高。须晴日, 看红装素裹,分外妖娆。江山如此多娇, 引无数英雄竞折腰。惜秦皇汉武,略输文采;唐宗宋祖,稍逊风骚。一代天骄,成吉思汗,只识弯弓射大雕。俱往矣,数风流人物, 还看今朝。 克专心-专注-专业