1、精选优质文档-倾情为你奉上 川东北气田项目工作安全分析表CDB Gas Project Job Safety Analysis (JSA) Form工作/任务JOB/TASK组织ORGANIZATION工作场所WORK LOCATION日期DATE弯头打磨除锈作业Elbow Burnish Derusting 班前会议Toolbox Talk硫磺厂8料场Sulfur plant Yard 8 环境个人保护Required P.P.E:安全眼镜、安全鞋、安全帽、手套、防护面具、耳塞、口罩等Safety glasses, safety boots, hard hat and gloves,prot
2、ective mask ,earplugs ,respirator所需工具Required Tools:手持电动砂轮机、钢丝刷Hand-held electric grinder 、steel brush 序 号 ITEM工作的主要步骤MAJOR STEPS OF THE JOB/TASK潜在危险POTENTIAL/ASSOCIATED HAZARDS解决方案/管理方法SOLUTIONS/CONTROL MEASURES 1前期动员Pro-mobilization1. 不清楚或错误理解工作许可的内容(作业范围、劳保工具)以及作业中的可能危险。Failure to understand perm
3、it conditions (job scope, PPE) and potential hazards during operation.1. 清楚工作内容,讨论作业中可能的危险,提出排除或降低危险的方法。Understand job content; discuss hazards associated in the operation and conduct actions to eliminate hazards.2. 穿戴工作许可中要求的劳保用品。Wear proper PPE as permit required.3. 完成所要求的工作安全分析表。确保全体员工参加班前会并发言。Co
4、mplete JSA as required. Make sure everyone in the crew joins and participates in the meeting.2作业前准备Preparations 连接电源线,有触电的可能When connect the power line ,it is possible to get electric shock .1.由专业电工负责接线,并持证上岗。It should be charged by electrician to connect power line and work with certificates.2.接通电源
5、线时采取隔离措施。Take isolation measuer when put on the power .3.消除裸露的电源线的安全隐患。Eliminate potential safety hazard of bare power line .4. 由专业电工检查手持砂轮机是否有漏电保护。Electrician are responsible for checking hand held electric grinder with earth leakage protection or not .3打磨、除锈作业Burnishing , Derusting work 1. 有可能发生触电
6、伤害。May get electric shock .2. 有可能划伤人员的手。May scratch operators hands 3. 打磨时噪音大,有可能损伤听力。When grinding ,noise may damage hearing .4. 打磨时,沙砾或铁削有可能溅入眼内或损伤面部。 When grinding , gravel or iron may splash into eys or damage face .5. 打磨时的粉尘有可能进入呼吸道,损害上呼吸道和肺部。 When grinding, dust may enter into respiratory trac
7、t ,which will damage respiratory tract and lungs .1.使用时再次检查砂轮机是否存在安全隐患,如有电源线裸露情况,及时处理。 Check again if power line is bare,if so ,take immediate measures to get rid of .2.正确操作砂轮机,操作时严禁戴手套。Operate with grinder properly and forbidden to wear gloves when working .3.操作时,戴好耳塞。Wear earplugs ,.when working .
8、4.作业时戴好护目镜和防护面具。Wear goggles and protective mask ,.when working .5.戴上口罩Wear respirator .4刷漆作业Painting work 1. 刷漆时,有可能溅入眼内When painting , paint may splash into eyes .2. 刷漆时,气味大,有可能受到伤害。When painting , respiratory system may get harmed .1. 戴上护目镜。Wear goggles .2. 戴上口罩,尽可能站在上风口方向刷漆。 Wear respirator and
9、stand at windward side to brush .5搬运堆码作业Transporting & Stacking work 1. 搬运时有可能损伤手部和砸伤脚等。When transporting, it may injury hands or feet .2. 搬运时,有可能滑倒、绊倒。 When transporting, may slippery or trip .3. 堆码时有可能跨塌伤人。When stacking ,materials may fall off and injury workers .1. 搬运时,穿戴好PPE。Wear PPE properly .2
10、.行走时,注意脚下的石头、坑洞等。Pay attention to stones or pot hole when walking . 3.堆码弯头不宜过高,并注意安全Stack elbow within a limited height and watch out .6作业结束End of Job 拆除电源线及手持电动工具等,有触电可能。When remove powerline or hand-held grinder ,it may get electric shock .电能隔离后,由专业电工进行拆除作业。It is in charge of special electrician t
11、o remove some electric tools .队员评估-在其它表上列出其它项目(我于这周参加JPA项目,同意并核实风险控制对于所提议工作的重要性)Assessment Team Members(I participated in the JHA carried out for this work and agree/confirm the hazard controls are sufficient for the proposed work)职位 Position签字 /Signature日期/Date1) On-site Manager 项目经理2)On-site Manag
12、er 现场主管3) supervisor 监督4) electrician 电工工作主管和团队-在其它表上列出其它项目(我理解这项工作的需要,存在的危险以及相关控制)Work Supervisor and Team Members(I understand the work required, the hazard and controls identified)1) porter 搬运工2)porter 搬运工3) porter 搬运工4) porter 搬运工5) porter 搬运工6) porter 搬运工7)porter 搬运工8)porter 搬运工9)porter 搬运工10)保
13、管员 warehouse keeper11)保管员 warehouse keeper潜在/相关危险 / Potential or Associated Hazards 滑到/绊倒/跌伤Slips/Trips/Falls 其它(特定)Others (specify)_手指/损伤Hand/Finger injuries 夹伤Pinch Points碎片/微粒Chips / Particles 高处作业Working at Height危险控制和紧急情况/意外事故安排Hazard Controls & Emergency and Contingency Plans工作许可 Work Permit 环境个人保护PPE 其它(特定)Others _ 其它(特定)Others _所需安全设备PPE & Safety Equipment Required 安全帽Hard Hats 安全路障Safety Barricade 安全鞋Safety Shoes 其它(特定)Others _安全镜 Safety Glasses 棉手套Cotton Gloves 防护带Caution Tape专心-专注-专业